Professional Documents
Culture Documents
Stern Tube Air Guard System PDF
Stern Tube Air Guard System PDF
NO ~~ forward seal tank. ae vy 10°F" on Fig. 1-6 Increase of Decrease a level, —~ 7 Investigation into. other causes. Investigation into the | cause of malfunction alarm. (“Operate as itis. (Oil | |__decreases naturally) | investigate into other | —__»l ig |__cause of oil leakage. Seavey? Investigate into other cause Extract oil from the a down to normal level. 7 Pres cil 1x increase ~ Y YES Investigate into the cause of inflow NO, Operate as i is. 1071 increases naturally)P23—P12<0.029MPa Mining of air in LO. circulation line. Continue operation as | YES ~~ ARI = lowered of taking NO v 3 10°C" on Fig. 1-3 | ¥. ~ Raise the bias of ARI to the pressure at which sir does not mix. (Inform to Japan Marine Technologies Ltd.) } 4 ) Nt 7 > < Was the bias of < > Nem measures according 19 i ye a Land remove it a G3 >G2 on the _NO “~~ air control unit YES ~ ee LZ Bethe vibration of mat shaft abnormally large? —EEe Investigate into the cause of vibration [Seitching over of FVI replacement of ARI at the3K from “F” on Fig. 1-4 —~ Increase of > Abnormality of oil level in) [forward seal tank. (Alarm) [Ai level xo] = = Supply cit forward seal YES Decrease of tank up to norma level Soil evel a ~T SN eas xo] a ae ye (OTs there oil leakage i into other) —____¥ [Adjustment ofthe height of Forward seal | tank lower “Exchange seal rings at proper time, (Works inside a ship) (Trouble of #5 seal ring ) [Operate as itis. (Oil decreased naturally’ Extract oil from forward seal | tank down to normal level _— Frequent increa?~ NO 5 Opera iss of oil level, " to spare ("Raise the discharge pressure) | of PI tillcireulation occurs. ; | | (Adjust a relief valve) i | from “G" on Fig. 1-8 Y 2 S Changeover | from working [is normal. of se i S Repair of working NO Lpump. | Axpare pomp YES_. | Normal condition | ___¥ — [By raising the Bas of ARV ain | P23-P12>0.049MPa | | nform to Japan Mari . Y (Openieasiis Repair or plac at a ery une Unform to Japan Marin Technologies Lx)9 SS GEG9 (Air enit)> (Pump exit) "normal, Ne NO By switching to Wi change over ARI AR? ——!r —_ Bees yes a Replace ARI at the time of Y | port call form to Japan Marine Lid.) \_ Technotogi (Tnvesigne no other Y= | cause, = a ne xoTnvestigat into cause, from “A” on Fig. 1 Clean and filter for pump. regenerate,WORLD-WIDE SERVICE NETWORK Our service network is as bellow. Please refer to shipyard, no., parts no,, and parts name on attached 3-4/2, 2/2 drawings, when ordered. “Europe, The Middle and Near East, African | Wartsila Propulsion Netherlands. (NETHERLANDS) TEL 31-4163-88209 FAX 31-4163-74853 “North and South America 1 Wartsia Lips ine TEL 847-808-9240 FAX 847-808-9295 Asia and Australia Japan Marine Technologies Lid (JAPAN) Head office (TOKYO) TEL (03)5442.2211 FAX (03)5442-2260 TELEX 232-4593 (CHUWAC J) I JMT Korean office (PUSAN) TEL 462-2666 FAX 462-2667 I Chuwac Engineering Pte. Ltd (UMT's Subsidiary in SINGAPORE) TEL 65-8969-125 FAX. 65-8969-151(OMMENE ED |.0. FOR STERN TUBE BEARING AND SEAL In selecting 1.0, lor stern tube bearing and seals, itis necessary fo avaid