NO

A.
B.
C.
D.
E.
F.
G.

URAIAN PEKERJAAN
RAB
RAB
RAB
RAB
RAB
RAB
RAB

PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN

SAT

VOLUME

H.SATUAN

PERSIAPAN
STRUKTUR
ARSITEKTUR
FAADE
MEKANIKAL & ELEKTRIKAL
BANGUNAN PENUNJANG
SITE DEVELOPMENT
SUB. JUMLAH TOTAL KONSTRUKSI
DIBULATKAN
PPN

TOTAL BIAYA KONSTRUKSI


Terbilang :

#NAME?

JUMLAH BIAYA

JUMLAH BIAYA
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,011,089,307.80
4,045,304,246.34
3,007,722,426.69
1,168,792,635.92
3,163,853,344.00
1,089,809,582.26
721,262,953.00
###

Rp

14,207,834,496.02

Rp

14,207,800,000.00

Rp

1,420,780,000.00

Rp

15,628,580,000.00

Jakarta, 11 Juni 2013


PT. Nugraha Adi Taruna

Ir. G.T. Yudi Rahman

Direktur Utama

NO
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

URAIAN PEKERJAAN

VOLUME

SAT

HARGA

JUMLAH

PEKERJAAN PERSIAPAN
Pembersihan & Persiapan Lokasi
Pengukuran & Bouwplank
Pembuatan Direksi Keet
Pembuatan Barak Pekerja dan Gudang
Air Kerja + Listrik
Shop Drawing
Asbuilt Drawing
Perijinan Bangunan
Asuransi ( C.A.R, ASTEK, dll )
Telepon
Sewa Scafolding @450 set
Sewa Genset kap 100 kva (untuk penerangan)
Administrasi Proyek
Foto / Dokumentasi Proyek
Biaya House keeping + K3
Urugan tanah dan pemadatan area gedung
Penyambungan daya listrik (prov sum)

1,523.00
196.00
30.00
100.00
6.00
6.00
1.00
1.00
1.00
3.00
3.00
3.00
3.00
3.00
3.00
228.45
1.00

m2
m1
m2
m2
bln
bln
ls
ls
ls
bln
bln
bln
bln
bln
bln
m3
ls

16,150.00
78,801.00
954,836.56
654,064.10
11,196,000.00
2,799,000.00
4,000,000.00
186,600,000.00
55,980,000.00
1,399,500.00
9,330,000.00
4,665,000.00
2,332,500.00
933,000.00
3,732,000.00
55,900.00
466,500,000.00

TOTAL PEKERJAAN PERSIAPAN

24,596,450.00
15,444,996.00
28,645,096.80
65,406,410.00
67,176,000.00
16,794,000.00
4,000,000.00
186,600,000.00
55,980,000.00
4,198,500.00
27,990,000.00
13,995,000.00
6,997,500.00
2,799,000.00
11,196,000.00
12,770,355.00
466,500,000.00
1,011,089,307.80

(2) Persiapan - hal : 5 / 324

NO

URAIAN PEKERJAAN

VOL.

PEKERJAAN STRUKTUR
I

PEKERJAAN PONDASI DAN LANTAI 1


1 Tiang Pancang uk.250x250
- Mobilisasi & demobilisasi
- Material, upah pancang
2 Pile Caps
- Beton K-300Ready mix
- Besi
- Begisting batako 1 : 6
- Lantai kerja, t=30 mm
- Urugan pasir,dipadatkan t=100 mm
- Galian tanah untuk pondasi
3 Pondasi Tapak
- Beton K-300Ready mix
- Besi
- Begisting
- Lantai kerja, t=30 mm dibawah pondasi
- Urugan pasir,dipadatkan t=100 mm dibawah Pondasi
- Galian tanah untuk pondasi

II

1.00
68.00

19.45
2,189.01
138.90
0.81
3.85
13.58

0.80
120.00
3.20
0.12
0.40
6.00

4 Separasi Lantai t=120 mm


- Beton K-300
- Besi wire mess M8-200
- Plastik
- Urugan pasir,dipadatkan t=100 mm

192.00
1,600.00
1,600.00
160.00

5 Tie beam (TB)


- Beton K-300
- Besi kg/m3
- Begisting

82.39
9,509.06
625.60

PEKERJAAN STRUKTUR LANTAI DUA


1 Pelat lantai Atas t=120 mm
- Beton K-300 Ready mix
- Besi wire mess M8-200

178.80
1,490.00

NO

URAIAN PEKERJAAN

VOL.

- Bondex t=0,75 mm

1,490.00

2 Kolom Pedestal beton


- Beton K-300 Ready mix
- Besi
- Begisting

16.50
3,291.67
132.00

3 Kolom baja
- K1 (H.300.300.10.15) pedestal ke lantai 2
- Base Plat t=25 mm
- Pelat Rib t=8 mm
- Angkur M22 L=755 mm

16,544.00
884.22
994.75
176.00

NO

URAIAN PEKERJAAN
4 Balok baja Lantai atap
- B1 (WF.150.75.5.7 + Asesoris)
- B2 (WF.200.100.5,5.8 + asesoris)
- B3 (WF.250.125.6.9 + asesoris)
- B4 (WF.300.150.6,5.9 + asesoris)
- B5 (WF.400.200.8.13+ asesoris)
- Pelat Rib t=8 mm
- Pelat Buhul t=12 mm
- Baut HTB M20 (A325)

III

VOL.

5,559.30
6,393.60
3,853.50
17,820.00
1,253.33
2,339.55
1,376.00

5 Tangga lantai 1 ke lantai 2


- Beton K-300 Ready mix
- Besi
- Begisting

13.30
1,995.00
38.00

6 Balok Canopy
- B1 (WF.150.75.5.7 + Asesoris)

1,350.00

PEKERJAAN STRUKTUR LANTAI ATAP


1 Pelat lantai Atas t=120 mm
- Beton K-300 Ready mix
- Besi wire mess M8-200
- Bondex t=0,75 mm

89.04
742.00
742.00

2 Kolom baja
- K2 (H.300.300.10.15) Lantai 1 Ke atap
- K3 (H.300.150.6,5.9) Lantai 1 Ke atap
- Base Plat t=25 mm
- Pelat Rib t=8 mm
- Baut M20 (HTB A.325)

6,392.00
2,936.00
353.25
457.81
80.00

3 Balok baja Lantai atap


- B1 (WF.150.75.5.7 + Asesoris)
- B2 (WF.200.100.5,5.8 + asesoris)
- B3 (WF.250.125.6.9 + asesoris)
- B4 (WF.300.150.6,5.9 + asesoris)
- B5 (WF.400.200.8.13+ asesoris)
- Pelat Rib t=8 mm
- Pelat Buhul t=12 mm
- Baut HTB M20 A325

5,239.80
355.20
4,404.00
9,504.00
702.89
1,149.62
692.00

NO

III

URAIAN PEKERJAAN

VOL.

PEKERJAAN STRUKTUR ATAP


1 Rangka Atap R1 (WF.250.125.6.9)+Asesoris
2 KP (WF.150.75.5.7)+Asesoris
3 Gording C.125.50.20.2,3+Asesoris
4 Ikatan Angin diameter 16+ Asesoris
5 Trekstang diameter 12+ Asesoris
6 Pelat Rib t=8 mm
7 Pelat Buhul t=12 mm
8 Baut HTB M14 A325

5,470.08
756.00
4,091.47
530.05
290.70
279.40
233.40
110.00

NO

URAIAN PEKERJAAN

9 Baut M12 untuk Kopel


10 Baut M10 Untuk Gording
11 Pek. Penutup Atap, dengan tahapan sbb. :
- Pas. Air-Cell Retro E, Fire Reterdant (double side allumunium
foil) sebagai penahan panas & suara.
- Pas. Atap Metal ZINCALUM, type Spandek
tebal 0,45 mm.
12 Pas. Nok / bubungan, dari produk yang sama
13 Pekerjaan Water Profing Membran Bakar + Scred + Kawat ayam

VOL.
36.00
576.00

860.00
860.00
54.00
742.00

TOTAL PEKER

SAT.

HARGA (Rp)

JUMLAH (Rp)

Ls
ttk

4,665,000.00
1,583,400.00

4,665,000.00
107,671,200.00

m3
kg
m2
m3
m3
m3

988,082.00
13,213.89
85,027.00
747,798.00
223,414.00
44,668.00

19,217,206.82
28,925,352.38
11,810,250.30
608,240.20
860,590.73
606,394.90

m3
kg
m2
m3
m3
m3

988,082.00
13,213.89
85,027.00
747,798.00
223,414.00
44,668.00

790,465.60
1,585,666.80
272,086.40
89,735.76
89,365.60
268,008.00

m3
m2
m2
m3

988,082.00
68,214.20
4,600.00
223,414.00

189,711,744.00
109,142,720.00
7,360,000.00
35,746,240.00

m3
kg
m2

988,082.00
13,213.89
85,027.00

81,403,135.57
125,651,738.50
53,192,891.20

Total I

779,668,032.76

988,082.00
68,214.20

176,669,061.60
101,639,158.00

m3
m2

SAT.

HARGA (Rp)

JUMLAH (Rp)

m2

209,727.40

312,493,826.00

m3
kg
m2

988,082.00
13,213.89
111,800.00

16,303,353.00
43,495,776.43
14,757,600.00

kg
kg
kg
bh

17,861.86
17,861.86
17,861.86
139,900.00

295,506,611.84
15,793,885.30
17,768,120.96
24,622,400.00

SAT.

HARGA (Rp)

JUMLAH (Rp)

kg
kg
kg
kg
kg
kg
kg
bh

17,861.86
17,861.86
17,861.86
17,861.86
17,861.86
17,861.86
17,861.86
46,600.00

99,299,438.30
114,201,588.10
68,830,677.51
318,298,345.20
22,386,822.86
41,788,736.00
64,121,600.00

m3
kg
m2

988,082.00
13,213.89
111,800.00

13,141,490.60
26,361,710.55
4,248,400.00

kg

46,600.00

62,910,000.00

Total II

1,854,638,602.23

m3
m2
m2

988,082.00
68,214.20
209,727.40

87,978,821.28
50,614,936.40
155,617,730.80

kg
kg
kg
kg
bh

17,861.86
17,861.86
17,861.86
17,861.86
46,600.00

114,173,009.12
52,442,420.96
6,309,702.05
8,177,373.85
3,728,000.00

kg
kg
kg
kg
kg
kg
kg
bh

17,861.86
17,861.86
17,861.86
17,861.86
17,861.86
17,861.86
17,861.86
46,600.00

93,592,574.03
6,344,532.67
78,663,631.44
169,759,117.44
12,554,904.91
20,534,294.34
32,247,200.00

SAT.

kg
kg
kg
kg
kg
kg
kg
bh

HARGA (Rp)

JUMLAH (Rp)

Total II

892,738,249.28

17,861.86
17,861.86
17,861.86
17,861.86
17,861.86
17,861.86
17,861.86
23,300.00

97,705,803.15
13,503,566.16
73,081,300.06
9,467,716.33
5,192,450.68
4,990,531.24
4,169,030.46
2,563,000.00

SAT.

HARGA (Rp)

JUMLAH (Rp)

bh
bh

20,900.00
18,600.00

752,400.00
10,713,600.00

m2

69,900.00

60,114,000.00

m2
m'
m2

209,727.40
69,900.00
69,900.00

180,365,564.00
3,774,600.00
51,865,800.00

Total III

518,259,362.07

TOTAL PEKERJAAN STRUKTUR Rp

4,045,304,246.34

NO

URAIAN PEKERJAAN

C. PEKERJAAN ARSITEKTUR
I
A.
1
2
3
4
5
6
7

PEKERJAAN PASANGAN DINDING, PLASTERAN


PEKERJAAN LANTAI SATU
Pasangan Dinding Bata Ringan HEBEL uk 600/200/100 mm
a. MU - 380
Plesteran Dinding Bata HEBEL, t : 2 cm
a. Plesteran 1 : 4
Acian Dinding Bata Hebel, setara Mortar Utama (MU 200)
Pasang lintel 100 x 100 mm
Opening Kusen Pintu Jendela Aluminium : Plester Aci
Benangan Sudut Kolom, Dinding : Plester Aci
Pasang Cubical Toilet lengkap
a. Toilet Wanita
b. Toilet Pria
c. Urinoir
Pasang Partisi , double Gypsum Baord 12 mm, ex Jaya Board
lengkap rangka metal stud
SUB JUMLAH I A.

B.
1
2
3
4
5
6
7

PEKERJAAN LANTAI DUA


Pasangan Dinding Bata Ringan HEBEL uk 600/200/100 mm
a. MU - 380
Plesteran Dinding Bata HEBEL, t : 2 cm
a. Plesteran 1 : 4
Acian Dinding Bata Hebel, setara Mortar Utama (MU 200)
Pasang lintel 100 x 100 mm
Opening Kusen Pintu Jendela Aluminium : Plester Aci
Benangan Sudut Kolom, Dinding : Plester Aci
Pasang CubicalToilet lengkap
a. Toilet Wanita
b. Toilet Pria
c. Urinoir
Pasang Partisi , double Gypsum Baord 12 mm, ex Jaya Board
lengkap rangka metal stud
SUB JUMLAH I B.

C.

PEKERJAAN LANTAI DAK

Pasangan Dinding Bata Ringan HEBEL uk 600/200/100 mm


a. MU - 380
Plesteran Dinding Bata HEBEL, t : 2,5 cm
a. Plesteran 1 : 4
Acian Dinding Bata Hebel, setara Mortar Utama (MU 200)

3
4

NO
5
6
7

URAIAN PEKERJAAN
Pasang lintel 100 x 100 mm
Opening Kusen Pintu Jendela Aluminium : Plester Aci
Benangan Sudut Kolom, Dinding : Plester Aci
SUB JUMLAH I C.
JUMLAH BIAYA PEKERJAAN PASANGAN DINDING DAN PLESTERAN

II

PEKERJAAN PASANGAN KOSEN PINTU DAN JENDELA

A.

PEKERJAAN LANTAI SATU

TYPE P1 uk 900 x 2150/2700 mm


Kosen Aluminuium 4" warna putih ex Alexindo
Daun Pintu Teakblock + Kaca Buram
Finshing Melamic Daun Pintu
Engsel 4" ex Solid
Lever Handel + Lockset ex Dekkson
Kaca Buram 5 mm

TYPE PT uk 800 x 2150/2700 mm (Toilet)


Kosen Aluminuium 4" warna putih ex Alexindo
Daun Pintu Teakblock
Finshing Melamic Daun Pintu
Engsel 4" ex Solid
Lever Handel + Lockset ex Dekkson
Kaca Buram 5 mm

TYPE P2 ( 2 daun ), uk 1300 x 2150/2700 mm


Kosen Aluminuium 4" warna putih ex Alexindo
Daun Pintu Teakblock + Kaca Buram
Finshing Melamic Daun Pintu
Engsel 4" ex Solid
Lever Handel + Lockset ex Dekkson
Kaca Buram 5 mm
Grendel tanam

TYPE PF2 (Frame Less, 2 daun) uk 1800 x 2150/2700


Pintu Tempered Glass 10 mm, Frame Less
Lengkap Asesories ex Dorma ( 2 daun )
Kaca Polos 10 mm Ventilasi

TYPE PF1 (Frame Less, 1 daun) uk 900 x 2150/2700


Pintu Tempered Glass 10 mm, Frame Less
Lengkap Asesories ex Dorma ( 2 daun )
Kaca Polos 10 mm Ventilasi

NO
6

URAIAN PEKERJAAN
TYPE PS (Pintu Shaft)
SUB JUMLAH II A.

B.

PEKERJAAN LANTAI DUA

TYPE P1 uk 900 x 2150/2700 mm


Kosen Aluminuium 4" warna putih ex Alexindo
Daun Pintu Teakblock + Kaca Buram
Finshing Melamic Daun Pintu
Engsel 4" ex Solid
Lever Handel + Lockset ex Dekkson
Kaca Buram 5 mm

TYPE PT uk 800 x 2150/2700 mm (Toilet + R. Wudhu)


Kosen Aluminuium 4" warna putih ex Alexindo
Daun Pintu Teakblock
Finshing Melamic Daun Pintu
Engsel 4" ex Solid
Lever Handel + Lockset ex Dekkson
Kaca Buram 5 mm

TYPE P2 ( 2 daun ), uk 1300 x 2150/2700 mm


Kosen Aluminuium 4" warna putih ex Alexindo
Daun Pintu Teakblock + Kaca Buram
Finshing Melamic Daun Pintu
Engsel 4" ex Solid
Lever Handel + Lockset ex Dekkson
Kaca Buram 5 mm
Grendel tanam

TYPE PF2 (Frame Less, 2 daun) uk 1800 x 2150/2700


Pintu Tempered Glass 10 mm, Frame Less
Lengkap Asesories ex Dorma ( 2 daun )
Kaca Polos 10 mm Ventilasi

TYPE PS (Pintu Shaft)


SUB JUMLAH II B.

C.

PEKERJAAN LANTAI ATAP / DAK

Type Pintu Besi


SUB JUMLAH II C.

NO

URAIAN PEKERJAAN
JUMLAH BIAYA PEKERJAAN KOSEN PINTU JENDELA

NO

URAIAN PEKERJAAN

III

PEKERJAAN PASANGAN LANTAI

A.

PEKERJAAN LANTAI SATU

B.
1

Pasang Homogenous Tile ex Sandimas, setara uk 600 x 600 mm


a. Lantai Dasar
b. Tangga
Pasang plint Homogenous Tile 100 x 600 mm
a. Lantai Dasar
b. Tangga
Pasang Keramik ex Roman Gol. B uk. 300 x 300 mm
a. Toilet Wanita
b. Toilet Pria
c. Toilet di R, Makan
Pasang Keramik Dinding, Ex Roman Gol B uk. 300 x 600 mm
a. Toilet Wanita
b. Toilet Pria
c. Toilet di R, Makan
Pasang Border ex Roman uk 100 x 300 mm, di tengah (Warna Hitam)
a. Toilet Wanita
b. Toilet Pria
c. Toilet di R, Makan
Pasang Border ex Roman uk 170 x 300 mm, di bawah (Warna Hitam)
a. Toilet Wanita
b. Toilet Pria
c. Toilet di R, Makan

PEKERJAAN LANTAI DUA


Pasang Homogenous Tile ex Sandimas, setara uk 600 x 600 mm
a. Lantai Dasar
b. Tangga
Pasang plint Homogenous Tile 100 x 600 mm
a. Lantai Dasar
b. Tangga
Pasang Keramik ex Roman Gol. B uk. 300 x 300 mm
a. Toilet Wanita
b. Toilet Pria
Pasang Keramik Dinding, Ex Roman Gol B uk. 300 x 600 mm
a. Toilet Wanita
b. Toilet Pria
Pasang Border ex Roman uk 100 x 300 mm, di tengah (Warna Hitam)
a. Toilet Wanita
b. Toilet Pria

NO
8

C.
1

URAIAN PEKERJAAN
Pasang Border ex Roman uk 170 x 300 mm, di bawah (Warna Hitam)
a. Toilet Wanita
b. Toilet Pria

PEKERJAAN LANTAI DAK


Pasang Homogenous Tile ex Sandimas, setara uk 600 x 600 mm
a. Lantai Tangga
Pasang plint Homogenous Tile 100 x 600 mm
a. Lantai Tangga

JUMLAH BIAYA PEKERJAAN PASANGAN LANTAI

NO

URAIAN PEKERJAAN

IV

PEKERJAAN PASANGAN PLAFOND

A.

PEKERJAAN LANTAI SATU

4
5

Pas ceiling gypsum board 9 mm ex Jaya Board setara


lengkap rangka hollow 40/40 mm dan 20/40 mm + penggantung
a. Koridor
b. R. Rapat
c. R. CCTV
d. Pantry
e. R. Panel
f. R. Rapat Besar
g. Tea Room
h. R. Makan
Pas ceiling Gypsum Tile 600 x 1200 mm
lengkap rangka hollow 40/40 mm dan 20/40 mm + penggantung
a. R. Staff (74 orang)
b. R. Kabid
c. R. Sekretaris
d. R. Direktur
e. R. Kabid
f. R. Sekretaris
g. R. Direktur
h. R. Staff (54 orang)
i. R. Tamu dan R. Sekretaris
j. R. Deputi
Plafon Drop Ceiling, Gypsum Board 9 mm
a. R. Rapat
b. R. Rapat Besar
Pas Plafond ACP di Teras Utama, lengkap rangka
Pas ceiling gypsum Kalsiboard or GRC 4 mm
lengkap rangka hollow 40/40 mm dan 20/40 mm + penggantung
a. Toilet Wanita
b. Toilet Pria
c. Teras Belakang
d. Janitor
e. Pantry
f. Toilet
Pasang List plafond (Profil Aluminium "U")
a. Koridor
b. R. Rapat
c. R. CCTV
d. Pantry
e R. Panel
f. R. Rapat Besar

NO

URAIAN PEKERJAAN
g.
h.
i.
j.
k.
l.
m.
n.
o.
p.
q.
r.
s.
t.
u.
v.
w.

Tea Room
R. Makan
R. Staff (74 orang)
R. Kabid
R. Sekretaris
R. Direktur
R. Kabid
R. Sekretaris
R. Direktur
R. Staff (54 orang)
R. Tamu dan R. Sekretaris
R. Deputi
Toilet Wanita
Toilet Pria
Janitor
Pantry
Toilet
SUB JUMLAH IV A.

NO
B.
1

3
5

URAIAN PEKERJAAN
PEKERJAAN LANTAI DUA
Pas ceiling gypsum board 9 mm ex Jaya Board setara
lengkap rangka hollow 40/40 mm dan 20/40 mm + penggantung
a. R. Perpustakaan, Tea Room
b. R. Rapat
c. Koridor + Mushallah
d. Lobby
Pas ceiling Gypsum Tile 600 x 1200 mm
lengkap rangka hollow 40/40 mm dan 20/40 mm + penggantung
a. R. Staff ( 116 orang )
b. R. Kabid
c. R. Direktur
d. R. Sekretaris
e. R. Staff ( 56 orang )
f. R. B2PT
g. R. Kabid
h. R. Direktur
i. R. Sekretaris
Plafon Drop Ceiling, Gypsum Board 9 mm
a. Lobby
Pas ceiling gypsum Kalsiboard or GRC 4 mm
lengkap rangka hollow 40/40 mm dan 20/40 mm + penggantung
a. Toilet Wanita
b. Toilet Pria
c. Teras Belakang
Pasang List plafond (Profil Aluminium "U")
a. R. Perpustakaan, Tea Room
b. R. Rapat
c. Koridor + Mushallah
d. Lobby
e R. Staff ( 116 orang )
f. R. Kabid
g. R. Direktur
h. R. Sekretaris
i. R. Staff ( 56 orang )
j. R. B2PT
k. R. Kabid
l. R. Direktur
m. R. Sekretaris
n. Toilet Wanita

NO

URAIAN PEKERJAAN
o.

Toilet Pria
SUB JUMLAH IV B.

C.

PEKERJAAN LANTAI DAK

Pas ceiling gypsum board 12 mm ex Jaya Board setara


lengkap rangka hollow 40/40 mm dan 20/40 mm + penggantung
a. Tangga
Pasang List plafond (Profil Aluminium "U")
a. Tangga

SUB JUMLAH IV C.
JUMLAH BIAYA PEKERJAAN PASANGAN PLAFOND

PEKERJAAN PENGECATAN

A.

PEKERJAAN LANTAI SATU

1
2
3

Pengecatan dgn Cat Catylac setara


a. Dinding Tembok Bag. Dalam
Cat Plafond, setara Catylac
Cat Partisi ex Catylac , setara
SUB JUMLAH V A.

NO
B.
1
2
3

URAIAN PEKERJAAN
PEKERJAAN LANTAI DUA
Pengecatan dgn Cat Catylac setara
a. Dinding Tembok Bag. Dalam
Cat Plafond, setara Catylac
Cat Partisi ex Catylac , setara
SUB JUMLAH V B.

C.

