: PALMA DE ORO SUBDIVISION


: Jose Abad Santos Avenue, City of San
: P.D. 957
: STA. LUCIA REALTY CORPORATION
: JUNE 16, 2015 Time: 9:30 a.m.
: COMPLAINT

Facts & Findings:


Developments within the project include concrete roads, underground
drainage system, electrical, water distribution system, clubhouse with
swimming pool- with a total development percentage about 98% completed.
On June 16, 2015 at 9:30 oclock in the morning, the Monitoring Unit of
HLURB-Region 3 conducted ocular inspection on the subdivision premises
and the following observations were noted:
1. The development of the project is on its final stage.
2. Perimeter fence is almost 1.5 meter high but since the subdivision is
elevated to at least 1.8 meters, more or less, it is recommended that
the height of the fence must be elevated to at least 3.0 meters in order
to secure the premises of the subdivision to address the reported
serious security concerns/problems of homeowners from the
surrounding communities of illegal settlers.
3. The entrance side walk was encroached by the commercial
establishment built on the corner of Jose Abad Santos Avenue and the
road leading to Entrance Gate.
4. Several roads need repairs due to cracks and deterioration.
5. A security guard is on duty during inspections.
6. Some of the mercury lights of the electric posts are defective and
busted. A small service door located in Block 1 reportedly being used
by Caltex workers to gain access to the subdivision premises is likewise
recommended to be permanently closed for security reasons.