products that have ble elfects un ster tube seal sings (inade of either nitile oF fluoric rubber). For use with Japan Marine jes's stern tube bearing and seals, we recommend the products listed on allached 2, as hey have pled aiid proven satisfactory. Upon equest, similar tests are conducted on products otver than those (T's standard fur LO. viscosity is tron 300 to GOO SUS at 100 F(37.8 C ). In case of emergency, LO. of preterably the sure type as that for regular use, with a higher viscosity. However, da nut use 1 # long period.MAINTENANCE FOR MICRO-MIST SEPARATOR TO REPLACE ELEMENT > use V4 and V5, open V6 in the air control unit scape pressure cuttipletely int the body with loose the drain cock for low part of micro~mist separator. Make pressure 0 MPs OTe! Please lake eure when loose the drain cock, because lahing pressure in the body, nove four hexagon socket head belt teplave element, gasket and Onring ghten Hexagon socket heed bult for assembling of the micro mist separator Please refer to following) Tine replace the element :tlement operates fur 2 years ~ HEXAGON HEAD BOLT —-- CONDITION DETECTING DEVICE O-RING (useD) Suse) = Ls ELEMENT (useD)75 $ oc = cn -2 THE CENTER OF CASING AND SEAL RING Is concENTRIC 3 y 4, UATE GRIERE OF, 0 D1m “shouLD ae eccenrere ATIACHED- 3% : 44 Zum TOURDS Te LS \ ie AG CONDUCTING LEAKAGE TEST, COMPLETELY REMOVE RAIN E1PING FOR BETWEEN THE AIR IN THE SPACE BETWEEN THE NOS. RZ~H2 SEAL RINGS MITSUBISHI HEAI Sum 3.30 NOT FILL THE LUBRICATE O[L. INTO THE ATR CKAMBER OF THE. SPACE THE NOS. #!~82 SEAL RINGS. HTM 18, 20, 30.71 AND 72 TO.BE LOCKED USING WIRE. ‘ SAPTER TWSTALLAZION. ITEM 26/75 AND J1/76-AND 42 stoULO sre SE TAKEN OFF AND XEBP IN THE SPARE PARTS B TOOL BOX. : L788 6. REMOVE TAB GUNCTAPES, MHC ARE COVERING ATR-PURGRD Smet el eemeemaisetae QD iapanMarineTechnologies Ltd. 8h Ry emu rt A CR 12 TOP _— | kin - STERN TUBE SEAL AIRGUARD 3ASR 2 Tym, 92 mm RC, -STERN_TUBE SEAL AIRGUARD 3ASR 3 dike coc. JOBE nub TYE GASRE (APT) OME 2007) Teareremione, a Bra 5, 7 AMM, 925,77 SRS 1/75, 43S CARBON, + < . Het —— 4 ERR U9 TENE ORR BILE TERRES, CLASS ] To _(Gp O1L_OuTu Ome 24-35DRILL 4 a a NoTe | 4 BT 5K-25A THE CENTER OF CASING AND SEAL RING 1S CONCENTRIC. BUT THE CENTER OF CDIM SHOULD BE ECCENTRIC ONLY . iam TONARD TOP. 2. APTER INSTALLATION, ITEM2S/75 AND 23 SHOULD BE TAKEN OFF AND KEEP INTHE SPARE PARTS & TOOL BOL LYRA ARCO BL ONBRGE D. Lnw TOPELLT, 2, AME 25/75 RBFLUSHING PROCEDURE FOR AIR SUPPLY AND DRAIN LINE OF AIRGUARD 3AS procedure is used for protection and repair of air supply and drain piping line choking ing is executed ballast condition (air pressure in #1 and #2 seal chamber is low) and during shaft stopping ion, At this time, G10 pressure must be 0.024MPa and over, and the differential pressure of #2 S/R be clean water only. te this flushing about once from 1 month to 2 month interval. Jnot touch any valves and/or equipment except below mentioned, imber plates are attached on valves and equipment for indication.) EDURE, coupler (prepared by JMT) on flushing water supply hose (prepared by ship crew), and fix it using band fe by UMT) (See FIG. 1) ect the above mentioned hose