PEKERJAAN LANTAI DAK

Pengecatan dengan Cat DULUX


Weathersield dulux / setara
a. Dinding Bagian Luar
Pengecatan dgn Cat Catylac setara
a. Dinding Tembok Bag. Dalam
Cat Plafond, setara Catylac

2
3

SUB JUMLAH V C.
JUMLAH BIAYA PEKERJAAN PENGECATAN

VI
A.
1

PEKERJAAN SANITAIR
PEKERJAAN LANTAI SATU

2
3
4
5
6
8
9
10
11
12
13
14
15

Pas. Closet Duduk ex TOTO, Type CW 420J / SW420JP lengkap


a. Toilet Wanita
b. Toilet Pria
c. Toilet di R. Makan
Pas Closet Jongkok ex Toto, Type CE9/TV150NWV12J
Pas. Floor Drain ex Toto TX 1 BN
Pas. Washtafel ex TOTO, Type L521V1A, lengkap Faucet (TX111LRYR)
Pas Urinoir U 57M ex TOTO
Pas Jet washer ex TOTO, Tyoe TX 403SN5
Pas Paper Holder ex TOTO, Type TS 116 SR
Pas Kaca Cermin 6 mm di bevel 25 mm, uk 1800 x 1000 mm
Pas Cove Lampu uk 200 x 1800 mm
Pas Hand Shower Set ex Toto, Type TX 423 SZ
Pas Kaca Cermin 6 mm di bevel 25 mm, uk 1000 x 1000 mm
Pas Cove Lampu uk 200 x 1000 mm
Pas Kitchen Zink 1 Lubang, 1 Sayap ex Royal, lengkap kran Bebek
Kran Air di Janitor ex TOTO, Type T 23 B13

B.

PEKERJAAN LANTAI DUA

NO
1

2
3
4
5
6
8
9
10
11
12

URAIAN PEKERJAAN
Pas. Closet Duduk ex TOTO, Type CW 420J / SW420JP lengkap
a. Toilet Wanita
b. Toilet Pria
Pas Closet Jongkok ex Toto, Type CE9/TV150NWV12J
Pas. Floor Drain ex Toto TX 1 BN
Pas. Washtafel ex TOTO, Type L521V1A, lengkap Faucet (TX111LRYR)
Pas Urinoir U 57M ex TOTO
Pas Jet washer ex TOTO, Tyoe TX 403SN5
Pas Paper Holder ex TOTO, Type TS 116 SR
Pas Kaca Cermin 6 mm di bevel 25 mm, uk 1800 x 1000 mm
Pas Cove Lampu uk 200 x 1800 mm
Pas Kitchen Zink 1 Lubang, 1 Sayap ex Royal, lengkap kran Bebek
Kran Air di R. Wudhu ex TOTO, Type T 23 B13

JUMLAH BIAYA PEKERJAAN SANITAIR

NO
VII.
1

2
3
4
5

URAIAN PEKERJAAN
PEKERJAAN LAIN - LAIN
Pasang railing tangga dari Lt Satu - Lt Tiga
- Railing Pipa Hitam 2", finish cat
- Besi Hollow 40/40, 20/40 finish cat
- Railing Besi 20 mm
Pasang Railing Stainless Steel di Void
Screed Dak beton + Water Proofing Lantai Atap Dak Beton
Water Proofing Lantai, Toilet
Pasang Meja Beton Toilet uk 600 x 1800 mm, dan 600 x 1000 mm
a. Meja Beton K 175
b. Finish Keramik ex Roman Gol B, uk 300 x 300 mm
Meja Beton Dapur LT Satu ( 2 buah ), Lt Dua ( 1 buah )
a. Meja Beton K 175
b. Finish Keramik ex Roman Gol B, uk 300 x 300 mm
Dinding Finish Keramik ex Roman Gol. B, uk 300 x 300 mm
c.
JUMLAH BIAYA PEKERJAAN LAIN-LAIN

TOTAL PEKERJAAN ARSITEKTUR

VOLUME

SAT

HARGA (Rp)
SATUAN
JUMLAH

991.770

129,571.00

128,504,630.67

1,983.540
1,983.540

39,152.00
23,436.00

68.000

m
m
m'
m'
m'

9,700.00

77,659,558.08
46,486,243.44
659,600.00

3.000
3.000
3.000

unit
unit
unit

2,332,500.00
2,332,500.00
466,500.00

6,997,500.00
6,997,500.00
1,399,500.00

523.125

132,244.74

69,180,531.11
337,885,063.30

963.910

129,571.00

124,894,782.61

1,927.820
1,927.820

64.000

m
m
m'
m'
m'

39,152.00
23,436.00
9,700.00

75,478,008.64
45,180,389.52
620,800.00

3.000
3.000
3.000

unit
unit
unit

2,332,500.00
2,332,500.00
466,500.00

6,997,500.00
6,997,500.00
1,399,500.00

415.260

132,244.74

54,915,951.92
316,484,432.69

595.994

129,571.00

77,223,538.57

1,191.988
1,191.988

m
m

39,152.00
23,436.00

46,668,714.18
27,935,430.77

VOLUME

48.000

SAT
m'
m'
m'

HARGA (Rp)
SATUAN
JUMLAH
9,700.00

465,600.00
152,293,283.52
806,662,779.50

17.000
7.200
1.935
3.870
3.000
1.000
0.820

BH
m'
m
m
bh
bh
m

3,112,931.25
133,686.91
643,700.00
116,600.00
41,900.00
228,500.00
121,200.00

52,919,831.28
962,545.75
1,245,559.50
451,242.00
125,700.00
228,500.00
99,384.00

2.000
7.000
1.720
3.440
3.000
1.000
0.420

BH
m
m
m
bh
bh
m

2,769,028.37
133,686.91
597,100.00
116,600.00
41,900.00
228,500.00
121,200.00

5,538,056.74
935,808.37
1,027,012.00
401,104.00
125,700.00
228,500.00
50,904.00

5.000
8.000
2.580
5.160
6.000
1.000
1.000
1.000

BH
m
m
m
bh
bh
m
set

4,002,897.28
133,686.91
643,700.00
116,600.00
41,900.00
228,500.00
121,200.00
69,900.00

20,014,486.40
1,069,495.28
1,660,746.00
601,656.00
251,400.00
228,500.00
121,200.00
69,900.00

3.000

BH

14,461,500.00

43,384,500.00

1.000

BH

7,230,700.00

7,230,700.00

VOLUME
1.000

SAT
bh

HARGA (Rp)
SATUAN
JUMLAH
2,332,500.00

2,332,500.00
131,420,074.42

11.000
7.200
1.935
3.870
3.000
1.000
0.820

BH
m'
m
m
bh
bh
m

3,112,931.25
133,686.91
643,700.00
116,600.00
41,900.00
228,500.00
121,200.00

34,242,243.77
962,545.75
1,245,559.50
451,242.00
125,700.00
228,500.00
99,384.00

4.000
7.000
1.720
3.440
3.000
1.000
0.420

BH
m
m
m
bh
bh
m

2,769,028.37
133,686.91
597,100.00
116,600.00
41,900.00
228,500.00
121,200.00

11,076,113.48
935,808.37
1,027,012.00
401,104.00
125,700.00
228,500.00
50,904.00

3.000
8.000
2.580
5.160
6.000
1.000
1.000
1.000

BH
m
m
m
bh
bh
m
set

4,002,897.28
133,686.91
643,700.00
116,600.00
41,900.00
228,500.00
121,200.00
69,900.00

12,008,691.84
1,069,495.28
1,660,746.00
601,656.00
251,400.00
228,500.00
121,200.00
69,900.00

4.000

BH

14,461,500.00

57,846,000.00

1.000

bh

2,332,500.00

2,332,500.00
117,505,549.09

2.00

unit

2,332,500.00

4,665,000.00
4,665,000.00

VOLUME

SAT

HARGA (Rp)
SATUAN
JUMLAH
253,590,623.52

VOLUME

SAT

HARGA (Rp)
SATUAN
JUMLAH

1,524.200
58.340

m
m

319,559.80
319,559.80

487,073,047.16
18,643,118.73

312.000
27.555

m'
m'

59,251.50
59,251.50

18,486,468.00
1,632,675.08

13.280
15.840
6.800

m
m
m

228,175.00
228,175.00
228,175.00

3,030,164.00
3,614,292.00
1,551,590.00

49.140
51.480
29.736

m
m
m

228,175.00
228,175.00
228,175.00

11,212,519.50
11,746,449.00
6,785,011.80

18.800
19.800
10.420

m'
m'
m'

77,839.74
77,839.74
77,839.74

1,463,387.11
1,541,226.85
811,090.09

18.800
19.800
10.420

m'
m'
m'

135,953.38
135,953.38
135,953.38

2,555,923.54
2,691,876.92
1,416,634.22

SUB JUMLAH III A.

574,255,474.02

1,350.600
58.340

m
m

319,559.80
319,559.80

431,597,465.88
18,643,118.73

304.500
27.555

m'
m'

59,251.50
59,251.50

18,042,081.75
1,632,675.08

13.280
15.840

m
m

228,175.00
228,175.00

3,030,164.00
3,614,292.00

49.140
51.480

m
m

228,175.00
228,175.00

11,212,519.50
11,746,449.00

18.800
19.800

m'
m'

77,839.74
77,839.74

1,463,387.11
1,541,226.85

VOLUME
18.800
19.800

SAT
m'
m'

HARGA (Rp)
SATUAN
JUMLAH
135,953.38
135,953.38

SUB JUMLAH III B.

2,555,923.54
2,691,876.92
507,771,180.38

16.480

319,559.80

5,266,345.50

23.000

m'

59,251.50

1,362,784.50

SUB JUMLAH III C.

6,629,130.00
1,088,655,784.40

VOLUME

SAT

HARGA (Rp)
SATUAN
JUMLAH

164.00
40.80
11.300
10.000
7.400
58.100
13.000
9.600

m
m
m
m
m
m
m
m

116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90

19,093,683.60
4,750,135.92
1,315,601.37
1,164,249.00
861,544.26
6,764,286.69
1,513,523.70
1,117,679.04

370.730
50.880
15.800
35.640
51.810
17.270
35.000
331.450
23.000
64.520

m
m
m
m
m
m
m
m
m
m

116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90

43,162,203.18
5,923,698.91
1,839,513.42
4,149,383.44
6,031,974.07
2,010,658.02
4,074,871.50
38,589,033.11
2,677,772.70
7,511,734.55

19.000
30.600
45.200

m
m
m

135,200.00
135,200.00
645,994.00

2,568,800.00
4,137,120.00
29,198,928.80

13.280
15.840
56.200
6.400
5.500
7.000

m
m
m
m
m
m

106,126.90
106,126.90
106,126.90
106,126.90
106,126.90
106,126.90

1,409,365.23
1,681,050.10
5,964,331.78
679,212.16
583,697.95
742,888.30

108.30
26.10
16.00
14.00
11.70
32.00

m'
m'
m'
m'
m'
m'

26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00

2,915,111.10
702,533.70
430,672.00
376,838.00
314,928.90
861,344.00

VOLUME
14.70
13.00
87.10
52.71
17.20
24.00
53.55
17.85
24.20
117.60
22.12
35.00
18.900
19.800
11.530
10.000
11.150

SAT
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'

HARGA (Rp)
SATUAN
JUMLAH
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00

395,679.90
349,921.00
2,344,470.70
1,418,795.07
462,972.40
646,008.00
1,441,405.35
480,468.45
651,391.40
3,165,439.20
595,404.04
942,095.00
508,731.30
532,956.60
310,353.01
269,170.00
300,124.55
219,933,754.46

VOLUME

SAT

HARGA (Rp)
SATUAN
JUMLAH

34.70
52.30
106.700
123.800

m
m
m
m

116,424.90
116,424.90
116,424.90
116,424.90

4,039,944.03
6,089,022.27
12,422,536.83
14,413,402.62

575.300
51.000
34.020
17.500
291.400
17.000
51.900
35.000
17.300

m
m
m
m
m
m
m
m
m

116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90

66,979,244.97
5,937,669.90
3,960,775.10
2,037,435.75
33,926,215.86
1,979,223.30
6,042,452.31
4,074,871.50
2,014,150.77

4.000

135,200.00

540,800.00

13.280
15.840
56.200

m
m
m

106,126.90
106,126.90
106,126.90

1,409,365.23
1,681,050.10
5,964,331.78

23.60
30.00
76.80
70.60
134.00
52.50
23.40
17.70
72.70
17.40
53.10
23.70
17.70
18.900

m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'

26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00

635,241.20
807,510.00
2,067,225.60
1,900,340.20
3,606,878.00
1,413,142.50
629,857.80
476,430.90
1,956,865.90
468,355.80
1,429,292.70
637,932.90
476,430.90
508,731.30

VOLUME
19.800

SAT
m'

HARGA (Rp)
SATUAN
JUMLAH
26,917.00

532,956.60
191,059,684.62

37.000

116,424.90

4,307,721.30

18.000

m'

26,917.00

484,506.00
4,792,227.30
415,785,666.37

810.560
1,464.120
1,046.250

m
m
m

25,002.37
25,002.37
25,002.37

20,265,921.03
36,606,469.96
26,158,729.61
83,031,120.60

VOLUME

886.720
1,493.240
830.520

SAT

m
m
m

HARGA (Rp)
SATUAN
JUMLAH

25,002.37
25,002.37
25,002.37

22,170,101.53
37,334,538.98
20,764,968.33
80,269,608.84

595.994

28,678.37

17,092,136.45

136.800
37.000

m
m

25,002.37
25,002.37

3,420,324.22
925,087.69
21,437,548.36
184,738,277.80

2.000
2.000
1.000
2.000
9.000
5.000
3.000
7.000
7.000
2.000
2.000
1.000
1.000
1.000
2.000
1.000

set
set
set
set
Bh
bh
unit
unit
unit
unit
unit
unit
unit
unit
unit
bh

SUB JUMLAH VI A.

2,143,517.90
2,143,517.90
2,143,517.90
2,789,638.00
350,800.00
1,810,031.00
2,053,810.00
350,800.00
401,100.00
923,600.00
326,500.00
691,300.00
513,100.00
233,200.00
1,632,700.00
198,700.00

4,287,035.80
4,287,035.80
2,143,517.90
5,579,276.00
3,157,200.00
9,050,155.00
6,161,430.00
2,455,600.00
2,807,700.00
1,847,200.00
653,000.00
691,300.00
513,100.00
233,200.00
3,265,400.00
198,700.00
47,330,850.50

VOLUME
2.000
2.000
2.000
6.000
4.000
3.000
6.000
6.000
2.000
2.000
1.000
6.000

SAT
set
set
set
Bh
bh
unit
unit
unit
unit
unit
unit
bh

SUB JUMLAH VI B.

HARGA (Rp)
SATUAN
JUMLAH
2,143,517.90
2,143,517.90
2,789,638.00
350,800.00
1,810,031.00
2,053,810.00
350,800.00
401,100.00
923,600.00
326,500.00
1,632,700.00
213,000.00

4,287,035.80
4,287,035.80
5,579,276.00
2,104,800.00
7,240,124.00
6,161,430.00
2,104,800.00
2,406,600.00
1,847,200.00
653,000.00
1,632,700.00
1,278,000.00
39,582,001.60
86,912,852.10

VOLUME

SAT

HARGA (Rp)
SATUAN
JUMLAH

51.260

m'

629,700.00

32,278,422.00

20.000
1,678.600
29.120

m'
m
m

699,700.00
69,900.00
60,600.00

13,994,000.00
117,334,140.00
1,764,672.00

2.800
1.680

m'
m

419,800.00
228,175.00

1,175,440.00
383,334.00

5.700
3.420
5.580

m'
m
m

419,800.00
228,175.00
228,175.00

2,392,860.00
780,358.50
1,273,216.50
171,376,443.00

3,007,722,426.69

NO

URAIAN PEKERJAAN

D. PEKERJAAN FAADE
I.

FAADE DEPAN ( TAMPAK DEPAN )

Pasang cladding wall ex Alucopan atau setara, tb 4 mm PVDF


lengkap dengan rangka sesuai Gambar dan Spesifikasi
Pasang Jendela Mati Aluminium Soft Pront, Kaca Panasap 8 mm, uk 600 x 2700
mm
Pasang Jendela Aluminium Soft Pront, Kaca Panasap 8 mm, uk 5300 x 1700 mm,
lengkap asesories
Pasang lisplank ACP ex Alucopan t = 1.000 mm
Cat dinding luar (Weathershield ex Dulux)
Pas Ornamen Pipa 8"

2
3
4
5
6

JUMLA

II.
1
2
3
4
5
6

FAADE TAMPAK DEPAN LOBBY


Pasang cladding wall ex Alucopan atau setara, tb 4 mm PVDF
lengkap dengan rangka sesuai Gambar dan Spesifikasi
Pasang curtain Wall, Kaca Panasap 8 mm
Pasang Pintu Frame Less 2 daun Asesories Ex Dorma uk 1000 x 2200 mm
Pasang lisplank ACP ex Alucopan t = 1.000 mm
Pasang Canopy Teras ACP ex Alucopan t = 700 mm
Cat dinding luar (Weathershield ex Dulux)

JUMLAH BIAYA PEKER

III.
1
2
3
4
5
6
7

FAADE SAMPING KIRI (TAMPAK SAMPING KIRI)


Pasang cladding wall ex Alucopan atau setara, tb 4 mm PVDF
lengkap dengan rangka sesuai Gambar dan Spesifikasi
Pasang Jendela Aluminium Soft Pront, Kaca Panasap 8 mm, uk 8000 x 1700 mm,
lengkap asesories
Pasang Jendela Aluminium Soft Pront, Kaca Panasap 8 mm, uk 5300 x 1700 mm,
lengkap asesories
Pasang Jendela Mati Aluminium Soft Pront, Kaca Panasap 8 mm, uk 600 x 2700
mm
Pasang lisplank ACP ex Alucopan t = 1.000 mm
Cat dinding luar (Weathershield ex Dulux)
Pas Ornamen Pipa 8"

JUMLAH BIAYA PEKERJ

NO
IV.
1
2
3
7
5
6

URAIAN PEKERJAAN
FAADE SAMPING KANAN (TAMPAK SAMPING KANAN)
Pasang cladding wall ex Alucopan atau setara, tb 4 mm PVDF
lengkap dengan rangka sesuai Gambar dan Spesifikasi
Pasang Jendela Aluminium Soft Pront, Kaca Panasap 8 mm, uk 5300 x 1700 mm,
lengkap asesories
Pasang Jendela Mati Aluminium Soft Pront, Kaca Panasap 8 mm, uk 600 x 2700
mm
Pas Ornamen Pipa 8"
Pasang lisplank ACP ex Alucopan t = 1.000 mm
Cat dinding luar (Weathershield ex Dulux)

JUMLAH BIAYA PEKERJAA

NO
V.
1
2
3

4
5
6

URAIAN PEKERJAAN
FAADE BELAKANG (TAMPAK BELAKANG)
Pasang cladding wall ex Alucopan atau setara, tb 4 mm PVDF
lengkap dengan rangka sesuai Gambar dan Spesifikasi
Pasang Jendela Mati Aluminium Soft Pront, Kaca Panasap 8 mm, uk 600 x 2700
mm
Pasang Jendela Aluminium Soft Pront, Kaca Panasap 8 mm, uk 5300 x 1700 mm,
lengkap asesories
Pasang Jendela Aluminium Soft Pront, Kaca Panasap 8 mm, uk 8000 x 1700 mm,
lengkap asesories
Pasang lisplank ACP ex Alucopan t = 1.000 mm
Cat dinding luar (Weathershield ex Dulux)
Pas Ornamen Pipa 8"

JUMLAH BIAYA PEK

VI.
1
2
3
4
5
6
7

FAADE (TAMPAK TERAS BELAKANG)


Pasang cladding wall ex Alucopan atau setara, tb 4 mm PVDF
lengkap dengan rangka sesuai Gambar dan Spesifikasi
Pasang Pintu Frame Less 2 daun Asesories Ex Dorma uk 1000 x 2200 mm
Pasang Jendela Aluminium Soft Pront, Kaca Panasap 8 mm, uk 7700 x 1700 mm,
lengkap asesories
Pasang Jendela Mati Aluminium Soft Pront, Kaca Panasap 8 mm
Pasang Jendela Aluminium Soft Pront, Kaca Panasap 8 mm, uk 1250 x 1700 mm,
lengkap asesories
Pasang Canopy Teras bungkus ACP ex Alucopan t = 700 mm
Cat dinding luar (Weathershield ex Dulux)

JUMLAH BIAYA PEKERJAAN

D
VOLUME

SAT

HARGA (Rp)
SATUAN
JUMLAH

208.55

645,994.00

134,718,818.73

14.00

unit

1,058,000.00

14,812,000.00

8.00

unit

5,877,900.00

47,023,200.00

93.30
237.74
8.80

m
m
m'

645,994.00
28,678.37
163,200.00

60,271,240.20
6,818,081.72
1,436,160.00

JUMLAH BIAYA PEKERJAAN FAADE DEPAN

265,079,500.65

180.70

645,994.00

116,731,115.80

75.20
2.00
43.70
10.64
81.84

m
unit
m
m
m

592,400.00
7,464,000.00
645,994.00
645,994.00
28,678.37

44,548,480.00
14,928,000.00
28,229,937.80
6,873,376.16
2,347,037.80

JUMLAH BIAYA PEKERJAAN FAADE TAMPAK DEPAN LOBBY

213,657,947.56

142.74

645,994.00

92,205,953.59

2.00

unit

8,967,000.00

17,934,000.00

6.00

unit

5,877,900.00

35,267,400.00

2.00

unit

1,058,000.00

2,116,000.00

43.30
199.17
7.70

m
m
m'

645,994.00
28,678.37
163,200.00

27,971,540.20
5,711,756.24
1,256,640.00

JUMLAH BIAYA PEKERJAAN FAADE TAMPAK SAMPING KIRI

182,463,290.03

D
VOLUME

SAT

HARGA (Rp)
SATUAN
JUMLAH

139.43

645,994.00

90,070,943.42

2.00

unit

5,877,900.00

11,755,800.00

14.00

unit

1,058,000.00

14,812,000.00

4.40
31.60
143.35

m'
m
m

163,200.00
645,994.00
28,678.37

718,080.00
20,413,410.40
4,111,101.70

JUMLAH BIAYA PEKERJAAN FAADE TAMPAK SAMPING KANAN

141,881,335.52

D
VOLUME

SAT

HARGA (Rp)
SATUAN
JUMLAH

245.73

645,994.00

158,740,105.62

2.00

unit

1,058,000.00

2,116,000.00

12.00

unit

5,877,900.00

70,534,800.00

2.00

unit

8,967,000.00

17,934,000.00

61.30
242.36
11.00

m
m
m'

645,994.00
28,678.37
163,200.00

39,599,432.20
6,950,489.75
1,795,200.00

JUMLAH BIAYA PEKERJAAN FAADE TAMPAK BELAKANG

24.79

2.00

297,670,027.57

645,994.00

16,014,191.26

daun

7,464,000.00

14,928,000.00

1.00

unit

8,549,000.00

8,549,000.00

16.06

606,400.00

9,738,784.00

4.00

unit

1,387,800.00

5,551,200.00

16.80
83.92

m
m

645,994.00
28,678.37

10,852,699.20
2,406,660.13

JUMLAH BIAYA PEKERJAAN FAADE TAMPAK TERAS BELAKANG

68,040,534.59

TOTAL PEKERJAAN FAADE

1,168,792,635.92

NO.

ITEM PEKERJAAN

PEKERJAAN TATA UDARA


Gedung Laboratoria TIAB, Lantai 1, 2
Pengadaan dan Pemasangan unit AC

instalasinya sampai berfungsi dengan baik


Gedung Laboratoria TIAB Lantai 1
Pengadaan dan Pemasangan unit AC jenis indoor
dan outdoor termasuk kabel kontrol, pipa refrigerant
drain dan kelengkapan lain sehingga dapat berfungsi de
1

Lantai Satu
AC SPLIT WALL MOUNTED

AC Split
- Kap. 7.000 Btu/h ( 3/4 Pk )
Type : Wall Mounted Series
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 3/4" dan 3/8"
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power + kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning

AC Split

286480882.xlsx - (6) AC

48

NO.

ITEM PEKERJAAN
-Kap. 9.000 Btu/h ( 1 Pk )
-Type : Wall Mounted Series
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 3/4" dan 3/8"
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power + kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning

AC Split
- Kap. 12.200 Btu/h ( 1,5 Pk )
Type : Wall Mounted Series
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 1/4" dan 1/2"
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power + kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning

AC Split
-Kap. 18.000 Btu/h ( 2 Pk )
-Type : Wall Mounted Series
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 1/4" dan 1/2"

286480882.xlsx - (6) AC

49

NO.