with pipe flushing port in air control unit. (See FIG. I) the flushing water pressure is higher than G10. V201 for air control unit, after confirmation of closing of N4. (See FIG. I I) i WATER SUPPLY HOSE — cal) ify \ Ty. \— courver -— INLET OF WATER Front view of AIR CONTROL UNIT Fig. | v201 26pen the valve of Mushing water source from Increase of opening of Na needle valve gradually and keep a float in flow meter to be seal (lush p water supply, ng water quantity is about L/min at scale 2) After one minute flushing, close V201 to pressure to be steady before and after water supply condition lushing water is discharged through drain collection unit, (See FIG.1L) mpletely discharged the Mushing water, open V201 to supply flushing water again epeat this procedure 2 or 3 times) Jisconnect flushing water supply ho: the valve wt drain linc, dis-assembly drain pot for cleaning fier cleaning, restore drain collection unit and open the valve at dr after confirmation of V201 closing n line mbers are referved to attached Pig, Ln some case, valve and gauge numbers are t from Fig, Should you have any question to this, please connect us. Fig. 1 DRAIN COLLECTION UNITT feu Ye ~ DE 35A re 7 o Ea, f a Hl TO PRESS. CAL TO DRAIN TANK na20-280R1LL a 35 lpeay a S | Foner us ye ‘Cortea OF Se ese (orzasctia] SA bes 1325 #1060 a q K-#1230 NOTE) 1 THE CENTER OF CASING AND SEAL RING 15 CONCENTRIC. UE THE CENTER OF ( DIM SHOULD BE ECCENTRIC AA, Lum TOMARDS Tor 2.47 CONDUCTING LEAKAGE Test, COMPLETELY REMOVE ‘THE ATR-IN THE, SPACE BETWEEN THE NOS. f2—#3 SEAL RINGS. 4.00 NOT FILL THE LUBRICATE. OIL. INTO THE AIR CAMBER OF ‘THE SPACE THE NOS. I-A? SEAL RINGS. 4 ex 18 20-30, TL AND 72 TO, Be Lockeo USING wine. SAFER INSTALLATION. UTEW'23/15 AND 31/78 AND 43 sHouLD SELTAKEN OFF ANQ KEEP I THE SPARE PARTS & TOOL BOC 6, REMOVE THE GUM-TAPES, WHICH ARE COVERING AIR-PURGED HOLES, OF THE SEAL-COVER Gp japan MarineTechnologies Ltd. 5B Lior goer rpaziRgs AL CDE 121 maTOPIR: ae ‘DETALL OF STOPPER FOR Hi~ii2ROZ~a mmm Nim STERN TUBE SEAL ATRGUARD 3AS_| $20 Ls sim) costa 10 2 eNom 12-p memmaeR IL, size A 5 pregame cae. 19] (BeAdteli] c [1080 __ Eat KSA APT) Cet oman mm ttf | —_ Bru TR MADE (I TENE) OBER CLT CLASS: ABS _ gt] $58,07-81| a | #9] RBGabdsAl] b Tk. ry, TSUIIASHL REQ: _1SET/1SHIP “sp samatal enw ICT ss65) 4X18 Con CENTER OF Sen = faye, SEA NG 2 = a 2) S13] Sz OIL INLET 5K-254= 9 He) y ® 4 : xO e s 1246/7878 NOTH 1 THE CENTER OF CASING AND SEAL RING 18 concENTRIC A ; Pali) CENTER OF CDIM- en BE Peale ONLY 0, Timm TOWARD TOP, STERN TUBE SEAL STERNGUARD MARKIR AFTER NSTALLATION. TTES/13 AND 29 SHOULD BE TREN OFF AND KEEP STE Ue BEAL STeRNCUAD IW SPARE PALTS & TOOL BOE Tos0 SABE 27RD (FWD) _ | A WL meethoesmuypporaeees MDNR 6 Tm THPHAROLTS, Tags - Pe rosavasit PAR or ot 2 Ae 25/1202 CHIR. (CLASS: A 1S] HEME | a Face ASET/ ISHIP TT = L| | eye Laie} sa. swe) [ere TSLPTION camape ara] feorswen Saeed ay a aa me oe tat Do SEER eee] PLAN OF] ITEM 7 3] 1 jo, eo Pram i 4}? a fyoruaL so aan rv ore, 6 [1 [1 GLemenr ontyy Pesto St seeauaTon ei Se Ha as fe on Tit 2380 amr ‘ 8 [2 [2 @rement ony eeeAne aime ei. ne L_ 3 {3 or ve fue Lee ot i ated = 2 is Sn incon we MP2, NPS. NPS AUTOMATIC AIR CONTROL UNIT FOR APT SEAL & S/T ne6 63. LO TANK PRESS. vor: har ero x23 (@iopeattarmtctnetogiesins | [ 62 AFT SEAL PRESS. CHANGE OVER FW wer nee MITSUBISHI HEAVY INDUSTRIES LTD. custoME AIR RELAY’ {ARL A-LINE} AIR RELAY’ ; Be 7 Toe TOT —— ene 1246/178/3 ist] sap. oy 01 | a 'V] KOBAYASHI (=> @ Japan MarineTechnologies Ltd.1 1 iL STEEL TFRAWE ~ $5400 ack ala STATMLass SHURA 50513 [aes oT WEI alin STATNAss STHEL[ruNcr JOuNT —_Susitt_—_ 22a ale ont |rnutie %e_— pun | ans seta tour 5 3 Eat [user ala TEAL Ic aUSinE awe PLATE cl nal ass [arte oUF oases FIZ ale STATMuass STARU[caTe VALVE 50513 [eee 1t-Is 17 state an main oiscaaned Unie aes sinc wha waite sraet—|svorren ss10t_— habs ale STATnuess STAHL weTaNTG VALVE 515316 eam $5 bro rnuss vce oir 4 SK-15A PAINT : MUNSELL N-8. 0 THO at Ht Sidi, i : D) | MITSUBISHI HEAVY INDUSTRIES LTD y cusTONER 40 SPRL 1246/178/9 ih Ep japan MarineTechnologies Ltd. TITLE DRAIN COLLECTION UNIT {sara FLW)33) a KOBAYASHI -‘ALARM_TO. CONTROL ROOM ~*” oe RAE oosa0 You might also like
The Subtle Art of Not Giving a F*ck: A Counterintuitive Approach to Living a Good LifeFrom EverandThe Subtle Art of Not Giving a F*ck: A Counterintuitive Approach to Living a Good LifeRating: 4 out of 5 stars4/5 (5825) The Gifts of Imperfection: Let Go of Who You Think You're Supposed to Be and Embrace Who You AreFrom EverandThe Gifts of Imperfection: Let Go of Who You Think You're Supposed to Be and Embrace Who You AreRating: 4 out of 5 stars4/5 (1093) Never Split the Difference: Negotiating As If Your Life Depended On ItFrom EverandNever Split the Difference: Negotiating As If Your Life Depended On ItRating: 4.5 out of 5 stars4.5/5 (852) Grit: The Power of Passion and PerseveranceFrom EverandGrit: The Power of Passion and PerseveranceRating: 4 out of 5 stars4/5 (590) Hidden Figures: The American Dream and the Untold Story of the Black Women Mathematicians Who Helped Win the Space RaceFrom EverandHidden Figures: The American Dream and the Untold Story of the Black Women Mathematicians Who Helped Win the Space RaceRating: 4 out of 5 stars4/5 (903) Shoe Dog: A Memoir by the Creator of NikeFrom EverandShoe Dog: A Memoir by the Creator of NikeRating: 4.5 out of 5 stars4.5/5 (541) The Hard Thing About Hard Things: Building a Business When There Are No Easy AnswersFrom EverandThe Hard Thing About Hard Things: Building a Business When There Are No Easy AnswersRating: 4.5 out of 5 stars4.5/5 (349) Elon Musk: Tesla, SpaceX, and the Quest for a Fantastic FutureFrom EverandElon Musk: Tesla, SpaceX, and the Quest for a Fantastic FutureRating: 4.5 out of 5 stars4.5/5 (474) Her Body and Other Parties: StoriesFrom EverandHer Body and Other Parties: StoriesRating: 4 out of 5 stars4/5 (823) The Sympathizer: A Novel (Pulitzer Prize for Fiction)From EverandThe Sympathizer: A Novel (Pulitzer Prize for Fiction)Rating: 4.5 out of 5 stars4.5/5 (122) The Emperor of All Maladies: A Biography of CancerFrom EverandThe Emperor of All Maladies: A Biography of CancerRating: 4.5 out of 5 stars4.5/5 (271) The Little Book of Hygge: Danish Secrets to Happy LivingFrom EverandThe Little Book of Hygge: Danish Secrets