ITEM PEKERJAAN
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power + kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning

AC SPLIT CEILING CASET


1 AC Split
- Kap. 27.000 Btu/h ( 3 Pk )
Type : Ceiling Cassette
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 3/8" dan 5/8"
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power NYY 4 x 4 mm + pvc 20mm
- Kabel kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning
2 AC Split
- Kap. 35.000 Btu/h ( 3,5 Pk )
Type : Ceiling Cassette
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 3/8" dan 3/4"
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power NYY 4 x 4 mm + pvc 20mm
- Kabel kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning
3 AC Split
- Kap. 39.500 Btu/h ( 4 Pk )
Type : Ceiling Cassette

286480882.xlsx - (6) AC

50

NO.

ITEM PEKERJAAN
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 3/8" dan 3/4"
-

Pipa Air buangan (PVC) "AW" 25


Kabel Power NYY 4 x 4 mm + pvc 20mm
Kabel kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
Alat Batu dan Tes Comusioning

286480882.xlsx - (6) AC

51

NO.

ITEM PEKERJAAN

Lantai Dua
AC SPLIT WALL MOUNTED

AC Split
- Kap. 7.000 Btu/h ( 3/4 Pk )
Type : Wall Mounted Series
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 3/4" dan 3/8"
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power + kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning

AC Split
-Kap. 9.000 Btu/h ( 1 Pk )
-Type : Wall Mounted Series
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 3/4" dan 3/8"
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power + kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning

AC Split
- Kap. 12.200 Btu/h ( 1,5 Pk )
Type : Wall Mounted Series
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 1/4" dan 1/2"
- Pipa Air buangan (PVC) "AW" 25

286480882.xlsx - (6) AC

52

NO.

ITEM PEKERJAAN
- Kabel Power + kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning

AC Split
-Kap. 18.000 Btu/h ( 2 Pk )
-Type : Wall Mounted Series
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 1/4" dan 1/2"
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power + kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning

286480882.xlsx - (6) AC

53

NO.

ITEM PEKERJAAN
AC SPLIT CEILING CASET
1 AC Split
- Kap. 27.000 Btu/h ( 3 Pk )
Type : Ceiling Cassette
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 3/8" dan 5/8"
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power NYY 4 x 4 mm + pvc 20mm
- Kabel kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning
2 AC Split
- Kap. 35.000 Btu/h ( 3,5 Pk )
Type : Ceiling Cassette
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 3/8" dan 3/4"
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power NYY 4 x 4 mm + pvc 20mm
- Kabel kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning
3 AC Split
- Kap. 39.500 Btu/h ( 4 Pk )
Type : Ceiling Cassette
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 3/8" dan 3/4"
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power NYY 4 x 4 mm + pvc 20mm
- Kabel kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm

286480882.xlsx - (6) AC

54

NO.

ITEM PEKERJAAN
- Alat Batu dan Tes Comusioning

286480882.xlsx - (6) AC

55

ITEM PEKERJAAN

VOL

SAT

3.00

unit

45.00
3.00
75.00
3.00

m'
btg
m'
unit

AAN TATA UDARA

oratoria TIAB, Lantai 1, 2


dan Pemasangan unit AC

a sampai berfungsi dengan baik


ratoria TIAB Lantai 1
an Pemasangan unit AC jenis indoor
termasuk kabel kontrol, pipa refrigerant
engkapan lain sehingga dapat berfungsi dengan baik

LL MOUNTED

Mounted Series

asi pipa Refrigern lengkap dengan

gan (PVC) "AW" 25


+ kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
Tes Comusioning

286480882.xlsx - (6) AC

56

ITEM PEKERJAAN

VOL

SAT

8.00

unit

120.00
16.00
200.00
8.00

m'
btg
m'
unit

2.00

unit

30.00

m'

4.00
50.00
2.00

btg
m'
unit

1.00

unit

15.00

m'

asi pipa Refrigern lengkap dengan

gan (PVC) "AW" 25


+ kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
Tes Comusioning

tu/h ( 1,5 Pk )

asi pipa Refrigern lengkap dengan

gan (PVC) "AW" 25


+ kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
Tes Comusioning

asi pipa Refrigern lengkap dengan

286480882.xlsx - (6) AC

57

ITEM PEKERJAAN

gan (PVC) "AW" 25


+ kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
Tes Comusioning

VOL

SAT

2.00
25.00
1.00

btg
m'
unit

1.00

unit

15.00
2.00
15.00
15.00
1.00

m'
btg
m'
m'
unit

2.00

unit

30.00

m'

EILING CASET

asi pipa Refrigern lengkap dengan

gan (PVC) "AW" 25


NYY 4 x 4 mm + pvc 20mm

Kontrol NYM 3 x 2,5 mm + pvc 20mm


Tes Comusioning

tu/h ( 3,5 Pk )

asi pipa Refrigern lengkap dengan

gan (PVC) "AW" 25


NYY 4 x 4 mm + pvc 20mm

Kontrol NYM 3 x 2,5 mm + pvc 20mm


Tes Comusioning

286480882.xlsx - (6) AC

4.00

btg

30.00

m'

30.00

m'

2.00

unit

9.00

unit

58

ITEM PEKERJAAN

VOL

SAT

135.00
18.00
135.00
135.00
9.00

m'
btg
m'
m'
unit

asi pipa Refrigern lengkap dengan

gan (PVC) "AW" 25


NYY 4 x 4 mm + pvc 20mm
Kontrol NYM 3 x 2,5 mm + pvc 20mm
Tes Comusioning

286480882.xlsx - (6) AC

59

ITEM PEKERJAAN

VOL

SAT

0.00

unit

0.00
0.00
0.00
0.00

m'
btg
m'
unit

9.00

unit

135.00
18.00
225.00
9.00

m'
btg
m'
unit

0.00

unit

0.00

m'

0.00

btg

LL MOUNTED

Mounted Series

asi pipa Refrigern lengkap dengan

gan (PVC) "AW" 25


+ kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
Tes Comusioning

asi pipa Refrigern lengkap dengan

gan (PVC) "AW" 25


+ kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
Tes Comusioning

tu/h ( 1,5 Pk )

asi pipa Refrigern lengkap dengan

gan (PVC) "AW" 25

286480882.xlsx - (6) AC

60

ITEM PEKERJAAN

+ kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm


Tes Comusioning

VOL

SAT

0.00
0.00

m'
unit

4.00

unit

60.00
8.00
100.00
4.00

m'
btg
m'
unit

asi pipa Refrigern lengkap dengan

gan (PVC) "AW" 25


+ kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
Tes Comusioning

286480882.xlsx - (6) AC

61

ITEM PEKERJAAN

VOL

SAT

6.00

unit

90.00
12.00
90.00
90.00
6.00

m'
btg
m'
m'
unit

0.00

unit

0.00

m'

0.00

btg

0.00

m'

0.00

unit

8.00

unit

120.00
16.00

m'
btg

120.00

m'

120.00

m'

EILING CASET

asi pipa Refrigern lengkap dengan

gan (PVC) "AW" 25


NYY 4 x 4 mm + pvc 20mm

Kontrol NYM 3 x 2,5 mm + pvc 20mm


Tes Comusioning

tu/h ( 3,5 Pk )

asi pipa Refrigern lengkap dengan

gan (PVC) "AW" 25


NYY 4 x 4 mm + pvc 20mm

Kontrol NYM 3 x 2,5 mm + pvc 20mm


Tes Comusioning

asi pipa Refrigern lengkap dengan

gan (PVC) "AW" 25


NYY 4 x 4 mm + pvc 20mm

Kontrol NYM 3 x 2,5 mm + pvc 20mm

286480882.xlsx - (6) AC

62

ITEM PEKERJAAN
Tes Comusioning

286480882.xlsx - (6) AC

VOL

SAT

8.00

unit

63

RAB ADD
HARGA
SATUAN

JUMLAH HARGA

4,105,200.00

12,315,600.00

69,900.00
8,600.00
16,400.00
139,900.00

3,145,500.00
25,800.00
1,230,000.00
419,700.00

286480882.xlsx - (6) AC

64

RAB ADD
HARGA
SATUAN

JUMLAH HARGA

4,385,100.00

35,080,800.00

69,900.00
8,600.00
16,400.00
139,900.00

8,388,000.00
137,600.00
3,280,000.00
1,119,200.00

5,131,500.00

10,263,000.00

83,900.00

2,517,000.00

8,600.00
16,400.00
139,900.00

34,400.00
820,000.00
279,800.00

7,184,100.00

7,184,100.00

83,900.00

1,258,500.00

286480882.xlsx - (6) AC

65

RAB ADD
HARGA
SATUAN

JUMLAH HARGA

8,600.00
16,400.00
139,900.00

17,200.00
410,000.00
139,900.00

22,112,100.00

22,112,100.00

116,600.00
8,600.00
39,200.00
16,400.00
46,600.00

1,749,000.00
17,200.00
588,000.00
246,000.00
46,600.00

23,325,000.00

46,650,000.00

135,200.00

4,056,000.00

8,600.00

34,400.00

39,200.00

1,176,000.00

16,400.00

492,000.00

46,600.00

93,200.00

27,400,000.00

246,600,000.00

286480882.xlsx - (6) AC

66

RAB ADD
HARGA
SATUAN

135,200.00
8,600.00
39,200.00
16,400.00
46,600.00
Sub Total

JUMLAH HARGA

18,252,000.00
154,800.00
5,292,000.00
2,214,000.00
419,400.00
438,258,800.00

286480882.xlsx - (6) AC

67

RAB ADD
HARGA
SATUAN

JUMLAH HARGA

4,105,200.00

75,000.00
9,300.00
17,600.00
150,000.00

4,385,100.00

39,465,900.00

69,900.00
9,300.00
17,600.00
150,000.00

9,436,500.00
167,400.00
3,960,000.00
1,350,000.00

5,131,500.00

90,000.00

9,300.00

286480882.xlsx - (6) AC

68

RAB ADD
HARGA
SATUAN

JUMLAH HARGA

17,600.00
150,000.00

7,184,100.00

28,736,400.00

90,000.00
9,300.00
17,600.00
150,000.00

5,400,000.00
74,400.00
1,760,000.00
600,000.00

286480882.xlsx - (6) AC

69

RAB ADD
HARGA
SATUAN

JUMLAH HARGA

22,112,100.00

132,672,600.00

116,600.00
9,300.00
39,200.00
17,600.00
46,600.00

10,494,000.00
111,600.00
3,528,000.00
1,584,000.00
279,600.00

23,325,000.00

135,200.00

9,300.00

39,200.00

17,600.00

46,600.00

25,564,200.00

204,513,600.00

135,200.00
9,300.00

16,224,000.00
148,800.00

39,200.00

4,704,000.00

17,600.00

2,112,000.00

286480882.xlsx - (6) AC

70

RAB ADD
HARGA
SATUAN
46,600.00
Sub Total
TOTAL

JUMLAH HARGA
372,800.00
467,695,600.00
905,954,400.00

286480882.xlsx - (6) AC

71

NO.

ITEM PEKERJAAN
PEKERJAAN HYDRANT
Pengadaan dan pemasangan Alat Pemadam Kebakaran
Panel kontrol, Wiring, Pondasi

Diesel Hydrant Pump


Model : Centrifugal End Suction
Type : 50 - 26
Capacity : 500 USGPM
T. Head : 70 M
Power : 37 Kw/ 380 V / 3 Ph/ 50 Hz/ 2900 Rpm
C/W : Control Panel Mengacu NFPA-20 STANDART
Accesories : sudah lengkap dengan Radiator, Air Cleaner, Accu,
Silincer, Panel DC (ampere meter, oil meter, temperature),
Tanki Solar, base frame, dll.

Electric Hydrant Pump


Model : Centrifugal End Suction
Type : 50 - 26
Capacity : 500 USGPM
T. Head : 70 M
Power : 37 Kw/ 380 V / 3 Ph/ 50 Hz/ 2900 Rpm
Shaft Sealing : Gland Packing
Motor : Cmg / Western
Sucht/Discht : 65 MM / 50 MM
C/W : Control Panel Mengacu NFPA-20 STANDART
Ket : Pompa sudah terkopel dengan Electric
Motor diatas base Plate dan Control Panel.

Jockey Fire Pump


Model : VERTICAL MULTI STAGE IN LINE
Type : EVS4 - 10
286480882.xlsx - (7) HD

72

NO.

ITEM PEKERJAAN
Capacity : 15 USGPM
T. Head : 70 Meter
Power : 2,2 Kw/ 380 V / 3 Ph/ 50 Hz/ 2900 Rpm
Driven : Standart Manufacture
Sucht/Discht : 32 MM / 32 MM
C/W : Control Panel Mengacu NFPA-20 STANDART

4
1

Kabel FRC 4 x 1 x 25 mm + PVC 50mm

Kabel FRC 4 x 1 x 4 mm + PVC 50mm

3 - Tenki Solar
4 Accessories
Gate Valve
100
50

Check Valve
100
50
Flexible Join
100
50
Strainer = Fiter air dari tengki ke pompa
100
50
Foot Valve = Filter Air dari tenki ke pompa
100
50
Pressure Switch
286480882.xlsx - (7) HD

73

NO.

ITEM PEKERJAAN
Pressure Gauge

Pemipaan
- Pipa Black steel Sch 40 dia 100 mm
200 ( Pipa Header)
100
2. INSTALASI PIPA RISER
1 - Pipa Black steel Sch 40 dia 150 mm
2 - Fiting - fiting Matrial Bantu
Assesories
3 - Gate Valve dia 100 mm
4 - Automatic air vent dia 25 mm

3. INSTALASI PIPA HYDRANT


3 Site Plan Jaringan Luar
Pengadaan dan pemasangan pipa Sch.40 lengkap
peralatan fitting, isolasi dll.
100
Pillar hydrant
Type : 14 AP
Out Door Hydrant Box
Lengkap :
Fire hose rack
Fire hose dan Nozzle diameter 2"

286480882.xlsx - (7) HD

74

NO.

ITEM PEKERJAAN
Seamese Connection
100
Check Valve
100
Lengkap bak kontrol
Galian Tanah dan Urugan
4 Lantai Satu
Pekerjaan hydrant box
Pengadaan dan pemasangan pipa Black steel Sch 40 lengkap
peralatan fitting, penggantung dll.
100
65
Indoor hydrant box
Lengkap :
Fire hose 40 x 30 m
Hydrant Valve 40 , 65
Hnozzle 40 dan Hose rack
Accessories
Gate Valve
65
5 Lantai Dua
Pekerjaan hydrant box
Pengadaan dan pemasangan pipa Black steel Sch 40 lengkap
peralatan fitting, penggantung dll.
100
65
Indoor hydrant box
Lengkap :
Fire hose 40 x 30 m
286480882.xlsx - (7) HD

75

NO.

ITEM PEKERJAAN
Hydrant Valve 40 , 65
Gate Valve
65

286480882.xlsx - (7) HD

76

RAB ADD

VOL

SAT

Unit

223,360,200.00

223,360,200.00

Unit

110,840,400.00

110,840,400.00

Unit

29,856,000.00

29,856,000.00

HARGA SATUAN

286480882.xlsx - (7) HD

JUMLAH HARGA

77

RAB ADD

VOL

SAT

12.00

m'

340,800.00

4,089,600.00

12.00

m'

111,600.00

1,339,200.00

1.00

unit

5,131,500.00

5,131,500.00

4.00

bh

2,854,900.00

11,419,600.00

2.00

bh

1,833,300.00

3,666,600.00

2.00

bh

3,097,500.00

6,195,000.00

1.00

bh

1,614,000.00

1,614,000.00

4.00

bh

914,300.00

3,657,200.00

2.00

bh

429,100.00

858,200.00

2.00

bh

2,318,500.00

4,637,000.00

1.00

bh

1,103,700.00

1,103,700.00

2.00

bh

3,540,700.00

7,081,400.00

1.00

bh

1,334,100.00

1,334,100.00

1.00

bh

278,900.00

278,900.00

HARGA SATUAN

286480882.xlsx - (7) HD

JUMLAH HARGA

78

RAB ADD

VOL

SAT

6.00

bh

167,000.00

1,002,000.00

1.00

set

3,509,900.00

3,509,900.00

12.00

314,800.00

3,777,600.00

HARGA SATUAN

Sub 1

JUMLAH HARGA

424,752,100.00

1.00

set

3,509,900.00

3,509,900.00

12.00

314,800.00

3,777,600.00

3.00

bh

2,854,900.00

8,564,700.00

3.00

bh

797,700.00

2,393,100.00

Sub 2

18,245,300.00

265.00

450,600.00

119,409,000.00

4.00

bh

2,136,500.00

8,546,000.00

4.00

unit

2,047,900.00

8,191,600.00

286480882.xlsx - (7) HD

79

RAB ADD

VOL

SAT

1.00

unit

2,010,600.00

2,010,600.00

1.00

unit

3,097,500.00

3,097,500.00

265.00

11,100.00

2,941,500.00

49.00

450,600

22,079,400.00

6.00

265,000

1,590,000.00

2.00

unit

2,061,900.00

4,123,800.00

2.00

bh

2,145,900.00

4,291,800.00

55.00

6.00

2.00

unit

HARGA SATUAN

450,600
247,200.00
2,061,900

286480882.xlsx - (7) HD

JUMLAH HARGA

24,783,000.00
1,483,200.00
4,123,800.00

80

VOL

SAT

2.00

bh

RAB ADD
HARGA SATUAN

2,145,900
Sub 3
TOTAL PEK HYDRAN

286480882.xlsx - (7) HD

JUMLAH HARGA

4,291,800.00
210,963,000.00
653,960,400.00

81

NO.

ITEM PEKERJAAN

VOL

PEKERJAAN PLUMBING
1 PERALATAN UTAMA
2 Sumur Dangkal
Kap. : 40 L/m
Head : 30 m ( disesuaikan lapangan)
Type : Jet Pump
Daya : 5,5 kW ( disesuaikan lapangan)

1.00

3 Package Pompa Booster


Centrifugal and Section
Type
: 2 x E 32-20
Paralel /Alternate Operation System
Capasity : 2 x 100 L/m
T.Head : 25 m
Motor 2 x(1,1 kw) x 380V x3 x 50Hz x 1500Rpm
Pressure Tank 100 L
Control Panel
Presure Switch
Pressure Gauge
Gate Valve
Booster Skid Base
Soft Water Hammer Check Valve
Hider Pipa
Kabel NYY 4 x 4mm + PVC 25mm

1.00

4 Pompa Penguras
Type : Centrifugal and Section
Kap : 100 L/m
Head : 15 m
Daya : 0.4 kw
Kabel NYY 4 x 4mm + PVC 25mm

1.00

CONTROL PANEL AUTOMATIC PARALLEL ALTERNATE


Aplikasi : SUMP PUMP
286480882.xlsx - (8) PL

1.00

82

NO.

ITEM PEKERJAAN

VOL

Operation : Parallel Alternate


Power : 1,1 Kw/ 380 V/ 3 Phs/ 50 Hz/ 2900 Rpm
INSTALASI UTAMA
5 Instalasi Pipa Riser
Pipa air bersih PPR
50
Fitting & Material Bantu

286480882.xlsx - (8) PL

81.60
1.00

83

NO.

ITEM PEKERJAAN
2. INSTALASI PIPA AIR BERSIH
Instalasi Lantai Satu
Pipa air bersih PPR
50
40
20
Gate Valve dia 50 mm
Fiting - fiting Matrial Bantu
Instalasi Lantai Dua
Pipa air bersih PPR
50
40
20
Gate Valve dia 50 mm
Fiting - fiting Matrial Bantu

VOL

90.09
68.00
124.00
1.00
1.00

83.00
22.50
87.00
1.00
1.00

TOTAL PEK.PIPA AIR BERSIH

3. INSTALASI AIR KOTOR & AIR BEKAS


PEKERJAAN IPAL

1 SEPTICTANK TYPE SI 35 CAP 5 M3


Septictank Biotechnologi dengan contact airation system
2 Lantai - Satu
Pipa Air Kotor & Bekas( PVC ) "AW"
100

1.00

128.00

80

48.00

50

24.00

Fitting & Material Bantu

1.00

- Accessories
Clean Out 100

6.00

286480882.xlsx - (8) PL

84

NO.

ITEM PEKERJAAN

VOL

Floor drain 100

8.00

Pipa vent ( PVC ) "D"


50
Fitting & Material Bantu

36.00
1.00

4 Lantai - Dua
Pipa Air Kotor & Bekas( PVC ) "AW"
100
80
50
Fitting & Material Bantu

286480882.xlsx - (8) PL

42.00
24.00
36.00
1.00

85

NO.

ITEM PEKERJAAN
- Accessories
Clean Out 100
Floor drain 50
Pipa vent ( PVC ) "D"
50
Fitting & Material Bantu
5 Lantai - Atap
Pipa air hujan ( PVC ) "AW"
100
Fitting dan Material Bantu
Roof Drain
100

VOL

6.00
8.00

24.00
1.00

184.00
1.00

23.00

TOTAL PEK.PIPA AIR KOTOR &BEKAS


TOTAL BIAYA

286480882.xlsx - (8) PL

86

SAT

RAB ADD
HARGA SATUAN

JUMLAH HARGA

unit

22,205,400.00

22,205,400.00

set

63,444,000.00

63,444,000.00

unit

13,995,000.00

13,995,000.00

set

10,263,000.00

10,263,000.00

286480882.xlsx - (8) PL

87

SAT

RAB ADD
HARGA SATUAN

m'
lot

132,000.00
1,399,500.00
Sub 1

286480882.xlsx - (8) PL

JUMLAH HARGA

10,771,200.00
1,399,500.00
122,078,100.00

88

SAT

RAB ADD
HARGA SATUAN

JUMLAH HARGA

m'
m'
m'
bh
ls

132,000.00
87,200.00
26,500.00
376,900.00
1,632,700.00

11,891,880.00
5,929,600.00
3,286,000.00
376,900.00
1,632,700.00

m'
m'
m'
bh
ls

132,000.00
87,200.00
26,500.00
376,900.00
1,632,700.00

10,956,000.00
1,962,000.00
2,305,500.00
376,900.00
1,632,700.00
40,350,180.00

Sub 2

162,428,280.00

bh

41,891,700.00

41,891,700.00

m'

ls

96,300.00
58,200.00
29,800.00
419,800.00

12,326,400.00
2,793,600.00
715,200.00
419,800.00

bh

115,300.00

691,800.00

m'
m'

286480882.xlsx - (8) PL

89

SAT

RAB ADD
HARGA SATUAN

JUMLAH HARGA

bh

179,100.00

1,432,800.00

m'
ls

18,600.00
306,000.00

669,600.00
306,000.00

m'
m'
m'
ls

96,300.00
58,200.00
29,800.00
419,800.00

4,044,600.00
1,396,800.00
1,072,800.00
419,800.00

286480882.xlsx - (8) PL

90

SAT

RAB ADD
HARGA SATUAN

JUMLAH HARGA

bh
bh

115,300.00
179,100.00

691,800.00
1,432,800.00

m'
ls

18,600.00
306,000.00

446,400.00
306,000.00

m'
lot

96,300.00
1,539,400.00

17,719,200.00
1,539,400.00

bh

199,200.00

4,581,600.00

94,898,100.00
257,326,380.00

286480882.xlsx - (8) PL

91

NO.

ITEM PEKERJAAN

PEKERJAAN MEKANIKAL-ELEKTRIKAL
1
2

BIAYA PENYAMBUNGAN (BP)


UANG JAMINAN PELANGGAN (UJL)
TOTAL BIAYA PENYAMBUNGAN DAYA

PEKERJAAN INSTALASI LISTRIK


1 PANEL TEGANGAN RENDAH
Pengadaan,pemasangan dan pengujian seluruh panel
tegangan rendah lengkap dengan berbagai jenis CB,
peralatan intrumen,relay-relay panel lengkap dengan
accessories lainnya sesuai gambar rencana dan
spesifikasi teknis
1 ( LVMDP ) PHB UTR
2 PHB PENERANGAN / AC
3 Panel Penerangan Lantai Satu
4 Panel Penerangan Lantai Dua
5 Panel Penerangan Jalan & Luar
6 Panel Distribusi AC Split Wall Lantai Satu
7 Panel Distribusi AC Split Wall Lantai Dua
8 Panel Distribusi Pompa

2 KABEL DISTRIBUSI TEGANGAN RENDAH


Pengadaan,pemasangan dan pengujian seluruh pekerjaaan
kabel distribusi tegangan rendah lengkap dengan pe lindung kabel,junction box,penyambungan,klem,
sepatu kabel dan assesories lainya sesua gambar
1 Kabel
2 Kabel
3 Kabel
4 Kabel
5 Kabel
6 Kabel

dari KWH M PLN ke LVMDP


dari LVMDP ke PHB
dari LVMDP ke P.Jalan
dari LVMDP ke PD. Pompa
dari PHB ke P.Penerangan Lt.1
dari PHB ke P.Penerangan Lt.2
286480882.xlsx - (9) EL

92

NO.

ITEM PEKERJAAN
7 Kabel dari PHB ke P.Distribusi AC Lt.1
8 Kabel dari PHB ke P.Distribusi AC Lt.2
3 INSTALASI PEMBUMIAN TEGANGAN RENDAH
1 BC 6 mm
2 BC 95 mm
3 Batang Pentanahan (Ground Rod)
4 Matrial Bantu/ Tes Comisioning

286480882.xlsx - (9) EL

93

NO.

ITEM PEKERJAAN

4 PEK. INSTALASI PENERANGAN, FIXTURES & STOP KONTAK


Pengadaan, Pemasangan dan pengujian seluruh pekerjaan
penerangan dan stop kontak lengkap dengan berbagai
jenis lampu dan Armatur berbagai jenis stop kontak
conduit, juncetion box klem penyambungan isolasi
dan Accesoris lainnya sesuai gambar rencana dan
spesifikasi teknis.
Lantai Satu
1 - Lampu TBS 299 TL5 - 4 x 14 w M2
2 - Lampu TCH 128 TKI TL5 - 1 x 28
3 - Down Liht SBH 031 PL-C 2 x 18 W
4 - Lam. Cover Acrylic Wastafel
5 - Lam. Cover Acrylic TL 5 Ecsesial - 1 x 14 w Tangga +Battery
6 - Sklar Tunggal 10 A
7 - Sklar Ganda 10 A
8 - Grid Switch 8 Gang
9 - Stop Kontak 16 A
10 - Instalasi Penerangan kabel 3 x 2,5mm + pvc 20 mm
11 - Instalasi Stop Kontak kabel 3 x 2,5 mm + pvc 20 mm
12 - Matrial Bantu

Lantai Dua
1 - Lampu TBS 299 TL5 - 4 x 14 w M2
2 - Lampu TCH 128 TKI TL5 - 1 x 28
3 - Down Liht SBH 031 PL-C 2 x 18 W
4 - Lam. Cover Acrylic Wastafel
5 - Lam. Cover Acrylic TL 5 Ecsesial - 1 x 14 w Tangga +Battery
6 - Sklar Tunggal 10 A
7 - Sklar Ganda 10 A
8 - Grid Switch 8 Gang
9 - Stop Kontak 16 A
10 - Instalasi Penerangan kabel 3 x 2,5mm + pvc 20 mm
11 - Instalasi Stop Kontak kabel 3 x 2,5 mm + pvc 20 mm
12 - Matrial Bantu

286480882.xlsx - (9) EL

94

NO.

ITEM PEKERJAAN
Site Plan
1
Kabel Instalasi lampu termasuk galian & urugan
2
- NYFGbY 4 x 6 mm2
3
- NYM 3 x 2,5 mm2
4
- Galian tanah dan urugan
5
Tiang Lampu Jalan GIP & Pondasi ( 5 ", 4, 3" ) 9 m
6
Lampu Jalan mercury 1 x 150 Watt
7
Lampu Taman lengkap lampu PL 25 W
8
Tiang lampu GIP 3",2" tinggi 2 m termasuk pondasi
9
Peralatan bantu instalasi

PEKERJAAN KABEL TRAY


1 - Cable Tray 100 x 300 mm
2 - Elbow (Radius) for Tray
3 - TEE (Radius) for Tray
4 - Vertical Access Box 250 X 200 X 50mm
5 - Matrial Bantu

TOTAL PEK. LISTRIK

286480882.xlsx - (9) EL

95

NO.

ITEM PEKERJAAN

II

PEKERJAAN PENANGKAL PETIR


Pengadaan, Pemasangan dan pengujian seluruh pekerjaan
Penangkal petir lengkap dengan air terminal system
non radio aktif bak kontrol teknis elektroda
pembumian, kabel pembumian conduit klem
dan Accesoris lainnya sesuai gambar rencana dan
spesifikasi teknis.

1
2
3
4
5
6
7
8

E.F * Lightning Protection


E.F * HV Lightning Carrier (Coaxial Cable)
Connecting Sleeve
Earth Steel Copper Rod 5/8"
Earth Rod Coupling
Earth Clamp
Driving Tip
Driving Stud
TOTAL PEK. PENANGKAL PETIR

III
1
2
3
4
a
b
c
d
e
g
h

PEKERJAAN FIRE ALARM


MCFA lengkap Annunciator,Battery chargers
kap. 8 Zone
Annunciator 8 Zone
TBFA / JBFA ( 5 Pair )
Instalasi Fire Alarm
Lantai 1
Smoke Detector
ROR
Alarm Bell
Indicator Lamp
Manual push button
Instalasi fire alarm
Material bantu

286480882.xlsx - (9) EL

96

NO.

ITEM PEKERJAAN

a
b
c
d
e
f
g

Lantai 2
Smoke Detector
ROR
Alarm Bell
Indicator Lamp
Manual push button
Instalasi fire alarm
Material bantu

5
a
b
6

Kabel reiser & Kabel kontrol


MCFA ke TBFA 1,2 FRC 5 x 2 x 2,5 mm2
Kabel kontrol ke Annunciator,ke pompa.,Tata suara
Testing commissioning
TOTAL PEK. FIRE ALARM

286480882.xlsx - (9) EL

97

NO.

ITEM PEKERJAAN

IV

PEKERJAAN TATA SUARA

1.
1.1
a
b
d
e
f
g
h
i
j

Peralatan Utama
Paging system
Emergency microphone
AM/FM Tuner
CD Player
Free Recorder Evacuation
Mixer Free Amplifier
Equalizer
Zone Selector
MDF TS
Cabinet rack

2
a
c
d
e
f

Instalasi Tata suara


Lantai 1
Ceilling speaker ( 3 Watt )
Volume Control
Instalasi speaker
Terminal box TS/JBSS
Material bantu

a
c
d
e
f

Lantai 2
Ceilling speaker ( 3 Watt )
Volume Control
Instalasi speaker
Terminal box TS/JBSS
Material bantu

3
4

Kabel reiser dari MDFTS ke TBTS1,2 NYMHY 6 x 3 x 2,5 mm2


Testing commissioning
TOTAL PEK. TATA SUARA

PEKERJAAN INSTALASI TELEPHONE

286480882.xlsx - (9) EL

98

NO.
1

ITEM PEKERJAAN
PABX SYSTEM
Type
: TDA 600
Kapasitas : 8Line / 48 Extention Expandable
1 Buah Card KX-TDA 0181 XJ
1 Buah Card KX-TDA 0484 ( 4 Channal VOIP Gabeway Card)
1 Buah Power Suplay KX -TDA 0103X
2 Buah Pesawat Telp KX -DT333
Key Telp display handsfree
Conector
1 T 100
: Terminal Box MDF
2 Instalasi dari Rumah Kabel s/d MDF ;
( Jelly Armoured Cable 20 x 2 x 0,8 mm ) + Sparing PVC 4" + Galian
3 Kabel dari MDF - PABX ke :
- SDF - 3 : ITC 50 X 2 pair x 0,6 mm

286480882.xlsx - (9) EL

99

NO.

ITEM PEKERJAAN

Lantai 1
Terminal Box Telepon
Extention Telepon/Outlet Telepon
Instalasi Telepon
Kabel ITC 10x2x0,6mm2
Material Bantu
Kabel ITC 30x2x0,6mm2

Lantai 2
Terminal Box Telepon
Extention Telepon/Outlet Telepon
Instalasi Telepon
Kabel ITC 10x2x0,6mm2
Material Bantu
Kabel ITC 30x2x0,6mm2
TOTAL PEK. TELEPHONE

VI
1

PEKERJAAN CCTV
Peralatan Utama
Pengadaan pemasangan dan pengujian seluruh
peralatan utama CCTV lengkap dengan Main Box
dan assesories lainya sesuai gambar rencana dan
spesifikasi teknis
1 Digital Video Recording (DVR) 4 ch MPEG4 Network Backup
Harddisk seagate SATA 500 GB
2 LCD CCTV Monitor 15'
UPS 0,5 KVA
Cabinet Rack utk CCTV

Instalasi Lantai 1
3 Lantai Satu
1/3" color Dome Camerawith lens f3.6mm 420 TVL 0.3 lux/F2.0
Instalasi CCTV Kabel RG 6/SA + Connector
Instalasi Power Supplay unit, input 220 VAC output 24 VDC 750mA
Camera mounting bracket for CCD, wall or ceiling type
286480882.xlsx - (9) EL

100

NO.

ITEM PEKERJAAN

3 Lantai Dua
1/3" color Dome Camerawith lens f3.6mm 420 TVL 0.3 lux/F2.0
Instalasi CCTV Kabel RG 6/SA + Connector
Instalasi Power Supplay unit, input 220 VAC output 24 VDC 750mA
Camera mounting bracket for CCD, wall or ceiling type
TOTAL PEK. CCTV
VII

a
b
c
d
d
e
f

PEKERJAAN INSTALASI KABEL DATA


Pengadaan dan pemasangan instalasi
kabel data termasuk bobokan alat bantu sehingga dapat
berfungsi dengan baik.
Lantai 1
Switch 24 port UTP10/100/1000Mbps managable
Rack temperet glass door termasuk Roof mounted
fan wall mounted 8U
Face platekit single port+ modularJack
Instalasi kabel data menggunakan UTP Cat 6
dalam conduit pipa HI
Patch Cord UTP cat 6 7f
AMP Patch Panel 24 port Unshielded cat 6
Material bantu

d
e
f

Lantai 2
Switch 24 port UTP10/100/1000Mbps managable
Rack temperet glass door termasuk Roof mounted
fan wall mounted
Face platekit single port+AMP modularJack
Instalasi kabel data menggunakan UTP cat 6
dalam conduit pipa HI
Patch Cord UTP cat 6 7f
Patch Panel 24 port Unshielded cat 6
Material bantu

Kabel Raiser
UTP Cable cat 6 (dari Switch ke server)

a
b
c
d

286480882.xlsx - (9) EL

101

NO.
b
c

ITEM PEKERJAAN
UTP Cable cat 6 (dari Switch ke swich)
Labeling,Testing
TOTAL PEK. INSTALASI KABEL DATA
TOTAL

286480882.xlsx - (9) EL

102

EM PEKERJAAN

VOL

SAT

164.50

RAB ADD
HARGA SATUAN

513,100.00

an seluruh panel
rbagai jenis CB,
lengkap dengan

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

unit
unit
unit
unit
unit
unit
unit
unit

88,676,900.00
39,394,900.00
9,531,900.00
9,531,900.00
7,794,700.00
18,388,000.00
18,388,000.00
13,848,000.00
Sub .1

an seluruh pekerjaaan
gkap dengan pe -

esua gambar
:
:
:
:
:
:

NYY 4 x 150 mm
NYFGBY 4 x 150 mm
NYY 4 x 10 mm
NYY 4 x 25 mm
NYY 4 x 10 mm
NYY 4 x 10 mm

12.00
78.00
18.00
12.00
8.00
14.00
286480882.xlsx - (9) EL

m'
m'
m'
m'
m'
m'

853,200.00
968,400.00
74,400.00
169,400.00
74,400.00
74,400.00
103

EM PEKERJAAN
: NYY 4 x 25 mm
: NYY 4 x 25 mm

VOL

SAT

RAB ADD
HARGA SATUAN

8.00
14.00

m'
m'

169,400.00
169,400.00
Sub .2

120.00
32.00
12.00
1.00

m'
m'
bh
ls

10,800.00
137,100.00
349,800.00
3,498,700.00
Sub .3

AN RENDAH

286480882.xlsx - (9) EL

104

EM PEKERJAAN

VOL

SAT

RAB ADD
HARGA SATUAN

XTURES & STOP KONTAK


ian seluruh pekerjaan
dengan berbagai
nis stop kontak
bungan isolasi
rencana dan

x 14 w Tangga +Battery

mm + pvc 20 mm
mm + pvc 20 mm

x 14 w Tangga +Battery

mm + pvc 20 mm
mm + pvc 20 mm

117.00
0.00
49.00
2.00
2.00
20.00
8.00
2.00
45.00
170.00
45.00
1.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
titik
titik
ls

308,500.00
332,200.00
639,600.00
25,500.00
27,900.00
895,600.00
43,000.00
279,900.00
303,200.00
2,565,700.00

144.00
28.00
43.00
2.00
2.00
19.00
9.00
3.00
50.00
219.00
50.00
1.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
titik
titik
ls

726,300.00
247,600.00
308,500.00
332,200.00
639,600.00
25,500.00
27,900.00
895,600.00
43,000.00
279,900.00
303,200.00
2,565,700.00

286480882.xlsx - (9) EL

726,300.00

105

EM PEKERJAAN

galian & urugan

i ( 5 ", 4, 3" ) 9 m

m termasuk pondasi

VOL

SAT

360.00
104.00
360.00
5.00
5.00
11.00
11.00
1.00

224.00
2.00
6.00
14.00
1.00

286480882.xlsx - (9) EL

RAB ADD
HARGA SATUAN

m'
m'
m'
btg
bh
bh
btg
ls

47,500.00
16,400.00
12,400.00
1,772,700.00
1,492,800.00
1,166,200.00
699,700.00
5,395,300.00
Sub .4

m'
bh

247,200.00
135,200.00
153,900.00
138,700.00
1,632,700.00
Sub .5

bh
ls

106

EM PEKERJAAN

VOL

SAT

RAB ADD
HARGA SATUAN

ian seluruh pekerjaan


erminal system

rencana dan

1.00
42.00
1.00
12.00
8.00
1.00
1.00
1.00

unit
m'
bh
m'
bh
bh
bh
bh

18,286,800.00
443,100.00
447,800.00
326,500.00
10,700.00
10,700.00
88,600.00
349,800.00

unit

20,152,000.00

1
2

unit
bh

7,815,000.00
607,400.00

17.00
26.00
2.00
2.00
2.00
43.00
1.00

bh
bh
bh
bh
bh
ttk
ls

326,600.00
129,000.00
273,900.00
91,600.00
105,800.00
253,700.00
971,300.00

286480882.xlsx - (9) EL

107

EM PEKERJAAN

pompa.,Tata suara

RAB ADD

VOL

SAT

18.00
25.00
2.00
2.00
2.00
43.00
1.00

bh
bh
bh
bh
bh
ttk
ls

326,600.00
129,000.00
273,900.00
91,600.00
105,800.00
253,700.00
1,055,500.00

88.00
1.00
1.00

m
ls
ls

99,800.00
311,800.00
1,871,100.00

286480882.xlsx - (9) EL

HARGA SATUAN

108

EM PEKERJAAN

1,2 NYMHY 6 x 3 x 2,5 mm2

RAB ADD

VOL

SAT

1
1
1
1
1
1
1
1
1

bh
bh
bh
bh
bh
bh
bh
bh
bh

1,869,800.00
3,234,400.00
3,578,700.00
7,237,900.00
8,387,700.00
5,559,200.00
2,513,100.00
3,879,800.00
4,969,800.00

23.00
3.00
23.00
1.00
1.00

bh
bh
ttk
bh
ls

76,400.00
160,300.00
253,700.00
502,600.00
416,100.00

25.00
2.00
25.00
1.00
1.00

bh
bh
ttk
bh
ls

76,400.00
160,300.00
253,700.00
502,600.00
534,900.00

m
ls

75,000.00
1,871,100.00

80
1

286480882.xlsx - (9) EL

HARGA SATUAN

109

EM PEKERJAAN

VOL

SAT

unit

RAB ADD
HARGA SATUAN
63,817,200.00

l VOIP Gabeway Card)

80.94

m'

38,100.00

12.00

m'

58,900.00

mm ) + Sparing PVC 4" + Galian

286480882.xlsx - (9) EL

110

EM PEKERJAAN

RAB ADD

VOL

SAT

1.00
16.00
16.00
50.00
1.00

bh
ttk
ttk
m
ls

419,800.00
38,100.00
218,200.00
7,700.00
100,000.00

1.00
19.00
19.00
50
1

bh
ttk
ttk
m
ls

419,800.00
38,100.00
218,200.00
7,700.00
151,200.00

1.00

set

24,435,200.00

1.00
1.00
1.00

set
unit
set

6,335,000.00
7,277,400.00
4,198,500.00

bh
titik
bh
bh

1,991,000.00
326,500.00
209,900.00
80,200.00

HARGA SATUAN

rencana dan

PEG4 Network Backup

6mm 420 TVL 0.3 lux/F2.0

20 VAC output 24 VDC 750mA


all or ceiling type

10.00
10.00
2.00
1.00
286480882.xlsx - (9) EL

111

EM PEKERJAAN

6mm 420 TVL 0.3 lux/F2.0

20 VAC output 24 VDC 750mA


all or ceiling type

VOL

SAT

6.00
6.00
2.00
1.00

bh
titik
bh
bh

RAB ADD
HARGA SATUAN

1,991,000.00
326,500.00
209,900.00
80,200.00

at bantu sehingga dapat

Mbps managable
suk Roof mounted

an UTP Cat 6

Mbps managable
suk Roof mounted

an UTP cat 6

1.00
1.00

bh
bh

16,327,500.00
3,727,900.00

12.00
20.00

bh
ttk

68,900.00
733,200.00

12.00
1.00
1.00

bh
bh
ls

417,500.00
1,975,800.00
802,500.00

1.00
1.00

bh
bh

16,327,500.00
3,727,900.00

11.00
20.00

bh
ttk

68,900.00
733,200.00

11.00
1.00
1.00

bh
bh
ls

417,500.00
1,975,800.00
802,500.00

45.00

14,900.00

286480882.xlsx - (9) EL

112

EM PEKERJAAN

VOL

SAT

45.00
1.00

286480882.xlsx - (9) EL

m
Lot

RAB ADD
HARGA SATUAN
14,900.00
1,813,600.00

113

RAB ADD
JUMLAH HARGA

84,404,950.00
84,404,950.00

88,676,900.00
39,394,900.00
9,531,900.00
9,531,900.00
7,794,700.00
18,388,000.00
18,388,000.00
13,848,000.00
205,554,300.00

10,238,400.00
75,535,200.00
1,339,200.00
2,032,800.00
595,200.00
1,041,600.00
286480882.xlsx - (9) EL

114

RAB ADD
JUMLAH HARGA
1,355,200.00
2,371,600.00
94,509,200.00
1,296,000.00
4,387,200.00
4,197,600.00
3,498,700.00
13,379,500.00

286480882.xlsx - (9) EL

115

RAB ADD
JUMLAH HARGA

84,977,100.00
15,116,500.00
664,400.00
1,279,200.00
510,000.00
223,200.00
1,791,200.00
1,935,000.00
47,583,000.00
13,644,000.00
2,565,700.00

104,587,200.00
6,932,800.00
13,265,500.00
664,400.00
1,279,200.00
484,500.00
251,100.00
2,686,800.00
2,150,000.00
61,298,100.00
15,160,000.00
2,565,700.00

286480882.xlsx - (9) EL

116

RAB ADD
JUMLAH HARGA

17,100,000.00
1,705,600.00
4,464,000.00
8,863,500.00
7,464,000.00
12,828,200.00
7,696,700.00
5,395,300.00
447,131,900.00

55,372,800.00
270,400.00
923,400.00
1,941,800.00
1,632,700.00
60,141,100.00
820,716,000.00

286480882.xlsx - (9) EL

117

RAB ADD
JUMLAH HARGA

18,286,800.00
18,610,200.00
447,800.00
3,918,000.00
85,600.00
10,700.00
88,600.00
349,800.00
41,797,500.00

20,152,000.00
7,815,000.00
1,214,800.00

5,552,200.00
3,354,000.00
547,800.00
183,200.00
211,600.00
10,909,100.00
971,300.00

286480882.xlsx - (9) EL

118

RAB ADD
JUMLAH HARGA
5,878,800.00
3,225,000.00
547,800.00
183,200.00
211,600.00
10,909,100.00
1,055,500.00

8,782,400.00
311,800.00
1,871,100.00
83,887,300.00

286480882.xlsx - (9) EL

119

RAB ADD
JUMLAH HARGA

1,869,800.00
3,234,400.00
3,578,700.00
7,237,900.00
8,387,700.00
5,559,200.00
2,513,100.00
3,879,800.00
4,969,800.00

1,757,200.00
480,900.00
5,835,100.00
502,600.00
416,100.00

1,910,000.00
320,600.00
6,342,500.00
502,600.00
534,900.00
6,000,000.00
1,871,100.00
67,704,000.00

286480882.xlsx - (9) EL

120

RAB ADD
JUMLAH HARGA
63,817,200.00

3,083,814.00

706,800.00

286480882.xlsx - (9) EL

121

RAB ADD
JUMLAH HARGA
419,800.00
609,600.00
3,491,200.00
385,000.00
100,000.00

419,800.00
723,900.00
4,145,800.00
385,000.00
151,200.00
78,439,114.00

24,435,200.00
6,335,000.00
7,277,400.00
4,198,500.00

19,910,000.00
3,265,000.00
419,800.00
80,200.00
286480882.xlsx - (9) EL

122

RAB ADD
JUMLAH HARGA

11,946,000.00
1,959,000.00
419,800.00
80,200.00
80,326,100.00

16,327,500.00
3,727,900.00
826,800.00
14,664,000.00
5,010,000.00
1,975,800.00
802,500.00

16,327,500.00
3,727,900.00
757,900.00
14,664,000.00
4,592,500.00
1,975,800.00
802,500.00

670,500.00
286480882.xlsx - (9) EL

123

RAB ADD
JUMLAH HARGA
670,500.00
1,813,600.00
89,337,200.00
1,262,207,214.00

286480882.xlsx - (9) EL

124

NO

JENIS PEKERJAAN

PEKERJAAN ELEKTRIKAL

BIAYA PENYAMBUNGN DAYA

PEKERJAAN LISTRIK
1
PEKERJAAN PANEL
2
PEKERJAAN KABEL DAYA
3
PEMBUMIAN
4
PEKERJAAN INSTALASI PENERANGAN & STK
5
PEKERJAAN KABEL TRAY
I PEKERJAAN LISTRIK

II
III
IV
V
VI
VII

PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN

PENANGKAL PETIR
FIRE ALARM
TATA SUARA
INSTALASI TELEPHONE
CCTV
DATA

TOTAL PEKERJAAN ELEKTRIKAL

B
I

PEKERJAAN MEKANIKAL
PEKERJAAN PLUMBING
1
PEKERJAAN INSTALASI AIR BERSIH
5
PEKERJAAN INSTALASI PIPA AIR KOTOR & BEKAS
I PEKERJAAN PLUMBING

II

PEKERJAAN TATA UDARA

III

PEKERJAAN FIRE HYDRANT

286480882.xlsx - Rekap

125

TOTAL PEKERJAAN MEKANIKAL


TOTAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

286480882.xlsx - Rekap

126

RAB

84,404,950.00

205,554,300.00
94,509,200.00
13,379,500.00
447,131,900.00
60,141,100.00
820,716,000.00
41,797,500.00
83,887,300.00
67,704,000.00
78,439,114.00
80,326,100.00
89,337,200.00
1,346,612,164.00

162,428,280.00
94,898,100.00
257,326,380.00
905,954,400.00
653,960,400.00

286480882.xlsx - Rekap

127

Rp

1,817,241,180.00

Rp

3,163,853,344.00

286480882.xlsx - Rekap

128

NO

URAIAN PEKERJAAN

PEKERJAAN BANGUNAN PENUNJANG

PEKERJAAN GROUND RESERVOIR


Ukuran Bangunan Adalah 8x5x2,7 m
Galian tanah dan buang tanah
Pasir urug 10 cm
Lantai kerja t=5cm
PLAT LANTAI DASAR
- Beton K-350
- Besi beton
- Waterstop
DINDING GWR
- Bekisting dinding sisi luar ,bataco
- Bekisting dinding sisi dalam ,multiplek
- Beton K-350
- Besi beton
KOLOM GWR
- Beton K-350
- Besi beton
- Bekisting kolom
Waterproofing coating sisi dalam
Screed pelindung waterproofing
Keramik 30 x 30
Tangga monyet