to Happy LivingRating: 3.5 out of 5 stars3.5/5 (403) The World Is Flat 3.0: A Brief History of the Twenty-first CenturyFrom EverandThe World Is Flat 3.0: A Brief History of the Twenty-first CenturyRating: 3.5 out of 5 stars3.5/5 (2259) The Yellow House: A Memoir (2019 National Book Award Winner)From EverandThe Yellow House: A Memoir (2019 National Book Award Winner)Rating: 4 out of 5 stars4/5 (98) Devil in the Grove: Thurgood Marshall, the Groveland Boys, and the Dawn of a New AmericaFrom EverandDevil in the Grove: Thurgood Marshall, the Groveland Boys, and the Dawn of a New AmericaRating: 4.5 out of 5 stars4.5/5 (266) A Heartbreaking Work Of Staggering Genius: A Memoir Based on a True StoryFrom EverandA Heartbreaking Work Of Staggering Genius: A Memoir Based on a True StoryRating: 3.5 out of 5 stars3.5/5 (231) Team of Rivals: The Political Genius of Abraham LincolnFrom EverandTeam of Rivals: The Political Genius of Abraham LincolnRating: 4.5 out of 5 stars4.5/5 (234) Engine Top Bracing.Document32 pagesEngine Top Bracing.Kr Manu100% (6) On Fire: The (Burning) Case for a Green New DealFrom EverandOn Fire: The (Burning) Case for a Green New DealRating: 4 out of 5 stars4/5 (74) The Unwinding: An Inner History of the New AmericaFrom EverandThe Unwinding: An Inner History of the New AmericaRating: 4 out of 5 stars4/5 (45) RT-137 - A2 - Issue2 - Wartsila ICU On Board Repair KitsDocument7 pagesRT-137 - A2 - Issue2 - Wartsila ICU On Board Repair KitsKr Manu100% (2) Indian Ocean Memorandum of Understanding (MOU) Detention Review PanelDocument4 pagesIndian Ocean Memorandum of Understanding (MOU) Detention Review PanelKr ManuNo ratings yet Technical Bulletin RT-108: Wärtsilä Low-Speed EnginesDocument6 pagesTechnical Bulletin RT-108: Wärtsilä Low-Speed EnginesKr ManuNo ratings yet Technical Bulletin: Wärtsilä Low-Speed EnginesDocument5 pagesTechnical Bulletin: Wärtsilä Low-Speed EnginesKr ManuNo ratings yet Preferential TripsDocument1 pagePreferential TripsKr ManuNo ratings yet Cooling Water Inlet Tem-Perature at Scavenge Air Cooler: Service Letter SL2014-589/MTSDocument2 pagesCooling Water Inlet Tem-Perature at Scavenge Air Cooler: Service Letter SL2014-589/MTSKr ManuNo ratings yet IFA End Flange Leakage: Service Letter RT-101Document7 pagesIFA End Flange Leakage: Service Letter RT-101Kr ManuNo ratings yet Filter Candle Care 2013 FinalDocument15 pagesFilter Candle Care 2013 FinalKr Manu100% (2) Refrigerant Handling Guide 2018 Id 802170 DigitalDocument19 pagesRefrigerant Handling Guide 2018 Id 802170 DigitalKr ManuNo ratings yet Catalytic Fines - Safe Operation...Document40 pagesCatalytic Fines - Safe Operation...Kr ManuNo ratings yet Reverse Power TripsDocument2 pagesReverse Power TripsKr ManuNo ratings yet Life BoatDocument40 pagesLife BoatKr ManuNo ratings yet CablesDocument1 pageCablesKr ManuNo ratings yet Nodular Cast Iron, and A Ram. Each Pair of Cylinders Is Tied Together Axially by A Guide Bar and Adjacent Cylinders AreDocument10 pagesNodular Cast Iron, and A Ram. Each Pair of Cylinders Is Tied Together Axially by A Guide Bar and Adjacent Cylinders AreKr Manu100% (1) Ts 702Document62 pagesTs 702Kr ManuNo ratings yet