1
2
3
4

7
8
9
10
B
1

4
5
6

PEKERJAAAN RUMAH POMPA


PLAT LANTAI BETON
- Beton K-350
- Besi beton
- Bekisting kayu/multipek
PLAT ATAP
- Beton K-350
- Besi beton
- Bekisting kayu/multipek
BALOK ATAP
- Beton K-350
- Besi beton
- Bekisting kayu/multipek
- Pasang Dinding bata ringan
- Plesteran ad dry mortar
- Cat Dinding Weathershield Pro, ex. Dulux ICI atau setara

VOLUME

119.50
2.71
1.35
9.45
791.94
24.00
69.96
96.36
14.40
875.00
2.16
302.88
28.80
84.00
84.00
84.00
1.00

4.22
679.17
24.00
7.20
414.58
76.00
2.19
228.15
24.60
54.20
111.12
55.56

(10) K2-BGNN PENNJG - hal : 129 / 324

NO
7
8
9
10
11

URAIAN PEKERJAAN
-

Cat Dinding Emulsi ex.Dulux ICI atau setara


Waterproofing membrane atap
Screed pelindung waterproofing
Pintu besi fin. Cat duco , lengkap dengan accessories
Louvre besi fin. Cat duco

VOLUME

55.56
53.70
53.70
2.00
2.00
Total pekerjaan Ground Reservo

(10) K2-BGNN PENNJG - hal : 130 / 324

NO
C
1
2
3
4
5
6
7
8
9
10
11
12
13

URAIAN PEKERJAAN
PEKERJAAN KOLAM
galian tanah
pembuangan Tanah
penanaman rumput gajah mini
pek. r. Serbaguna
pek. Toilet
pek. R. pompa
pas. Paving
pemadatan tanah
Sirtu class B/Sub Base (t=25cm)
Crushed stone class A/Base course (t=20cm)
Pasir abu batu t=5 cm
Pasang batu kali
Gudang

VOLUME

4,400.00
4,400.00
180.00
45.00
2.00
1.00
180.00
180.00
45.00
36.00
9.00
370.00
9.00

PEKERJAAN BANG

(10) K2-BGNN PENNJG - hal : 131 / 324

SAT

HARGA

JUMLAH

m3
m3
m3

60,678.00
223,414.00
747,798.00

7,251,297.08
605,228.53
1,012,892.39

m3
kg
m1

1,019,582.00
13,213.89
60,600.00

9,631,991.15
10,464,544.62
1,454,400.00

m2
m2
m3
kg

85,027.00
167,900.00
1,019,582.00
13,213.89

5,948,488.92
16,178,844.00
14,681,980.80
11,562,153.75

m3
kg
m2
m2
m2
m2
unit

1,019,582.00
13,213.89
167,900.00
33,500.00
37,300.00
228,175.00
466,500.00

2,202,297.12
4,002,223.00
4,835,520.00
2,814,000.00
3,133,200.00
19,166,700.00
466,500.00

m3
kg
m2

1,019,582.00
13,213.89
167,900.00

4,306,714.37
8,974,433.63
4,029,600.00

m3
kg
m2

1,019,582.00
13,213.89
167,900.00

7,340,990.40
5,478,258.56
12,760,400.00

m3
kg
M2

1,019,582.00
13,213.89
167,900.00

2,232,884.58
3,014,749.00
4,130,340.00

m2
m2
m2

129,571.00
39,152.00
28,678.37

7,022,748.20
4,350,570.24
1,593,370.24

(10) K2-BGNN PENNJG - hal : 132 / 324

SAT

HARGA

m2
25,002.37
m2
33,500.00
m2
37,300.00
unit
12,129,000.00
unit
2,332,500.00
Total pekerjaan Ground Reservoar & Rumah Pompa

JUMLAH
1,389,131.68
1,798,950.00
2,003,010.00
24,258,000.00
4,665,000.00
214,761,412.26

(10) K2-BGNN PENNJG - hal : 133 / 324

SAT

HARGA

m3
52,600.00
m3
32,600.00
m2
18,600.00
M2
2,332,500.00
unit
13,995,000.00
ls
9,330,000.00
m2
83,900.00
m2
18,600.00
m3
261,200.00
m3
251,900.00
m3
121,200.00
m3
803,731.00
m2
1,866,000.00
Total pekerjaan Kolam
PEKERJAAN BANGUNAN PENUNJANG

JUMLAH

231,440,000.00
143,440,000.00
3,348,000.00
104,962,500.00
27,990,000.00
9,330,000.00
15,102,000.00
3,348,000.00
11,754,000.00
9,068,400.00
1,090,800.00
297,380,470.00
16,794,000.00
875,048,170.00
1,089,809,582.26

(10) K2-BGNN PENNJG - hal : 134 / 324

NO

URAIAN PEKERJAAN

PEKERJAAN SITE DEVELOPMENT

1
2
3
4
5
6
7
8
9
10
11

Penyiapan badan jalan, pemadatan tanah CBR 6%


Galian Tanah untuk jalan
Urugan dan pemadatan tanah (t=20 cm)
Sirtu class B/Sub Base (t=25cm)
Crushed stone class A/Base course (t=20cm)
Pasir abu batu t=5 cm
Paving block t=8 cm K350
Kerb Pracetak Abu - Abu Uk 16/20.30.40 K-300
Saluran keliling gedung U-Ditch 40 x40
Bak kontrol Berikut tutup 60 x 60
Rumput Gajah mini

VOLUME

SAT

2,428.00
m2
148.00
m3
485.60
m3
607.00
m3
485.60
m3
121.40
m3
2,428.00
m2
579.00
m1
200.00
m1
13.00
Bh
300.00
m2
PEKERJAAN SITE DEV

(11) Landscape - hal : 135 / 324

HARGA

2,300.00
60,678.00
17,700.00
248,976.00
265,776.00
116,600.00
118,798.00
92,000.60
268,700.00
209,900.00
18,600.00
PEKERJAAN SITE DEVELOPMENT

JUMLAH

5,584,400
8,980,344
8,595,120
151,128,432
129,060,826
14,155,240
288,441,544
53,268,347
53,740,000
2,728,700
5,580,000
721,262,953

(11) Landscape - hal : 136 / 324

ANALISA HARGA SATUAN PEKERJAAN


PEKERJAAN ARSITEKTUR
NO

JENIS PEKERJAAN

Pasangan Bata Ringan batu dengan perekat MU ( Tebal.10 cm )


Bata ringan T.10 cm
Bahan MU.380 Untuk pasangan
Pekerja
Tukang batu
Kepala tukang batu
Mandor

Pasangan Bata Ringan batu dengan perekat MU ( Tebal.6 cm )


Bata ringan T.6 cm
Bahan MU.380 Untuk pasangan
Pekerja
Tukang batu
Kepala tukang batu
Mandor

Pasangan Batako, 1 Pc : 6 Psr


Batako
Semen PC
Pasir Pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor

Plester dinding bahan MU /m

NO

JENIS PEKERJAAN
Bahan MU.301 Untuk Plester
Pekerja
Tukang batu
Kepala tukang batu
Mandor

Acian dinding bahan MU /m


Bahan MU.200 Untuk Aci
Pekerja
Tukang batu
Kepala tukang batu
Mandor

Pek. Acian bahan semen PC /m


Semen Pc
Pekerja
Tukang batu
Kepala tukang batu
Mandor

Pekerjaan Sceed T.4 cm /m


Pasir beton
Semen Pc
Pekerja
Tukang batu
Kepala tukang batu
Mandor

NO

JENIS PEKERJAAN

Pasangan Batu bata batu ad. 1 : 5


Bata merah
Pasir Pasang
Semen
Pekerja
Tukang batu
Kepala tukang batu
Mandor

NO

JENIS PEKERJAAN

Lantai keramik roman. 30 x 30 cm /m


Keramik roman. 30 x 30 cm
Portland cement
Pasir Pasang
Grouting naad MU.408
Pekerja
Tukang batu
Kepala tukang batu
Mandor

Lantai keramik roman. 40 x 40 cm /m


Keramik roman. 40 x 40 cm
Portland cement
Pasir Pasang
Grouting naad MU.408
Pekerja
Tukang batu
Kepala tukang batu
Mandor

Lantai Homogeunious Tile Polish Ex Granito. 60 x 60 cm /m ( Salsa )


Homogeunious Tile 60 x 60 cm
Portland cement
Pasir Pasang
Grouting naad MU.408
Pekerja
Tukang batu
Kepala tukang batu
Mandor

10

Lantai keramik Anti Slip roman. 20 x 20 cm /m


Keramik Anti Slip roman. 20 x 20 cm

NO

JENIS PEKERJAAN
Portland cement
Pasir Pasang
Grouting naad MU.408
Pekerja
Tukang batu
Kepala tukang batu
Mandor

11

Dinding keramik roman. 20 x 25 cm /m


Keramik dinding roman. 20 x 25 cm
Portland cement
Pasir Pasang
Grouting naad MU.408
Pekerja
Tukang batu
Kepala tukang batu
Mandor

NO

JENIS PEKERJAAN

12

Plint keramik 10x30 / m1


Plint Keramik
Semen
Pasir Pasang
AM Grout
Upah Pas. Keramik

13

Plint Homogenus / granito tile 10x60 / m1


Plint homogenus tile
Semen
Pasir Pasang
AM Grout
Upah Pas. Keramik

14

Step nozing tangga.10 x 40 / m1


Stair Nosing 10x40 cm
Semen
Pasir Pasang
AM Grout
Upah Pas. Keramik

15

Plafond Gypsum t = 9 mm + rangka Metal Furing / M2


Rangka Plafond
Gypsum 9 mm
Skrup Gpsum 5 cm
Skrup Gpsum 3 cm
Joint Tape
Cornise Gypsum
Alat Bantu
Pekerja

NO

JENIS PEKERJAAN
Tukang plafond
Kep. Tukang Plafond
Mandor

16

Plafond GRC t = 4 mm + rangka Metal Furing (Toilet) / M2


Rangka Plafond
GRC.4 MM
Skrup Gpsum 5 cm
Skrup Gpsum 3 cm
Joint Tape
Cornise Gypsum
Alat Bantu
Pekerja
Tukang plafond
Kep. Tukang Plafond
Mandor

NO

17

JENIS PEKERJAAN

Cat dinding Luar Dulux Weathershiaed / m ( Ex ICI )


Cat Alkali
Cat Dulux weathershield
Ampelas
Rol cat
Steger werk
Pekerja
Tukang cat
Kepala tukang cat
Mandor

18

Cat dinding dalam Dulux Pantalite / m2 ( Ex ICI )


Plamir
Cat dasar Dulux pantalite
Cat penutup Dulux pantalite
Ampelas
Rol cat
Steger werk
Pekerja
Tukang cat
Kepala tukang cat
Mandor

19

Pek.Pancang 20x20 cm.L.9 m.190 ttk ( Pengaman Galian Basement )


Mob demob Alat Pancang
Pengadaan Beton Pancang 20x20 cm
Pemancangan

NO

JENIS PEKERJAAN

HARGA-SAT
( Rp )

VOLUME

MATERIAL
( Rp )

8.50
6.00
0.15
0.12
0.02
0.02

bh
kg
oh
oh
oh
oh

7,900.00
3,600.00
88,200.00
103,800.00
119,600.00
135,200.00

67,150.00
21,600.00

8.50
6.00
0.15
0.12
0.02
0.02

bh
kg
oh
oh
oh
oh

6,000.00
3,600.00
88,200.00
103,800.00
119,600.00
135,200.00

51,000.00
21,600.00

12.50
1.60
0.05
0.15
0.12
0.02
0.02

bh
kg
m3
oh
oh
oh
oh

2,500.00
1,240.00
248,800.00
88,200.00
103,800.00
119,600.00
135,200.00

31,250.00
1,984.00
12,440.00

HARGA-SAT
( Rp )

VOLUME

MATERIAL
( Rp )

11.00
0.10
0.10
0.02
0.02

kg
oh
oh
oh
oh

1,100.00
88,200.00
103,800.00
119,600.00
135,200.00

12,100.00

3.00
0.05
0.05
0.01
0.01

kg
oh
oh
oh
oh

3,800.00
88,200.00
103,800.00
119,600.00
135,200.00

11,400.00

3.25
0.15
0.10
0.01
0.01

kg
oh
oh
oh
oh

1,240.00
88,200.00
103,800.00
119,600.00
135,200.00

4,030.00

0.05
15.00
0.21
0.21
0.02
0.02

m3
kg
oh
oh
oh
oh

250,100.00
1,240.00
88,200.00
103,800.00
119,600.00
135,200.00

11,254.50
18,600.00

HARGA-SAT
( Rp )

VOLUME

70.00
0.04
11.00
0.30
0.10
0.01
0.02

bh
m3
kg
oh
oh
oh
oh

500.00
248,800.00
1,240.00
88,200.00
103,800.00
119,600.00
135,200.00

MATERIAL
( Rp )

35,000.00
9,952.00
13,640.00

HARGA-SAT
( Rp )

VOLUME

MATERIAL
( Rp )

1.00
13.00
0.05
0.35
0.27
0.17
0.03
0.03

m2
kg
m
kg
oh
oh
oh
oh

76,000.00
1,240.00
248,800.00
2,400.00
88,200.00
103,800.00
119,600.00
135,200.00

76,000.00
16,120.00
11,196.00
840.00

1.00
13.00
0.05
0.35
0.27
0.17
0.03
0.03

m2
kg
m
kg
oh
oh
oh
oh

84,000.00
1,240.00
248,800.00
2,400.00
88,200.00
103,800.00
119,600.00
135,200.00

84,000.00
16,120.00
11,196.00
840.00

1.00
13.00
0.05
0.35
0.27
0.17
0.03
0.03

m2
kg
m
kg
oh
oh
oh
oh

195,000.00
1,240.00
248,800.00
2,400.00
88,200.00
103,800.00
119,600.00
135,200.00

195,000.00
16,120.00
11,196.00
840.00

1.00 m2

74,500.00

74,500.00

60 cm /m ( Salsa )

HARGA-SAT
( Rp )

VOLUME

MATERIAL
( Rp )

13.00
0.05
0.35
0.27
0.17
0.03
0.03

kg
m
kg
oh
oh
oh
oh

1,240.00
248,800.00
2,400.00
88,200.00
103,800.00
119,600.00
135,200.00

16,120.00
11,196.00
840.00

1.00
13.00
0.05
0.35
0.33
0.27
0.03
0.03

m2
kg
m
kg
oh
oh
oh
oh

76,000.00
1,240.00
248,800.00
2,400.00
88,200.00
103,800.00
119,600.00
135,200.00

76,000.00
16,120.00
11,196.00
840.00

HARGA-SAT
( Rp )

VOLUME

MATERIAL
( Rp )

3.33
0.15
0.01
0.02
0.11

lbr
Zak
m3
kg
m2

6,500.00
62,000.00
248,800.00
2,400.00
47,830.00

21,666.67
9,114.00
2,488.00
48.00

1.67
0.02
0.00
0.20
0.13

lbr
Zak
m3
kg
m2

17,000.00
62,000.00
248,800.00
2,400.00
47,830.00

28,333.33
1,488.00
248.80
480.00

2.50
0.12
0.00
0.02
0.13

lbr
Zak
m3
kg
m2

18,500.00
62,000.00
248,800.00
2,400.00
47,830.00

46,250.00
7,440.00
870.80
48.00

1.00
0.40
12.00
12.00
0.05
0.01
1.00
0.15

m2
lbr
bh
bh
roll
zak
ls
oh

37,500.00
70,000.00
300.00
100.00
32,500.00
43,000.00
1,500.00
88,200.00

37,500.00
27,930.00
3,600.00
1,200.00
1,625.00
430.00
1,500.00

HARGA-SAT
( Rp )

VOLUME
0.12 oh
0.01 oh
0.01 oh

1.00
0.40
12.00
12.00
0.05
0.01
1.00
0.15
0.12
0.01
0.01

m2
lbr
bh
bh
roll
zak
ls
oh
oh
oh
oh

MATERIAL
( Rp )

103,800.00
119,600.00
135,200.00

37,500.00
60,000.00
300.00
100.00
32,500.00
43,000.00
1,500.00
88,200.00
103,800.00
119,600.00
135,200.00

37,500.00
23,940.00
3,600.00
1,200.00
1,625.00
430.00
1,500.00

HARGA-SAT
( Rp )

VOLUME

MATERIAL
( Rp )

0.10
0.24
0.35
0.01
1.00
0.01
0.04
0.00
0.00

ltr
kg
lbr
bh
ls
oh
oh
oh
oh

47,500.00
62,500.00
4,000.00
32,000.00
1,350.00
88,200.00
70,000.00
75,000.00
135,200.00

4,750.00
15,000.00
1,400.00
320.00
1,350.00

0.10
0.10
0.24
0.35
0.01
1.00
0.01
0.04
0.00
0.00

kg
kg
kg
lbr
bh
ls
oh
oh
oh
oh

11,700.00
28,500.00
28,500.00
4,000.00
32,000.00
1,350.00
88,200.00
70,000.00
75,000.00
135,200.00

1,170.00
2,850.00
6,840.00
1,400.00
320.00
1,350.00

14,400,000.00
120,000.00
60,000.00

14,400,000.00
205,200,000.00

Galian Basement )
1.00 Unit
1,710.00 m'
1,710.00 m'

VOLUME

HARGA-SAT
( Rp )

MATERIAL
( Rp )

UPAH
( Rp )

JUMLAH
( Rp )

13,230.00
12,456.00
1,794.00
2,028.00
Jumlah
Jasa 10 %
Juml.Harga

118,258.00
11,825.80
130,083.80

13,230.00
12,456.00
1,794.00
2,028.00
Jumlah
Jasa 10 %
Juml.Harga

102,108.00
10,210.80
112,318.80

13,230.00
12,456.00
1,794.00
2,028.00
Jumlah
Jasa 10 %
Juml.Harga

75,182.00
7,518.20
82,700.20

UPAH
( Rp )

JUMLAH
( Rp )

8,820.00
10,380.00
2,392.00
2,704.00
Jumlah
Jasa 10 %
Juml.Harga

36,396.00
3,639.60
40,035.60

4,410.00
5,190.00
1,196.00
1,352.00
Jumlah
Jasa 10 %
Juml.Harga

23,548.00
2,354.80
25,902.80

13,230.00
10,380.00
1,196.00
1,081.60
Jumlah
Jasa 10 %
Juml.Harga

29,917.60
2,991.76
32,909.36

18,522.00
21,798.00
2,631.20
2,974.40
Jumlah
Jasa 10 %

75,780.10
7,578.01

UPAH
( Rp )
Juml.Harga

JUMLAH
( Rp )
83,358.11

26,460.00
10,380.00
1,196.00
2,028.00
Jumlah
Jasa 10 %
Juml.Harga

98,656.00
9,865.60
108,521.60

UPAH
( Rp )

JUMLAH
( Rp )

23,814.00
17,646.00
2,990.00
3,380.00
Jumlah
Jasa 10 %
Juml.Harga

151,986.00
15,198.60
167,184.60

23,814.00
17,646.00
2,990.00
3,380.00
Jumlah
Jasa 10 %
Juml.Harga

159,986.00
15,998.60
175,984.60

23,814.00
17,646.00
2,990.00
3,380.00
Jumlah
Jasa 10 %
Juml.Harga

270,986.00
27,098.60
298,084.60

UPAH
( Rp )

JUMLAH
( Rp )

23,814.00
17,646.00
2,990.00
3,380.00
Jumlah
Jasa 10 %
Juml.Harga

150,486.00
15,048.60
165,534.60

29,106.00
28,026.00
2,990.00
3,380.00
Jumlah
Jasa 10 %
Juml.Harga

167,658.00
16,765.80
184,423.80

UPAH
( Rp )

JUMLAH
( Rp )

5,314.44
Jumlah
Jasa 10 %
Juml.Harga

38,631.11
3,863.11
42,494.22

5,978.75
Jumlah
Jasa 10 %
Juml.Harga

36,528.88
3,652.89
40,181.77

5,978.75
Jumlah
Jasa 10 %
Juml.Harga

60,587.55
6,058.76
66,646.31

13,230.00

UPAH
( Rp )

JUMLAH
( Rp )

12,456.00
1,435.20
1,014.00
Jumlah
Jasa 10 %
Juml.Harga

101,920.20
10,192.02
112,112.22

13,230.00
12,456.00
1,435.20
1,014.00
Jumlah
Jasa 10 %
Juml.Harga

97,930.20
9,793.02
107,723.22

UPAH
( Rp )

JUMLAH
( Rp )

882.00
2,800.00
225.00
405.60
Jumlah
Jasa 10 %
Juml.Harga

27,132.60
2,713.26
29,845.86

882.00
2,800.00
225.00
405.60
Jumlah
Jasa 10 %
Juml.Harga

18,242.60
1,824.26
20,066.86

102,600,000.00
Jumlah
Jasa 10 %
Juml.Harga
Jakarta, 30 Nopember 2012

322,200,000.00
32,220,000.00
354,420,000.00

UPAH
( Rp )
PT. Nugraha Adi Taruna

Ir. G.T. Yudi Rahman


Direktur Utama

JUMLAH
( Rp )

ANALISA KUSEN
No
1

Uraian
PJ1
Alumunium U
Kaca tempered 12 mm
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PJ5
Alumunium U
Kaca tempered 12 mm
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PJ4
Alumunium U
Kaca tempered 12 mm
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan

sat

volume

m1
m2
bh
bh
bh
bh
bh
m2

25.03
21.76
2.00
2.00
1.00
2.00
2.00
21.76

m1
m2
bh
bh
bh
bh
bh
m2

16.91
13.24
2.00
2.00
1.00
2.00
2.00
13.24

m1
m2
bh
bh
bh
bh
bh
m2

16.91
13.24
1.00
1.00
1.00
1.00
1.00
13.24

No
1

Uraian
PJ3
Alumunium U
Kaca tempered 12 mm
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PJ2
Alumunium U
Kaca tempered 12 mm
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
P6
Alumunium U
Kaca tempered 12 mm
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
J2
Alumunium U
Kaca tempered 12 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2

sat

volume

m1
m2
bh
bh
bh
bh
bh
m2

17.01
8.61
2.00
2.00
2.00
2.00
2.00
8.61

m1
m2
bh
bh
bh
bh
bh
m2

24.74
34.03
2.00
2.00
2.00
2.00
2.00
34.03

m1
m2
bh
bh
bh
bh
bh
m2

10.92
6.78
2.00
2.00
2.00
2.00
2.00
6.78

m1
m2
m2

15.65
11.62
11.62

No

Uraian
Pembulatan

sat

volume

No
1

Uraian
J1
Alumunium U
Kaca tempered 12 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PT7
Partisi PVC
Engsel pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PT6
Partisi PVC
Engsel pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
J5
Alumunium U
Kaca tempered 12 mm
Engsel jendela
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
J4
Alumunium U
Kaca tempered 12 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan

sat

volume

m1
m2
m2

17.48
17.73
17.73

m2
bh
m2

1.42
4.00
1.42

m2
bh
m2

4.97
4.00
4.97

m1
m2
bh
m2

96.31
48.27
12.00
48.27

m1
m2
m2

6.68
2.43
2.43

No
1

Uraian
J3
Alumunium U
Kaca tempered 12 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PJP2
Alumunium 4" powder coating
Kaca tempered 12 mm
Sticker sandblast
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PJP4
Alumunium 4" powder coating
Kaca tempered 12 mm
Sticker sandblast
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan

sat

volume

m1
m2
m2

10.61
6.46
6.46

m1
m2
m2
bh
bh
bh
bh
bh
m2

19.95
8.53
8.53
1.00
1.00
1.00
1.00
1.00
8.53

m1
m2
m2
bh
bh
bh
bh
bh
m2

29.14
14.33
14.33
2.00
2.00
2.00
2.00
2.00
14.33

No
1

Uraian
PP1
Alumunium 4" powder coating
Kaca tempered 12 mm
Sticker sandblast
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PJP3
Alumunium 4" powder coating
Kaca tempered 12 mm
Sticker sandblast
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
JP1
Alumunium 4" powder coating
Kaca tempered 12 mm
Sticker sandblast
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PT5
Partisi PVC
Engsel pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan

sat

volume

m1
m2
m2
bh
bh
bh
bh
bh
m2

10.79
5.53
5.53
2.00
2.00
2.00
2.00
2.00
5.53

m1
m2
m2
bh
bh
bh
bh
bh
m2

17.17
9.92
9.92
2.00
2.00
2.00
2.00
2.00
9.92

m1
m2
m2
m2

25.78
11.39
11.39
11.39

m2
bh
m2

6.39
6.00
6.39

No
1

Uraian
J7
Alumunium U
Kaca tempered 12 mm
Engsel jendela
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PJP1
Alumunium 4" powder coating
Kaca tempered 12 mm
Sticker sandblast
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
J6
Alumunium U
Kaca tempered 12 mm
Engsel jendela
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PB2
Pintu besi + accessories
Jalusi plat besi
Cat besi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan

sat

volume

m1
m2
bh
m2

96.31
48.27
12.00
48.27

m1
m2
m2
bh
bh
bh
bh
bh
m2

37.96
17.27
17.27
1.00
1.00
1.00
1.00
1.00
17.27

m1
m2
bh
m2

87.54
48.27
12.00
48.27

m2
m2
m2
m2

3.27
0.39
3.67
3.67

No
1

Uraian
P6
Pintu besi + accessories
Cat besi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
P1 & P1'
Pintu besi + accessories
Cat besi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
P2
Alumunium 4" powder coating
Daun pintu kayu
Kaca polos 5 mm
Handle + kunci
Kunci tanam
Engsel pintu
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PP2
Alumunium 4" powder coating
Daun pintu kayu
Kaca polos 5 mm
Handle + kunci
Kunci tanam
Engsel pintu
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan

sat

volume

m2
m2
m2

3.84
3.84
3.84

m2
m2
m2

2.48
2.48
2.48

m1
m2
m2
bh
bh
bh
m2
m2

7.77
1.89
0.66
1.00
1.00
3.00
1.89
2.65

m1
m2
m2
bh
bh
bh
m2
m2

7.77
1.98
0.66
1.00
1.00
3.00
1.98
2.65

No
1

Uraian
PP3
Alumunium 4" powder coating
Daun pintu kayu
Handle + kunci
Kunci tanam
Engsel pintu
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PJ7
Alumunium 4" powder coating
Daun pintu kayu
Daun jendela alumunium
Kaca polos 5 mm
Handle + kunci
Kunci tanam
Engsel pintu
Engsel jendela
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PJ8
Alumunium 4" powder coating
Daun pintu kayu
Daun jendela alumunium
Kaca polos 5 mm
Handle + kunci
Kunci tanam
Engsel pintu
Engsel jendela
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan

sat

volume

m1
m2
bh
bh
bh
m2
m2

5.46
2.03
1.00
1.00
3.00
2.03
2.03

m1
m2
m1
m2
bh
bh
bh
bh
m2
m2

16.38
1.76
6.93
3.18
1.00
1.00
3.00
4.00
1.76
4.95

m1
m2
m1
m2
bh
bh
bh
bh
m2
m2

12.13
1.76
3.47
2.01
1.00
1.00
3.00
2.00
1.76
3.77

No
1

Uraian
P3
Alumunium 4" powder coating
Daun pintu kayu
Kaca polos 5 mm
Handle + kunci
Kunci tanam
Engsel pintu
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
P4 & P4'
Alumunium 4" powder coating
Daun pintu kayu
Kaca polos 5 mm
Handle + kunci
Kunci tanam
Engsel pintu
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PB1
Alumunium 4" powder coating
Daun pintu kayu
Kaca polos 5 mm
Handle + kunci
Kunci tanam
Engsel pintu
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan

sat

volume

m1
m2
m2
bh
bh
bh
m2
m2

7.77
1.89
0.66
1.00
1.00
3.00
1.89
2.55

m1
m2
m2
bh
bh
bh
m2
m2

7.56
1.68
0.59
1.00
1.00
3.00
1.68
2.27

m1
m2
m2
bh
bh
bh
m2
m2

9.77
1.81
0.79
1.00
1.00
3.00
1.81
2.59

No
1

Uraian
P5
Alumunium 4" powder coating
Daun pintu kayu
Handle + kunci
Kunci tanam
Engsel pintu
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
Ps
Alumunium 4" powder coating
Daun pintu kayu
Handle + kunci
Kunci tanam
Engsel pintu
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
BV3
Alumunium 4" powder coating
Kaca polos 5 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
BV4
Alumunium 4" powder coating
Kaca polos 5 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan

sat

volume

m1
m2
bh
bh
bh
m2
m2

5.36
1.81
1.00
1.00
3.00
1.81
1.81

m1
m2
bh
bh
bh
m2
m2

5.25
1.94
1.00
1.00
3.00
1.94
1.94

m1
m2
m2

10.08
2.24
2.24

m1
m2
m2

7.77
1.69
1.69

No
1

Uraian
BV5
Alumunium 4" powder coating
Kaca polos 5 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
BV6
Alumunium 4" powder coating
Kaca polos 5 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
BV1'
Alumunium 4" powder coating
Kaca polos 5 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
BV1
Jalusi besi
Cat besi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
BV2'
Alumunium 4" powder coating
Kaca polos 5 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan

sat

volume

m1
m2
m2

5.46
1.14
1.14

m1
m2
m2

3.15
0.59
0.59

m1
m2
m2

6.93
1.21
1.21

m2
m2
m2

1.21
1.21
1.21

m1
m2
m2

15.33
0.81
0.81

No
1

Uraian
BV2
Jalusi besi
Cat besi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
P7
Alumunium 4" powder coating
Daun pintu kayu
Handle + kunci
Kunci tanam
Engsel pintu
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PP4
Partisi gypsum
Rel gantung
Kunci tanam
Engsel pintu
Cat partisi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PT2, PT3, PT4
Partisi gypsum
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan

sat

volume

m2
m2
m2

0.81
0.81
0.81

m1
m2
bh
bh
bh
m2
m2

6.30
3.84
2.00
1.00
6.00
3.84
3.84

m2
unit
bh
bh
m2
m2

26.57
1.00
1.00
27.00
53.13
26.57

m2
m2

1.05
1.05

No
1

Uraian
PT1
Partisi gypsum
Kusen alumunium 4" powder coating
Kaca polos 5 mm
Upah kerja
Jumlah 1
Jumlah 2 (per m2)
Jasa 10%
Jumlah 2
Pembulatan
Grill penutup saluran
Siku 5 x 5
Plat strip 3 cm
Besi 10 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
Railing tangga
Hollow 5/5
Hollow 2/2
Plat strip 5/5
Base plat 6 mm
Angkur
Catbesi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
Hand rail
Hollow 5/5
Hollow 2/2
Base plat 6 mm
Angkur
Catbesi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan

sat

volume

m2
m1
m2
m2

3.15
5.10
1.05
3.15

kg
kg
kg
m1

8.32
7.70
1.36
1.00

kg
kg
kg
kg
bh
kg
m1

16.97
3.70
1.29
1.07
4.00
23.03
1.00

kg
kg
kg
bh
kg
m1

6.06
0.49
1.07
4.00
7.62
1.00

No
1

Uraian
Grill penutup saluran
Plat 12 mm
Besi 10 mm
Besi 19 mm
Angkur
Catbesi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan

sat
kg
kg
kg
bh
kg
m1

volume
16.36
3.39
12.24
8.00
32.00
1.00

harga satuan

jumlah

16,600.00
850,000.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00

415,531.20
18,492,600.00
250,400.00
250,400.00
709,500.00
1,669,600.00
4,174,000.00
907,225.20
26,869,256.40
2,686,925.64
29,556,182.04
29,556,180.00

16,600.00
850,000.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00

280,623.00
11,254,068.00
250,400.00
250,400.00
709,500.00
1,669,600.00
4,174,000.00
552,111.34
19,140,702.34
1,914,070.23
21,054,772.57
21,054,770.00

16,600.00
850,000.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00

280,623.00
11,254,068.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
552,111.34
15,968,502.34
1,596,850.23
17,565,352.57
17,565,350.00

harga satuan

jumlah

16,600.00
850,000.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00

282,366.00
7,318,500.00
250,400.00
250,400.00
1,419,000.00
1,669,600.00
4,174,000.00
359,037.00
15,723,303.00
1,572,330.30
17,295,633.30
17,295,630.00

16,600.00
850,000.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00

410,650.80
28,927,710.00
250,400.00
250,400.00
1,419,000.00
1,669,600.00
4,174,000.00
1,419,159.42
38,520,920.22
3,852,092.02
42,373,012.24
42,373,010.00

16,600.00
850,000.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00

181,272.00
5,763,318.75
250,400.00
250,400.00
1,419,000.00
1,669,600.00
4,174,000.00
282,741.64
13,990,732.39
1,399,073.24
15,389,805.63
15,389,800.00

16,600.00
850,000.00
41,700.00

259,707.00
9,879,975.00
484,699.95
10,624,381.95
1,062,438.20
11,686,820.15

harga satuan

jumlah
11,686,820.00

harga satuan

jumlah

16,600.00
850,000.00
41,700.00

290,209.50
15,072,093.75
739,419.19
16,101,722.44
1,610,172.24
17,711,894.68
17,711,890.00

1,043,500.00
29,200.00
41,700.00

1,479,161.25
116,800.00
59,109.75
1,655,071.00
165,507.10
1,820,578.10
1,820,570.00

1,043,500.00
29,200.00
41,700.00

5,182,542.75
116,800.00
207,103.05
5,506,445.80
550,644.58
6,057,090.38
6,057,090.00

16,600.00
850,000.00
20,000.00
41,700.00

1,598,679.60
41,030,456.25
240,000.00
2,012,905.91
44,882,041.76
4,488,204.18
49,370,245.94
49,370,240.00

16,600.00
850,000.00
41,700.00

110,854.80
2,067,476.25
101,427.95
2,279,759.00
227,975.90
2,507,734.90
2,507,730.00

harga satuan

jumlah

16,600.00
850,000.00
41,700.00

176,043.00
5,488,875.00
269,277.75
5,934,195.75
593,419.58
6,527,615.33
6,527,610.00

122,700.00
850,000.00
125,200.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00

2,447,865.00
7,247,100.00
1,067,455.20
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
355,534.20
14,999,654.40
1,499,965.44
16,499,619.84
16,499,610.00

122,700.00
850,000.00
125,200.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00

3,575,171.25
12,182,625.00
1,794,429.00
250,400.00
250,400.00
1,419,000.00
1,669,600.00
4,174,000.00
597,665.25
25,913,290.50
2,591,329.05
28,504,619.55
28,504,610.00

harga satuan

jumlah

122,700.00
850,000.00
125,200.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00

1,324,423.80
4,698,120.00
692,005.44
250,400.00
250,400.00
1,419,000.00
1,669,600.00
4,174,000.00
230,484.24
14,708,433.48
1,470,843.35
16,179,276.83
16,179,270.00

122,700.00
850,000.00
125,200.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00

2,106,452.25
8,434,125.00
1,242,297.00
250,400.00
250,400.00
1,419,000.00
1,669,600.00
4,174,000.00
413,768.25
19,960,042.50
1,996,004.25
21,956,046.75
21,956,040.00

122,700.00
850,000.00
125,200.00
41,700.00

3,162,899.25
9,683,625.00
1,426,341.00
475,067.25
14,747,932.50
1,474,793.25
16,222,725.75
16,222,720.00

1,043,500.00
29,200.00
41,700.00

6,666,634.54
175,200.00
266,409.83
7,108,244.37
710,824.44
7,819,068.81
7,819,060.00

harga satuan

jumlah

16,600.00
850,000.00
20,000.00
41,700.00

1,598,679.60
41,030,456.25
240,000.00
2,012,905.91
44,882,041.76
4,488,204.18
49,370,245.94
49,370,240.00

122,700.00
850,000.00
125,200.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00

4,657,385.25
14,681,625.00
2,162,517.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
720,263.25
26,103,490.50
2,610,349.05
28,713,839.55
28,713,830.00

16,600.00
850,000.00
20,000.00
41,700.00

1,453,139.10
41,030,456.25
240,000.00
2,012,905.91
44,736,501.26
4,473,650.13
49,210,151.39
49,210,150.00

834,800.00
417,400.00
29,200.00
83,400.00

2,732,613.45
164,351.25
107,080.05
305,838.23
3,309,882.98
330,988.30
3,640,871.27
3,640,870.00

harga satuan

jumlah

834,800.00
29,200.00
83,400.00

3,203,753.70
112,062.30
320,068.35
3,635,884.35
363,588.44
3,999,472.79
3,999,470.00

1,460,900.00
29,200.00
83,400.00

3,627,779.93
72,510.90
207,103.05
3,907,393.88
390,739.39
4,298,133.26
4,298,130.00

122,700.00
626,100.00
83,400.00
125,200.00
41,700.00
29,200.00
75,100.00
41,700.00

953,379.00
1,183,329.00
55,169.10
125,200.00
41,700.00
87,600.00
141,939.00
110,338.20
2,698,654.30
269,865.43
2,968,519.73
2,968,510.00

122,700.00
626,100.00
83,400.00
125,200.00
41,700.00
29,200.00
75,100.00
41,700.00

953,379.00
1,242,495.45
55,169.10
125,200.00
41,700.00
87,600.00
149,035.95
110,338.20
2,764,917.70
276,491.77
3,041,409.47
3,041,400.00

harga satuan

jumlah

122,700.00
626,100.00
125,200.00
41,700.00
29,200.00
75,100.00
41,700.00

669,942.00
1,272,078.68
125,200.00
41,700.00
87,600.00
152,584.43
84,723.98
2,433,829.08
243,382.91
2,677,211.98
2,677,210.00

122,700.00
626,100.00
100,100.00
83,400.00
125,200.00
41,700.00
29,200.00
20,000.00
75,100.00
41,700.00

2,009,826.00
1,104,440.40
693,693.00
265,337.10
125,200.00
41,700.00
87,600.00
80,000.00
132,476.40
206,227.35
4,746,500.25
474,650.03
5,221,150.28
5,221,150.00

122,700.00
626,100.00
100,100.00
83,400.00
125,200.00
41,700.00
29,200.00
20,000.00
75,100.00
41,700.00

1,488,044.25
1,104,440.40
346,846.50
167,258.70
125,200.00
41,700.00
87,600.00
40,000.00
132,476.40
157,188.15
3,690,754.40
369,075.44
4,059,829.84
4,059,820.00

harga satuan

jumlah

122,700.00
626,100.00
83,400.00
125,200.00
41,700.00
29,200.00
75,100.00
41,700.00

953,379.00
1,183,329.00
55,169.10
125,200.00
41,700.00
87,600.00
141,939.00
106,397.55
2,694,713.65
269,471.37
2,964,185.02
2,964,180.00

122,700.00
626,100.00
83,400.00
125,200.00
41,700.00
29,200.00
75,100.00
41,700.00

927,612.00
1,051,848.00
49,039.20
125,200.00
41,700.00
87,600.00
126,168.00
94,575.60
2,503,742.80
250,374.28
2,754,117.08
2,754,110.00

122,700.00
626,100.00
83,400.00
125,200.00
41,700.00
29,200.00
75,100.00
41,700.00

1,198,165.50
1,130,736.60
65,677.50
125,200.00
41,700.00
87,600.00
135,630.60
108,148.95
2,892,859.15
289,285.92
3,182,145.07
3,182,140.00

harga satuan

jumlah

122,700.00
626,100.00
125,200.00
41,700.00
29,200.00
75,100.00
41,700.00

657,058.50
1,130,736.60
125,200.00
41,700.00
87,600.00
135,630.60
75,310.20
2,253,235.90
225,323.59
2,478,559.49
2,478,550.00

122,700.00
626,100.00
125,200.00
41,700.00
29,200.00
75,100.00
41,700.00

644,175.00
1,212,912.23
125,200.00
41,700.00
87,600.00
145,487.48
80,783.33
2,337,858.03
233,785.80
2,571,643.83
2,571,640.00

122,700.00
83,400.00
50,000.00

1,236,816.00
186,961.95
112,087.50
1,535,865.45
153,586.55
1,689,452.00
1,689,450.00

122,700.00
83,400.00
50,000.00

953,379.00
140,987.70
84,525.00
1,178,891.70
117,889.17
1,296,780.87
1,296,780.00

harga satuan

jumlah

122,700.00
83,400.00
50,000.00

669,942.00
95,013.45
56,962.50
821,917.95
82,191.80
904,109.75
904,100.00

122,700.00
83,400.00
50,000.00

386,505.00
49,039.20
29,400.00
464,944.20
46,494.42
511,438.62
511,430.00

122,700.00
83,400.00
50,000.00

850,311.00
100,705.50
60,375.00
1,011,391.50
101,139.15
1,112,530.65
1,112,530.00

417,400.00
29,200.00
83,400.00

504,010.50
35,259.00
100,705.50
639,975.00
63,997.50
703,972.50
703,970.00

122,700.00
83,400.00
50,000.00

1,880,991.00
67,866.75
40,687.50
1,989,545.25
198,954.53
2,188,499.78
2,188,490.00

harga satuan

jumlah

417,400.00
29,200.00
83,400.00

339,659.25
23,761.50
67,866.75
431,287.50
43,128.75
474,416.25
474,410.00

122,700.00
626,100.00
125,200.00
41,700.00
29,200.00
75,100.00
41,700.00

773,010.00
2,402,815.28
250,400.00
41,700.00
175,200.00
288,215.03
160,034.18
4,091,374.48
409,137.45
4,500,511.92
4,500,510.00

100,100.00
292,100.00
41,700.00
29,200.00
62,600.00
20,800.00

2,659,156.50
292,100.00
41,700.00
788,400.00
3,325,938.00
552,552.00
7,659,846.50
765,984.65
8,425,831.15
8,425,830.00

100,100.00
20,800.00

105,105.00
21,840.00
126,945.00
12,694.50
139,639.50
139,630.00

harga satuan

jumlah

100,100.00
100,100.00
292,100.00
20,800.00

315,315.00
510,510.00
306,705.00
65,520.00
1,198,050.00
285,250.00
28,525.00
313,775.00
313,770.00

12,500.00
12,500.00
8,500.00
25,000.00

103,950.00
96,250.00
11,529.86
25,000.00
236,729.86
23,672.99
260,402.84
260,400.00

12,500.00
12,500.00
12,500.00
12,500.00
4,100.00
2,000.00
41,700.00

212,135.00
46,200.00
16,170.00
13,368.06
16,400.00
46,059.69
41,700.00
392,032.74
39,203.27
431,236.02
431,230.00

12,500.00
12,500.00
12,500.00
4,100.00
2,000.00
20,800.00

75,762.50
6,160.00
13,368.06
16,400.00
15,246.49
20,800.00
147,737.04
14,773.70
162,510.75
162,510.00

harga satuan
12,500.00
8,500.00
8,500.00
4,100.00
2,000.00
41,700.00

jumlah
204,531.25
28,824.65
104,056.98
32,800.00
63,991.26
41,700.00
475,904.14
47,590.41
523,494.55
523,490.00

1.Unit

1.Unit

1.Unit

1.Unit

Pasang Pintu Type.PJ.1


18.84 m'
14.70 m2
2.00 bh
5.85 m'
2.00 set
2.00 bh
2.00 set
70.00 m'

Aluminium U
Kaca Tempered 12mm
Daun Pintu Kaca Tempered 12mm
Gawangan Pintu
Konci Pintu dan Phat piting
Floor Hing Dorma BTS 84
Handel Pintu
Sealant kaca Tempered

Pasang Pintu Type.PJ.7 ( Aluminium )


15.50 m'
Kusen Aluminium 4"
7.40 m'
Frame jendela
1.68 m2
Daun Pintu Triplek
3.36 m2
Cat Daun Pintu DUCO
1.00 bh
Konci Pintu ( Setara Dekson )
3.00 bh
Engsel Pintu
4.00 bh
Engsel Jendela
2.00 bh
Grendel Jendela
3.35 m2
Kaca 5 mm
19.00 m'
Sealant kusen
32.80 m'
Sealant kaca

Pasang Pintu Type.PJ.8 ( Aluminium )


11.45 m'
Kusen Aluminium 4"
3.70 m'
Frame jendela
1.68 m2
Daun Pintu Triplek
3.36 m2
Cat Daun Pintu DUCO
1.00 bh
Konci Pintu ( Setara Dekson )
3.00 bh
Engsel Pintu
2.00 bh
Engsel Jendela
1.00 bh
Grendel Jendela
1.97 m2
Kaca 5 mm
16.00 m'
Sealant kusen
19.60 m'
Sealant kaca

Pasang Pintu Type.PB.1 ( Aluminium )


9.20 m'
Kusen Aluminium 4"
1.72 m2
Daun Pintu Triplek
3.44 m2
Cat Daun Pintu DUCO
1.00 bh
Konci Pintu ( Setara Dekson )
3.00 bh
Engsel Pintu

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

0.75 m2
16.40 m'
9.00 m'

Kaca 5 mm
Sealant kusen
Sealant kaca

@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

1.Unit

1.Unit

1.Unit

1.Unit

1.Unit

Pasang Pintu Type.PB.2 ( Besi )


3.12 m2
Kusen Pintu Type PB2
0.38 m2
Jalusi Plat Besi
6.61 m2
Cat Besi
1.00 bh
Upah Pasang

Pasang Pintu Type.P.1 & P1' ( Besi ) 2.15 x 1.10 m


2.37 m2
Kusen Pintu Type P1'
4.73 m2
Cat Daun Pintu DUCO
1.00 bh
Upah Pasang

Pasang Pintu Type.P.2 ( Aluminium )


7.40 m'
Kusen Aluminium 4"
1.89 m2
Daun Pintu Triplek
3.78 m2
Cat Daun Pintu DUCO
1.00 bh
Konci Pintu ( Setara Dekson )
3.00 bh
Engsel Pintu
0.63 m2
Kaca 5 mm
13.00 m'
Sealant kusen
6.40 m'
Sealant kaca

Pasang Pintu Type.P.3 ( Aluminium )


7.40 m'
Kusen Aluminium 4"
1.89 m2
Daun Pintu Triplek
3.78 m2
Cat Daun Pintu DUCO
1.00 bh
Konci Pintu ( Setara Dekson )
3.00 bh
Engsel Pintu
0.63 m2
Kaca 5 mm
13.00 m'
Sealant kusen
6.40 m'
Sealant kaca

Pasang Pintu Type.P.4 & P4' ( Aluminium )


7.20 m'
Kusen Aluminium 4"
1.68 m2
Daun Pintu Triplek
3.36 m2
Cat Daun Pintu DUCO
1.00 bh
Konci Pintu ( Setara Dekson )
3.00 bh
Engsel Pintu
0.56 m2
Kaca 5 mm
12.80 m'
Sealant kusen

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

6.00 m'

Sealant kaca

@ Rp.
Sub total :
Jasa.
Total Harga

1.Unit

1.Unit

1.Unit

1.Unit

1.Unit

Pasang Pintu Type.P.5 ( Aluminium )


5.10 m'
Kusen Aluminium 4"
1.72 m2
Daun Pintu Triplek
3.44 m2
Cat Daun Pintu DUCO
1.00 bh
Konci Pintu ( Setara Dekson )
3.00 bh
Engsel Pintu
10.20 m'
Sealant kusen

Pasang Pintu Type.PS ( Pintu Shaft)


5.00 m'
Kusen Aluminium 4"
1.84 m2
Daun Pintu Triplek
3.68 m2
Cat Daun Pintu DUCO
1.00 bh
Konci Pintu ( Setara Dekson )
3.00 bh
Engsel Pintu
10.40 m'
Sealant kusen

Pasang Pintu Type.P.6 ( Besi ) 2.15 x 1.70 m


3.66 m2
Kusen Pintu Type P6
7.31 m2
Cat Besi
1.00 bh
Upah Pasang

Pasang Pintu Type.P.7 ( Aluminium )


6.00 m'
Kusen Aluminium 4"
3.65 m2
Daun Pintu Triplek
7.30 m2
Cat Daun Pintu DUCO
1.00 bh
Konci Pintu ( Setara Dekson )
6.00 bh
Engsel Pintu
12.00 m'
Sealant kusen

Pasang Kusen BV.2 & BV.2'


4.60 m'
Kusen Aluminium 4"
0.77 m2
Kaca 5 mm
8.20 m'
Sealant kusen
10.20 m'
Sealant kaca

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

1.Unit

1.Unit

1.Unit

1.Unit

1.Unit

1.Unit

Pasang Kusen BV.3


9.60 m'
2.13 m2
15.00 m'
23.40 m'

Kusen Aluminium 4"


Kaca 5 mm
Sealant kusen
Sealant kaca

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

Pasang Kusen BV5


5.20 m'
1.08 m2
9.00 m'
11.80 m'

Kusen Aluminium 4"


Kaca 5 mm
Sealant kusen
Sealant kaca

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

Pasang Kusen BV6


3.00 m'
0.56 m2
6.00 m'
6.00 m'

Kusen Aluminium 4"


Kaca 5 mm
Sealant kusen
Sealant kaca

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

Pasang Kusen Jendela Type.J.1 ( Uk.4.625 x 3.5 m)


16.25 m'
Canal U
16.18 m2
Kaca Tempered 12mm
60.50 m'
Sealant kaca Tempered

Pasang Kusen Jendela Type.J.5 (Uk.13.3 x 3.55 m)


m'
Aluminium U
47.22 m2
Kaca Tempered 12mm
6.00 ps
Engsel jendela
6.00 bh
Grendel jendel
m'
Sealant kaca Tempered

Pasang Kusen Jendela Type.J.6 (Uk.13.3 x 3.55 m)


m'
Aluminium U
47.22 m2
Kaca Tempered 12mm
6.00 ps
Engsel jendela
6.00 bh
Grendel jendel

@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

@ Rp.
@ Rp.
@ Rp.
@ Rp.

m'

Sealant kaca Tempered

@ Rp.
Sub total :
Jasa.
Total Harga

1.Unit

Pasang Kusen Jendela Type.J.7 (Uk.13.3 x 3.55 m)


m'
Aluminium U
47.22 m2
Kaca Tempered 12mm
6.00 ps
Engsel jendela
6.00 bh
Grendel jendel
m'
Sealant kaca Tempered

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga

37,500.00
850,000.00
2,500,000.00
571,800.00
1,794,800.00
1,126,900.00
542,600.00
16,500.00

=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

706,500.00
12,495,000.00
5,000,000.00
3,345,030.00
3,589,600.00
2,253,800.00
1,085,200.00
1,155,000.00
29,630,130.00
2,963,013.00
32,593,143.00

110,600.00
87,600.00
727,469.00
39,600.00
396,500.00
40,600.00
40,400.00
27,900.00
104,300.00
6,200.00
5,400.00

=
=
=
=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,714,300.00
648,240.00
1,222,147.92
133,056.00
396,500.00
121,800.00
161,600.00
55,800.00
349,405.00
117,800.00
177,120.00
5,097,768.92
509,776.89
5,607,545.81

110,600.00
87,600.00
727,469.00
39,600.00
396,500.00
40,600.00
40,400.00
27,900.00
104,300.00
6,200.00
5,400.00

=
=
=
=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,266,370.00
324,120.00
1,222,147.92
133,056.00
396,500.00
121,800.00
80,800.00
27,900.00
205,471.00
99,200.00
105,840.00
3,983,204.92
398,320.49
4,381,525.41

110,600.00
727,469.00
39,600.00
396,500.00
40,600.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

1,017,520.00
1,251,246.68
136,224.00
396,500.00
121,800.00

Sub total :
Total Harga

Sub total :
Total Harga

Sub total :
Total Harga

Sub total :
Total Harga

104,300.00 =
6,200.00 =
5,400.00 =
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

78,225.00
101,680.00
48,600.00
3,151,795.68
315,179.57
3,466,975.25

1,112,267.92
1,335,600.00
32,900.00
208,700.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,467,495.24
500,850.00
217,469.00
208,700.00
4,394,514.24
439,451.42
4,833,965.66

1,730,848.69 =
39,600.00 =
187,800.00 =
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,093,457.14
187,308.00
187,800.00
4,468,565.14
446,856.51
4,915,421.66

110,600.00
727,469.00
39,600.00
396,500.00
40,600.00
104,300.00
6,200.00
5,400.00

=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

818,440.00
1,374,916.41
149,688.00
396,500.00
121,800.00
65,709.00
80,600.00
34,560.00
3,042,213.41
304,221.34
3,346,434.75

110,600.00
727,469.00
39,600.00
396,500.00
40,600.00
104,300.00
6,200.00
5,400.00

=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

818,440.00
1,374,916.41
149,688.00
396,500.00
121,800.00
65,709.00
80,600.00
34,560.00
3,042,213.41
304,221.34
3,346,434.75

110,600.00
727,469.00
39,600.00
396,500.00
40,600.00
104,300.00
6,200.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

796,320.00
1,222,147.92
133,056.00
396,500.00
121,800.00
58,408.00
79,360.00

Sub total :
Total Harga

Sub total :
Total Harga

Sub total :
Total Harga

Sub total :
Total Harga

Sub total :
Total Harga

5,400.00 =
=
=
=

Rp
Rp
Rp
Rp

32,400.00
2,839,991.92
283,999.19
3,123,991.11

110,600.00
727,469.00
39,600.00
396,500.00
40,600.00
6,200.00

=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

564,060.00
1,251,246.68
136,224.00
396,500.00
121,800.00
63,240.00
2,533,070.68
253,307.07
2,786,377.75

110,600.00
727,469.00
39,600.00
396,500.00
40,600.00
6,200.00

=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

553,000.00
1,338,542.96
145,728.00
396,500.00
121,800.00
64,480.00
2,620,050.96
262,005.10
2,882,056.06

1,042,139.27 =
32,900.00 =
325,000.00 =
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,809,019.05
240,499.00
325,000.00
4,374,518.05
437,451.80
4,811,969.85

110,600.00
727,469.00
39,600.00
396,500.00
40,600.00
6,200.00

=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

663,600.00
2,655,261.85
289,080.00
396,500.00
243,600.00
74,400.00
4,322,441.85
432,244.19
4,754,686.04

110,600.00
104,300.00
6,200.00
5,400.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

508,760.00
80,311.00
50,840.00
55,080.00
694,991.00
69,499.10
764,490.10

Sub total :
Total Harga

Sub total :
Total Harga

Sub total :
Total Harga

Sub total :
Total Harga

Sub total :
Total Harga

110,600.00
104,300.00
6,200.00
5,400.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,061,760.00
222,159.00
93,000.00
126,360.00
1,503,279.00
150,327.90
1,653,606.90

110,600.00
104,300.00
6,200.00
5,400.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

575,120.00
112,644.00
55,800.00
63,720.00
807,284.00
80,728.40
888,012.40

110,600.00
104,300.00
6,200.00
5,400.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

331,800.00
58,408.00
37,200.00
32,400.00
459,808.00
45,980.80
505,788.80

37,500.00 =
850,000.00 =
16,500.00 =
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

609,375.00
13,753,000.00
998,250.00
15,360,625.00
1,536,062.50
16,896,687.50

37,500.00
850,000.00
110,000.00
27,900.00
16,500.00

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

40,132,750.00
660,000.00
167,400.00
40,960,150.00
4,096,015.00
45,056,165.00

37,500.00
850,000.00
110,000.00
27,900.00

=
=
=
=

Rp
Rp
Rp
Rp

40,132,750.00
660,000.00
167,400.00

Sub total :
Total Harga

Sub total :
Total Harga

Sub total :
Total Harga

Sub total :
Total Harga

Sub total :
Total Harga

Sub total :
Total Harga

16,500.00 =
=
=
=

Rp
Rp
Rp
Rp

40,960,150.00
4,096,015.00
45,056,165.00

37,500.00
850,000.00
91,800.00
27,900.00
16,500.00
Sub total :
Total Harga

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

###

###

40,132,750.00
550,800.00
167,400.00
40,850,950.00
4,085,095.00
44,936,045.00

ANALISA HARGA SATUAN PEKERJAAN

No.

URAIAN

1 M2 PEK. PENGUKURAN KEMBALI (SITE)


Tukang Batu
Pekerja
Peralatan
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PEK. PASANGAN BOUWPLANK
Kayu Kuat Kelas II (Maranti)
Paku 5 - 7 Cm
Ongkos Pasang
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PEK. KANTOR DIREKSI
Kayu Kuat Kelas II (Maranti)
Paku 5 - 7 Cm
Seng Gelombang BJLS 28 (80 x 180 cm)
Triplek 3 mm
PC 50 Kg
Pasir Pasang
Bata Merah
Peralatan
Ongkos Pasang
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PAGAR PENGAMAN PROYEK
Seng Gelombang BJLS 28 (80 x 180 cm)
Kayu Kuat Kelas II (Maranti)

No.

URAIAN

Paku 5 - 7 Cm
Pengecatan Cat Minyak 2x Bag. Luar
Ongkos Pasang
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
5

1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 1 M'


Pekerja
Mandor
Alat bantu
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

No.

URAIAN

1 M3 URUGAN TANAH KEMBALI


Pekerja
Mandor
Alat bantu
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M3 URUGAN PASIR URUG
Pasir Urug
Pekerja
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M3 LANTAI KERJA 1PC : 3PS : 5KRL
Semen PC (@ 50 Kg/Zak)
Split Pecah Mesin 2/3
Pasir Beton
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PASANG STOOT WERK
Kayu Terentang
Paku
Minyak Bekisting
Dolken kayu galam dia 8-10/4m
Pekerja
Tukang Kayu
Kepala Tukang Kayu

No.

URAIAN

Mandor
Jumlah
Dibulatkan
10

1 M3 PASANGAN BATU KOSONG (AANSTAMPING)


Batu Belah 15 Cm/ 20 Cm
Pasir Urug
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

No.

11

12

13

URAIAN

1 M3 PASANGAN BATU BELAH, CAMP. 1 PC : 5 PP


Batu Belah 15 Cm/ 20 Cm
Semen PC (@ 50 Kg/Zak)
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Alat bantu
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PASANGAN BATU TEMPEL ANDHESIT
Batu Andhesit
Semen PC (@ 50 Kg/Zak)
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PASANG KANSTEIN BETON 150x300x600
Kanstein Block 150X300X600 mm
Galian tanah
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Peralatan
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

No.

14

URAIAN

1 M2 DAUN PINTU DOUBLE MEGATEAK RANGKA KAYU KAMPER


Papan Kayu Kuat Kelas II (Kamper)
Megateak 4 mm (ukuran pintu)
Lem Putih (FOX)
Paku Triplek (1 - 2.5 Cm)
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

No.

15

16

17

URAIAN

1 M2 DAUN PINTU MEGATEAK + TRIPLEK LAPIS FORMIKA (KM/WC)


Papan Kayu Kuat Kelas II (Kamper)
Megateak 4 mm (ukuran pintu)
Tripleks 4 mm (ukuran pintu)
Formika
Paku Triplek (1-2.5 Cm)
Lem Putih (FOX)
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 1/2"
Pipa PVC 1/2"
Perlengkapan (25 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 3/4"
Pipa PVC 3/4"
Perlengkapan (25 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

No.

18

URAIAN

1 M' PAS. PIPA PVC TYPE AW 1"


Pipa PVC 1"
Perlengkapan (25 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

No.

19

20

21

22

URAIAN

1 M' PAS. PIPA PVC TYPE AW 1 1/4"


Pipa PVC 1 1/4"
Perlengkapan (25 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 1 1/2"
Pipa PVC 1 1/2"
Perlengkapan (25 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 2"
Pipa PVC 2"
Perlengkapan (25 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 2 1/2"
Pipa PVC AW 2 1/2"
Perlengkapan (25 %)
Pekerja

No.

URAIAN

Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
23

1 M' PAS. PIPA PVC TYPE AW 3"


Pipa PVC AW 3"
Perlengkapan (25 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

No.

24

25

26

27

URAIAN

1 M' PAS. PIPA PVC TYPE AW 4"


Pipa PVC AW 4"
Perlengkapan (25 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 5"
Pipa PVC AW 5"
Perlengkapan (25 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
Saklar Tunggal 10 A, 1 Phasa
Saklar Tunggal 10 A, 1 Phasa
Accessories & Peralatan
Upah Pasang
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
Saklar Ganda 10 A, 1 Phasa
Saklar Ganda 10 A, 1 Phasa
Accessories & Peralatan
Upah Pasang
Jumlah
Keuntungan Max.

No.

URAIAN

Jumlah
Dibulatkan
28

Saklar Hotel Ganda 10 A, 1 Phasa


Saklar Hotel Ganda 10 A, 1 Phasa
Accessories & Peralatan
Upah Pasang
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

No.

29

30

URAIAN

Instalasi Penerangan
Kabel NYM 3Cx2,5 Sqmm
Pipa Konduit dia 20 mm2 (3/4")
Accessories & Peralatan
Upah Pasang
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

Saklar Hotel Tunggal 10 A, 1 Phasa


Saklar Hotel Tunggal 10 A, 1 Phasa
Accessories & Peralatan
Upah Pasang
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

KOEFISIEN

0.01
0.02
0.50
10.00 %

0.01
0.04
0.16
10.00 %

0.10
0.25
1.10
0.50
0.10
0.25
70.00
0.02
0.15
10.00 %

1.20
0.04

SATUAN

HARGA
SATUAN
(Rp.)

JUMLAH
[4 x 6]
(Rp.)

OH
OH
Lot

103,800.00
88,200.00
2,802.00

4,203.00

M3
Kg
Ls

2,750,000.00
15,000.00
28,070.00

32,420.85

M3
Kg
Lbr
Lbr
Zak
M3
Bh
Lot
Ls

2,750,000.00
15,000.00
40,000.00
62,100.00
62,000.00
248,800.00
500.00
457,200.00
466,344.00

536,295.60

Lbr
M3

40,000.00
2,750,000.00

1,038.00
1,764.00
1,401.00
4,203.00
420.30
4,623.30
4,623.00

27,500.00
570.00
4,350.85
32,420.85
3,242.09
35,662.94
35,662.00

275,000.00
3,750.00
44,000.00
31,050.00
6,200.00
62,200.00
35,000.00
9,144.00
69,951.60
536,295.60
53,629.56
589,925.16
589,925.00

48,000.00
99,000.00

KOEFISIEN

0.20
1.80
0.20
10.00 %

0.40
0.04
1.00
10.00 %

SATUAN

HARGA
SATUAN
(Rp.)

JUMLAH
[4 x 6]
(Rp.)

Kg
M2
Ls

15,000.00
18,000.00
182,400.00

218,880.00

OH
OH
ls

88,200.00
135,200.00
5,000.00

45,688.00

3,000.00
32,400.00
36,480.00
218,880.00
21,888.00
240,768.00
240,768.00

35,280.00
5,408.00
5,000.00
45,688.00
4,568.80
50,256.80
50,256.00

KOEFISIEN

0.19
0.02
1.00
10.00 %

1.20
0.30
0.01
10.00 %

4.36
0.87
0.52
1.65
0.25
0.03
0.08
10.00 %

0.02
0.50
0.20
4.00
0.15
0.20
0.20

SATUAN

HARGA
SATUAN
(Rp.)

JUMLAH
[4 x 6]
(Rp.)

OH
OH
ls

88,200.00
135,200.00
5,000.00

24,503.20

M3
OH
OH

190,000.00
88,200.00
135,200.00

255,812.00

Zak
M3
M3
Org
Org
Org
Org

62,000.00
247,500.00
250,100.00
88,200.00
103,800.00
119,600.00
135,200.00

800,983.00

M3
Kg
Lt
Btg
OH
OH
OH

1,550,000.00
15,000.00
33,600.00
21,500.00
88,200.00
103,800.00
119,600.00

16,934.40
2,568.80
5,000.00
24,503.20
2,450.32
26,953.52
26,953.00

228,000.00
26,460.00
1,352.00
255,812.00
25,581.20
281,393.20
281,393.00

270,320.00
215,325.00
130,052.00
145,530.00
25,950.00
2,990.00
10,816.00
800,983.00
80,098.30
881,081.30
881,081.00

24,800.00
7,500.00
6,720.00
86,000.00
13,230.00
20,760.00
23,920.00

KOEFISIEN

SATUAN

HARGA
SATUAN
(Rp.)

JUMLAH
[4 x 6]
(Rp.)

0.02

OH

135,200.00

2,298.40
185,228.40
185,228.00

1.20
0.30
0.78
0.39
0.04
0.04

M3
M3
OH
OH
OH
OH

221,500.00
190,000.00
88,200.00
103,800.00
119,600.00
135,200.00

442,015.20

265,800.00
57,000.00
68,796.00
40,482.00
4,664.40
5,272.80
442,015.20
44,201.52
486,216.72
486,216.00

10.00 %

KOEFISIEN

1.10
2.72
0.54
1.50
0.60
0.06
0.08
1.00
10.00 %

1.10
0.12
0.03
0.19
0.23
0.04
0.03
10.00 %

1.70
0.03
0.11
0.02
0.01
0.00
0.40
10.00 %

SATUAN

HARGA
SATUAN
(Rp.)

JUMLAH
[4 x 6]
(Rp.)

M3
Zak
M3
OH
OH
OH
OH
ls

221,500.00
62,000.00
248,800.00
88,200.00
103,800.00
119,600.00
135,200.00
50,000.00

809,533.20

M2
Zak
M3
OH
OH
OH
OH

140,000.00
62,000.00
248,800.00
88,200.00
103,800.00
119,600.00
135,200.00

218,100.06

bh
m
OH
OH
OH
OH
ls

14,000.00
45,688.00
88,200.00
103,800.00
119,600.00
135,200.00
5,000.00

40,861.84

243,650.00
168,640.00
135,347.20
132,300.00
62,280.00
7,176.00
10,140.00
50,000.00
809,533.20
80,953.32
890,486.52
890,486.00

154,000.00
7,440.00
7,712.80
16,537.50
23,355.00
4,485.00
4,569.76
218,100.06
21,810.01
239,910.07
239,910.00

23,800.00
1,370.64
9,702.00
2,283.60
1,435.20
270.40
2,000.00
40,861.84
4,086.18
44,948.02
44,948.00

KOEFISIEN

0.02
2.00
0.30
0.03
0.60
2.00
0.20
0.03
10.00 %

SATUAN

HARGA
SATUAN
(Rp.)

M3
Lbr
Kg
Kg
OH
OH
OH
OH

5,600,000.00
98,000.00
20,000.00
18,000.00
88,200.00
103,800.00
119,600.00
135,200.00

600,796.00

JUMLAH
[4 x 6]
(Rp.)

109,760.00
196,000.00
6,000.00
540.00
52,920.00
207,600.00
23,920.00
4,056.00
600,796.00
60,079.60
660,875.60
660,875.00

KOEFISIEN

0.02
1.00
1.00
1.00
0.06
0.50
0.60
2.00
0.20
0.03
10.00 %

1.10
1.00
0.04
0.06
0.01
0.00
10.00 %

1.10
1.00
0.04
0.06
0.01
0.00
10.00 %

SATUAN

HARGA
SATUAN
(Rp.)

JUMLAH
[4 x 6]
(Rp.)

M3
Lbr
Lbr
Lbr
Kg
Kg
OH
OH
OH
OH

5,600,000.00
98,000.00
64,000.00
90,000.00
18,000.00
20,000.00
88,200.00
103,800.00
119,600.00
135,200.00

661,336.00

M'
Set
Org
Org
Org
Org

8,500.00
2,125.00
88,200.00
103,800.00
119,600.00
135,200.00

21,839.16

M'
Set
Org
Org
Org
Org

10,000.00
2,500.00
88,200.00
103,800.00
119,600.00
135,200.00

23,864.16

109,760.00
98,000.00
64,000.00
90,000.00
1,080.00
10,000.00
52,920.00
207,600.00
23,920.00
4,056.00
661,336.00
66,133.60
727,469.60
727,469.00

9,350.00
2,125.00
3,175.20
6,228.00
717.60
243.36
21,839.16
2,183.92
24,023.08
24,023.00

11,000.00
2,500.00
3,175.20
6,228.00
717.60
243.36
23,864.16
2,386.42
26,250.58
26,250.00

KOEFISIEN

1.10
1.00
0.04
0.06
0.01
0.00
10.00 %

SATUAN

HARGA
SATUAN
(Rp.)

JUMLAH
[4 x 6]
(Rp.)

M'
Set
Org
Org
Org
Org

12,000.00
3,000.00
88,200.00
103,800.00
119,600.00
135,200.00

26,564.16

13,200.00
3,000.00
3,175.20
6,228.00
717.60
243.36
26,564.16
2,656.42
29,220.58
29,220.00

KOEFISIEN

1.10
1.00
0.04
0.06
0.01
0.00
10.00 %

1.10
1.00
0.04
0.06
0.01
0.00
10.00 %

1.10
1.00
0.04
0.06
0.01
0.00
10.00 %

1.10
1.00
0.04

SATUAN

HARGA
SATUAN
(Rp.)

JUMLAH
[4 x 6]
(Rp.)

M'
Set
Org
Org
Org
Org

14,000.00
3,500.00
88,200.00
103,800.00
119,600.00
135,200.00

29,264.16

M'
Set
Org
Org
Org
Org

16,500.00
4,125.00
88,200.00
103,800.00
119,600.00
135,200.00

32,639.16

M'
Set
Org
Org
Org
Org

23,000.00
5,750.00
88,200.00
103,800.00
119,600.00
135,200.00

41,414.16

M'
Set
Org

30,000.00
7,500.00
88,200.00

15,400.00
3,500.00
3,175.20
6,228.00
717.60
243.36
29,264.16
2,926.42
32,190.58
32,190.00

18,150.00
4,125.00
3,175.20
6,228.00
717.60
243.36
32,639.16
3,263.92
35,903.08
35,903.00
25,300.00
5,750.00
3,175.20
6,228.00
717.60
243.36
41,414.16
4,141.42
45,555.58
45,555.00

33,000.00
7,500.00
3,175.20

KOEFISIEN

0.06
0.01
0.00
10.00 %

1.10
1.00
0.04
0.06
0.01
0.00
10.00 %

SATUAN

HARGA
SATUAN
(Rp.)

JUMLAH
[4 x 6]
(Rp.)

Org
Org
Org

103,800.00
119,600.00
135,200.00

50,864.16

M'
Set
Org
Org
Org
Org

40,000.00
10,000.00
88,200.00
103,800.00
119,600.00
135,200.00

64,364.16

6,228.00
717.60
243.36
50,864.16
5,086.42
55,950.58
55,950.00

44,000.00
10,000.00
3,175.20
6,228.00
717.60
243.36
64,364.16
6,436.42
70,800.58
70,800.00

KOEFISIEN

1.10
1.00
0.04
0.06
0.01
0.00
10.00 %

1.10
1.00
0.04
0.06
0.01
0.00
10.00 %

1.00
1.00
1.00
10.00 %

1.00
1.00
1.00
10.00 %

SATUAN

HARGA
SATUAN
(Rp.)

JUMLAH
[4 x 6]
(Rp.)

M'
Set
Org
Org
Org
Org

50,000.00
12,500.00
88,200.00
103,800.00
119,600.00
135,200.00

77,864.16

M'
Set
Org
Org
Org
Org

70,000.00
17,500.00
88,200.00
103,800.00
119,600.00
135,200.00

104,864.16

bh
ls
ls
x

bh
ls
ls
x

20,000.00
2,000.00
5,000.00
27,000.00

30,000.00
2,000.00
5,000.00
37,000.00

55,000.00
12,500.00
3,175.20
6,228.00
717.60
243.36
77,864.16
7,786.42
85,650.58
85,650.00

77,000.00
17,500.00
3,175.20
6,228.00
717.60
243.36
104,864.16
10,486.42
115,350.58
115,350.00

20,000.00
2,000.00
5,000.00
27,000.00
2,700.00
29,700.00
29,700.00

30,000.00
2,000.00
5,000.00
37,000.00
3,700.00

KOEFISIEN

SATUAN

HARGA
SATUAN
(Rp.)

JUMLAH
[4 x 6]
(Rp.)
40,700.00
40,700.00

1.00
1.00
1.00
10.00 %

bh
ls
ls
x

40,000.00
2,000.00
5,000.00
47,000.00

40,000.00
2,000.00
5,000.00
47,000.00
4,700.00
51,700.00
51,700.00

KOEFISIEN

15.00
15.00
1.00
1.00
10.00 %

1.00
1.00
1.00
10.00 %

SATUAN

HARGA
SATUAN
(Rp.)

m'
m'
ls
ls
x

JUMLAH
[4 x 6]
(Rp.)

11,000.00
2,200.00
5,000.00
30,000.00
233,000.00

bh
ls
ls

22,000.00
2,000.00
12,500.00

36,500.00

Jakarta, 30 Nopember 2012


PT. Nugraha Adi Taruna

Ir. G.T. Yudi Rahman


Direktur Utama

165,000.00
33,000.00
5,000.00
30,000.00
233,000.00
23,300.00
256,300.00
256,300.00

22,000.00
2,000.00
12,500.00
36,500.00
3,650.00
40,150.00
40,150.00

ANALISA HARGA SATUAN


KODE
No.
1
A.

URAIAN

ANALISA
2
3
PEKERJAAN KUSEN ALUMINIUM
106
KC-1
1 M2 PAS. KACA RAYBAND 5 MM
a.
Kaca Rayband 5 mm
b.
Pekerja
c.
Tukang Kayu
Jumlah
Dibulatkan
107

KC-2
a.
b.
c.

1 M2 PAS. KACA RAYBAND 8 MM


Kaca Rayband 8 mm
Pekerja
Tukang Kayu
Jumlah
Dibulatkan

108

KC-3
a.
b.
c.

1 M2 PAS. KACA POLOS 5 MM


Kaca Polos 5 mm
Pekerja
Tukang Kayu
Jumlah
Dibulatkan

109

KC-4
a.
b.
c.

1 M2 PAS. KACA POLOS 8 MM


Kaca Polos 8 mm
Pekerja
Tukang Kayu
Jumlah
Dibulatkan

110

KC-5
a.
b.
c.

1 M2 PAS. KACA POLOS 10 MM


Kaca Polos 10 mm
Pekerja
Tukang Kayu
Jumlah
Dibulatkan

111

KC-5
a.
b.
c.

1 M2 PAS. KACA TEMPERED 12 MM


Kaca Tempered 12 mm
Pekerja
Tukang Kayu
Jumlah
Dibulatkan

112

KS-1

1 BH KUSEN PINTU & JENDELA PJ1

2
a.
b.
c.
d.
e.

113

KS-2
a.
b.
c.
d.
e.

3
Kusen Aluminium Atas & Antara 6"
Kusen Aluminium Bawah 4"
Kaca Tempered t. 12 mm
Over Panel Pivot Patch, Top Patch, Boottom Patch, Bottom
Patch, Bottom Lock, Floor Hing & Hendle Stainless
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN PINTU & JENDELA PJ2
Kusen Aluminium Atas & Antara 6"
Kusen Aluminium Bawah 4"
Kaca Tempered t. 12 mm
Over Panel Pivot Patch, Top Patch, Boottom Patch, Bottom
Patch, Bottom Lock, Floor Hing & Hendle Stainless
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

2
114

KS-3
a.
b.
c.
d.

3
1 BH KUSEN PINTU PD1A
Kusen Aluminium Atas & Antara 6"
Kaca Tempered t. 12 mm
Over Panel Pivot Patch, Top Patch, Boottom Patch, Bottom
Patch, Bottom Lock, Floor Hing & Hendle Stainless
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

115

KS-4
a.
b.
c.
d.
e.
f.
g.
h.
I.
j.

1 BH KUSEN TYPE PD1 (ALUMINIUM)


Kusen Aluminium 1 1/2 x 3" Warna
Kaca Rayban 5 mm
Karet
Sealant
Daun Pintu Aluminium
Engsel Pintu
Kunci Pintu (Patch lock + cylinder)
Grendel Pintu Alumunium
Tarikan (Handle) Alumunium
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

116

KS-5
a.
b.
c.

1 BH KUSEN TYPE PD2


Kusen Aluminium 1 1/2 x 3" Warna
Sealant
Daun Double Megateak
Kayu Kuat Kelas II (Kamper)
Engsel Pintu
Kunci Pintu 2 Putaran
Grendel Pintu kayu
Melamic Daun Pintu
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

d.
e.
f.
g.
h.

117

KS-6
a.
b.
c.
d.
e.

1 BH KUSEN TYPE P1
Kusen Aluminium 1 1/2 x 3" Warna
Sealant
Daun Double Megateak
Kayu Kuat Kelas II (Kamper)
Engsel Pintu
Kunci Pintu 2 Putaran

2
f.
g.

118

KS-7
a.
b.
c.
d.
e.
f.
g.

3
Melamic Daun Pintu
Upah Pasang
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

1 BH KUSEN TYPE P2
Kusen Aluminium 1 1/2 x 3" Warna
Sealant
Daun Megateak + Formica
Kayu Kuat Kelas II (Kamper)
Engsel Pintu
Kunci Pintu KM Bulat
Melamic Daun Pintu
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

2
119

KS-8
a.
b.
c.
d.
e.
f.
g.

3
1 BH KUSEN TYPE P3
Kusen Aluminium 1 1/2 x 3" Warna
Sealant
Daun Double Megateak
Kayu Kuat Kelas II (Kamper)
Engsel Pintu
Kunci Pintu KM Bulat
Melamic Daun Pintu
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

120

KS-9
a.
c.
d.
e.
f.
g.

1 BH KUSEN TYPE PB1


Kusen Plat Besi Tekuk t. 2mm
Daun Pintu Plat Besi Tekuk t. 2mm
Engsel Pintu Besi
Kunci Tanam
Pengecatan dengan Cat Besi
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

121

KS-10
a.
b.
c.

1 BH KUSEN TYPE PS1


Kusen Aluminium 1 1/2 x 3" Warna
Sealant
Daun Double Megateak
Kayu Kuat Kelas II (Kamper)
Engsel Pintu
Kunci Pintu KM Bulat
Melamic Daun Pintu
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

d.
e.
f.
g.

122

KS-11
a.
b.
c.
d.
e.
f.
g.

1 BH KUSEN TYPE PS2


Kusen Aluminium 1 1/2 x 3" Warna
Sealant
Daun Double Megateak
Kayu Kuat Kelas II (Kamper)
Engsel Pintu
Kunci Pintu KM Bulat
Melamic Daun Pintu
Upah Pasang

123

KS-12
a.
b.
c.
d.

3
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

1 BH KUSEN JENDELA J1
Kusen Aluminium Atas & Antara 6"
Kusen Aluminium Bawah 4"
Kaca Tempered t. 12 mm
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

124

KS-13
a.
b.
c.
d.

1 BH KUSEN JENDELA J1A


Kusen Aluminium Atas & Antara 6"
Kusen Aluminium Bawah 4"
Kaca Tempered t. 12 mm
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

125

KS-14
a.
b.
c.
d.
e.
f.
g.
h.

1 BH KUSEN JENDELA J2
Kusen Aluminium 1 1/2 x 3" Warna
Kaca Polos 5 mm
Karet
Sealant
Daun Jendela Aluminium
Engsel Casemet 16"
Rambuncis
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

126

KS-15
a.
b.
c.
d.
e.
f.
g.
h.

1 BH KUSEN JENDELA J3
Kusen Aluminium 1 1/2 x 3" Warna
Kaca Polos 5 mm
Karet
Sealant
Daun Jendela Aluminium
Engsel Casemet 16"
Rambuncis
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

127

KS-16
a.
b.
c.
d.
e.
f.
g.
h.

1 BH KUSEN JENDELA J4
Kusen Aluminium 1 1/2 x 3" Warna
Kaca Polos 5 mm
Karet
Sealant
Daun Jendela Aluminium
Engsel Casemet 16"
Rambuncis
Upah Pasang
Jumlah
Keuntungan Max.
=

3
Jumlah
Dibulatkan

128

KS-17
a.
b.
c.
d.

1 BH KUSEN J5
Kusen Aluminium Atas & Bawah 3"
Kaca Tempered t. 12 mm
Kusen Aluminium Tengah/Tegak 6"
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

129

KS-18
a.
b.
c.
d.

1 BH KUSEN J6
Kusen Aluminium Atas & Bawah 3"
Kaca Tempered t. 12 mm
Kusen Aluminium Tengah/Tegak 6"
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

130

KS-19
a.
b.
c.
d.
e.
f.
g.
h.

1 BH KUSEN JENDELA J7
Kusen Aluminium 1 1/2 x 3" Warna
Kaca Polos 5 mm
Karet
Sealant
Daun Jendela Aluminium
Engsel Casemet 16"
Rambuncis
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

131

KS-20
a.
b.
c.
d.
e.

1 BH KUSEN JENDELA J8
Kusen Aluminium 1 1/2 x 3" Warna
Kaca Polos 5 mm
Karet
Sealant
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

132

KS-21
a.

1 BH KUSEN JENDELA J9
Kusen Aluminium 1 1/2 x 3" Warna

2
b.
c.
d.
e.

3
Kaca Polos 8 mm
Karet
Sealant
Upah Pasang
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

133

KS-22
a.
b.
c.
d.
e.

1 BH KUSEN JENDELA B1
Kusen Aluminium 1 1/2 x 3" Warna
Kaca Polos 5 mm
Karet
Sealant
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

134

KS-23
a.
b.
c.
d.
e.

1 BH KUSEN JENDELA B2
Kusen Aluminium 1 1/2 x 3" Warna
Kaca Polos 5 mm
Karet
Sealant
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

135

PTS
a.
b.
c.
d.
e.

1 M2 DINDING PARTISI
Panel Double Gypsum t. 9 mm
Rangka Pipa Hollow 40X40
Rangka Pipa Hollow 40X20
Upah Pasang dan Alat Bantu
Pengecatan dengan cat tembok
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

136

RAILL-1
a.
b.
d.
e.
f.

1 M' RAILLING TANGGA PIPA STAINLESS


Pipa Stainless diameter 2"
Pipa Stainless diameter 1"
Pabrikasi & Pengelasan
Alat Bantu
Ongkos pasang & penghalusan
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

137

RAILL-2
a.
b.
c.
d.
e.

1 M' HAND RAILLING PADA DINDING PIPA STAINLESS


Pipa Stainless diameter 2"
Pipa Stainless diameter 1"
Peralatan dudukan tiang
Alat Bantu
Ongkos pasang & penghalusan
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan

KOEFISIEN

SATUAN

HARGA
SATUAN
(Rp.)
6

JUMLAH
[4 x 6]
(Rp.)
7

1.05
0.02
0.15

M2
Org
Org

85,000.00
88,200.00
103,800.00

89,250.00
1,323.00
15,570.00
106,143.00
106,143.00

1.05
0.02
0.15

M2
Org
Org

180,000.00
88,200.00
103,800.00

189,000.00
1,323.00
15,570.00
205,893.00
205,893.00

1.05
0.02
0.15

M2
Org
Org

75,000.00
88,200.00
103,800.00

78,750.00
1,323.00
15,570.00
95,643.00
95,643.00

1.05
0.02
0.15

M2
Org
Org

120,000.00
88,200.00
103,800.00

126,000.00
1,323.00
15,570.00
142,893.00
142,893.00

1.05
0.02
0.15

M2
Org
Org

145,000.00
88,200.00
103,800.00

152,250.00
1,323.00
15,570.00
169,143.00
169,143.00

1.05
0.02
0.15

M2
Org
Org

850,000.00
88,200.00
103,800.00

892,500.00
1,323.00
15,570.00
909,393.00
909,393.00

4
45.70
18.05
71.98
6.00

5
M'
M'
M2
Set

6
150,000.00
110,000.00
909,393.00
1,500,000.00

0.02

Lot

74,296,334.66

10.00

7
6,855,000.00
1,985,500.00
65,455,834.66
9,000,000.00

84,782,261.35

1,485,926.69
84,782,261.35
8,478,226.14
93,260,487.49
93,260,487.00

7.20
2.00
11.34
2.00

M'
M'
M2
Set

150,000.00
110,000.00
909,393.00
1,500,000.00

1,080,000.00
220,000.00
10,312,516.62
3,000,000.00

0.02

Lot

11,612,516.62

232,250.33
14,844,766.95
1,484,476.70
16,329,243.65
16,329,243.00

10.00

14,844,766.95

9.60
15.12
6.00

M'
M2
Set

150,000.00
909,393.00
1,500,000.00

1,440,000.00
13,750,022.16
9,000,000.00

0.02

Lot

15,190,022.16

303,800.44
24,493,822.60
2,449,382.26
26,943,204.86
26,943,204.00

10.00

21.09
2.53
10.60
12.00
11.60
6.00
1.00
2.00
2.00
0.10
10.00

M'
M2
M'
M'
M'
Ps
Unit
Ps
Ps
Lot
%

24,493,822.60

105,000.00
106,143.00
3,000.00
7,500.00
85,000.00
15,000.00
200,000.00
125,000.00
350,000.00
4,830,791.79
x

5,313,870.97

2,214,450.00
268,541.79
31,800.00
90,000.00
986,000.00
90,000.00
200,000.00
250,000.00
700,000.00
483,079.18
5,313,870.97
531,387.10
5,845,258.07
5,845,258.00

5.60
11.20
2.52

M'
M'
M2

105,000.00
7,500.00
506,000.00

588,000.00
84,000.00
1,275,120.00

6.00
1.00
2.00
5.04
0.10

Ps
Unit
Ps
M2
Lot

15,000.00
200,000.00
30,000.00
80,000.00
2,297,120.00

90,000.00
200,000.00
60,000.00
403,200.00
229,712.00
2,930,032.00
293,003.20
3,223,035.20
3,223,035.00

10.00

2,930,032.00

5.20
10.40
1.68

M'
M'
M2

105,000.00
7,500.00
506,000.00

546,000.00
78,000.00
850,080.00

3.00
1.00

Ps
Unit

15,000.00
200,000.00

45,000.00
200,000.00

5
M2
Lot

3.36
0.10
10.00

6
80,000.00
1,987,880.00
x

2,186,668.00

7
268,800.00
198,788.00
2,186,668.00
218,666.80
2,405,334.80
2,405,334.00

5.10
10.20
1.47

M'
M'
M2

105,000.00
7,500.00
506,000.00

535,500.00
76,500.00
743,820.00

3.00
1.00
1.47
0.05

Ps
Unit
M2
Lot

15,000.00
40,000.00
80,000.00
1,558,420.00

45,000.00
40,000.00
117,600.00
77,921.00
1,636,341.00
163,634.10
1,799,975.10
1,799,975.00

10.00

1,636,341.00

5.10
10.20
1.47

M'
M'
M2

105,000.00
7,500.00
250,000.00

535,500.00
76,500.00
367,500.00

3.00
1.00
2.94
0.05

Ps
Unit
M2
Lot

15,000.00
200,000.00
80,000.00
1,459,700.00

45,000.00
200,000.00
235,200.00
72,985.00
1,532,685.00
153,268.50
1,685,953.50
1,685,953.00

10.00

1.00
1.00
3.00
1.00
4.40
0.05
10.00

Unit
Unit
Ps
Unit
M2
Lot
%

1,532,685.00

750,000.00
1,500,000.00
25,000.00
200,000.00
45,000.00
2,723,000.00
x

2,859,150.00

750,000.00
1,500,000.00
75,000.00
200,000.00
198,000.00
136,150.00
2,859,150.00
285,915.00
3,145,065.00
3,145,065.00

4.70
9.40
1.13

M'
M'
M2

105,000.00
7,500.00
250,000.00

493,500.00
70,500.00
282,500.00

2.00
1.00
2.26
0.05

Ps
Unit
M2
Lot

15,000.00
200,000.00
80,000.00
1,257,300.00

30,000.00
200,000.00
180,800.00
62,865.00
1,320,165.00
132,016.50
1,452,181.50
1,452,181.00

10.00

1,320,165.00

3.90
7.80
0.62

M'
M'
M2

105,000.00
7,500.00
250,000.00

409,500.00
58,500.00
155,000.00

2.00
1.00
1.24
0.05

Ps
Unit
M2
Lot

15,000.00
200,000.00
80,000.00
952,200.00

30,000.00
200,000.00
99,200.00
47,610.00

5
10.00

15.60
7.80
33.54
0.02
10.00

6
x

M'
M'
M2
Lot
%

999,810.00

150,000.00
110,000.00
909,393.00
33,699,041.22
x

34,373,022.04

7
999,810.00
99,981.00
1,099,791.00
1,099,791.00

2,340,000.00
858,000.00
30,501,041.22
673,980.82
34,373,022.04
3,437,302.20
37,810,324.25
37,810,324.00

14.60
7.30
31.39
0.02
10.00

M'
M'
M2
Lot
%

17.80
5.30
23.90
19.80
16.20
4.00
4.00
0.05
10.00

5,094,713.30

150,000.00
95,643.00
3,000.00
7,500.00
75,000.00
45,000.00
15,000.00
2,404,243.20
x

M'
M2
M'
M'
M'
Ps
Bh
Lot
%

32,169,623.20

150,000.00
95,643.00
3,000.00
7,500.00
75,000.00
45,000.00
15,000.00
4,852,107.90

M'
M2
M'
M'
M'
Ps
Bh
Lot

23.60
7.60
33.00
23.60
7.80
2.00
2.00
0.05
10.00

150,000.00
110,000.00
909,393.00
31,538,846.27

M'
M2
M'
M'
M'
Ps
Bh
Lot

9.20
2.40
10.90
13.60
7.20
2.00
2.00
0.05
10.00

2,524,455.36

150,000.00
95,643.00
3,000.00
7,500.00
75,000.00
45,000.00
15,000.00
5,247,886.80
x

5,510,281.14

2,190,000.00
803,000.00
28,545,846.27
630,776.93
32,169,623.20
3,216,962.32
35,386,585.51
35,386,585.00

2,670,000.00
506,907.90
71,700.00
148,500.00
1,215,000.00
180,000.00
60,000.00
242,605.40
5,094,713.30
509,471.33
5,604,184.62
5,604,184.00

1,380,000.00
229,543.20
32,700.00
102,000.00
540,000.00
90,000.00
30,000.00
120,212.16
2,524,455.36
252,445.54
2,776,900.90
2,776,900.00

3,540,000.00
726,886.80
99,000.00
177,000.00
585,000.00
90,000.00
30,000.00
262,394.34
5,510,281.14
551,028.11

7
6,061,309.25
6,061,309.00

24.20
43.56
24.20
0.02
10.00

M'
M2
M'
Lot
%

22.00
39.60
22.00
0.02
10.00

17.20

M'
M2
M'
M'
Lot

8,043,913.24

150,000.00
95,643.00
3,000.00
7,500.00
4,852,107.90
x

M'

43,398,202.06

150,000.00
95,643.00
3,000.00
7,500.00
75,000.00
45,000.00
15,000.00
7,660,869.75
x

47,738,022.26

150,000.00
909,393.00
150,000.00
39,311,962.80

M'
M2
M'
M'
M'
Ps
Bh
Lot

3.60
0.72
3.40
7.20
0.05
10.00

M'
M2
M'
Lot

33.80
13.25
50.20
32.40
10.80
2.00
2.00
0.05
10.00

150,000.00
909,393.00
150,000.00
43,243,159.08

915,668.36

150,000.00

3,630,000.00
39,613,159.08
3,630,000.00
864,863.18
47,738,022.26
4,773,802.23
52,511,824.49
52,511,824.00

3,300,000.00
36,011,962.80
3,300,000.00
786,239.26
43,398,202.06
4,339,820.21
47,738,022.26
47,738,022.00

5,070,000.00
1,267,269.75
150,600.00
243,000.00
810,000.00
90,000.00
30,000.00
383,043.49
8,043,913.24
804,391.32
8,848,304.56
8,848,304.00

540,000.00
68,862.96
10,200.00
54,000.00
242,605.40
915,668.36
91,566.84
1,007,235.19
1,007,235.00

2,580,000.00

5
M2
M'
M'
Lot

12.24
17.20
34.40
0.05
10.00

3.80
0.66
2.10
3.80
0.05
10.00

703,315.60

150,000.00
95,643.00
3,000.00
8,000.00
1,436,041.66
x

M2
M2
M'
M'
M2
M2
%

4,888,600.84

150,000.00
95,643.00
3,000.00
8,000.00
669,824.38

M'
M2
M'
M'
Lot

1.00
2.00
1.00
1.50
1.00
2.00
10.00

M'
M2
M'
M'
Lot

7.70
1.62
4.70
14.00
0.05
10.00

6
142,893.00
3,000.00
8,000.00
4,655,810.32

1,507,843.74

24,400.00
8,000.00
6,000.00
5,000.00
20,066.86
x

110,933.72

7
1,749,010.32
51,600.00
275,200.00
232,790.52
4,888,600.84
488,860.08
5,377,460.92
5,377,460.00

570,000.00
63,124.38
6,300.00
30,400.00
33,491.22
703,315.60
70,331.56
773,647.16
773,647.00

1,155,000.00
154,941.66
14,100.00
112,000.00
71,802.08
1,507,843.74
150,784.37
1,658,628.12
1,658,628.00

48,800.00
8,000.00
9,000.00
5,000.00
40,133.72
110,933.72
11,093.37
122,027.09
122,027.00

2.00
4.00
1.00
1.00
0.10
10.00

M'
M'
Lot
M'
Lot
%

1.00
0.20
2.00
0.15
0.05
10.00

110,000.00
80,000.00
75,000.00
20,000.00
615,000.00
x

M'
M'
Bh
M2
Lot
%

696,500.00

110,000.00
80,000.00
20,000.00
10,000.00
166,000.00
x

175,800.00

Jakarta, 30 Nopember 2012


PT. Nugraha Adi Taruna

Ir. G.T. Yudi Rahman


Direktur Utama

220,000.00
320,000.00
75,000.00
20,000.00
61,500.00
696,500.00
69,650.00
766,150.00
766,150.00

110,000.00
16,000.00
40,000.00
1,500.00
8,300.00
175,800.00
17,580.00
193,380.00
193,380.00

DAFTAR H
No.

JENIS

I.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

U PAH
PEKERJA
TUKANG GALI
TUKANG BATU
KEPALA TUKANG BATU
TUKANG KAYU
KEPALA TUKANG KAYU
TUKANG CAT/PLITUR
KEPALA TUKANG CAT/PLITUR
TUKANG BESI BETON
KEPALA TUKANG BESI BETON
TUKANG BESI PROFIL
KEPALA TUKANG BESI PROFIL
PEMBANTU OPERATOR
OPERATOR TERLATIH
SUPIR TERAMPIL
PEMBANTU SUPIR
MAN D O R

II.
A.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

BAHAN
BAHAN AGREGAT KASAR, BAHAN PEREKAT & BAHA
PASIR URUG
PASIR PASANG
PASIR BETON
BATU PECAH 1-2 CM
BATU PECAH MESIN 2/3
BATU PECAH MESIN 3/5
BATU PECAH 5-7 CM
BATU BELAH UNTUK PONDASI
BATU ANDESIT
BATU TEMPEL HITAM
BATA MERAH BAKAR KEAS I
BATA MERAH BAKAR KELAS II
BATA CONBLOCK 40x20x10 CM
BATA RINGAN RINGAN T. 10 CM
BATA RINGAN RINGAN T. 6 CM
MURTAR UTAMA MU.380 ( PASANGAN )

No.

JENIS

17
18
19
20
21
22
22
23
24
25
26
27
28
29
30
31

MURTAR UTAMA MU.301 (PLESTERAN )


MURTAR UTAMA MU.350 ( ACIAN )
MURTAR UTAMA MU.200 ( ACIAN )
GROUTING NAD MU 408
SEMEN PC (TIGA RODA - 50 KG/ZAK)
SEMEN PC (TIGA RODA - 50 KG/ZAK)
SEMEN WARNA (DUA GUNUNG)
SEMEN WARNA (MITZUBISHI)
BETON READY MIX K-175
BETON READY MIX K-225
BETON READY MIX K-250
BETON READY MIX K-275
BETON READY MIX K-300
BETON READY MIX K-325
BETON READY MIX K-350
BETON TIANG PANCANG DIA.40 CM

B.
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53

BAHAN FINISHING : LABURAN, PENGISI DAN ALATNY


ALKALI (CAT DASAR ICI)
PLAMIR TEMBOK (SANLEX)
CAT TEMBOK (VINILEX)
CAT TEMBOK (PENTALITE/DULUX)
CAT TEMBOK (ICI)
ROL CAT TEMBOK
KAPE TEMBOK
KAPE KAYU
ML 131 CLEAR DANAGLOS
KWAS 3"
KWAS 4"
OKER (MATAHARI)
OYAN
OTEM (PEWARNA PLITUR)
SPIRTUS
SODA API
BAHAN PLITUR KRIPIK (SIRLAK INDIA)
DEMPUL LILIN
DEMPUL PLITUR
DEMPUL HALUS.IMPRA (WOOD FILLER)
TERPENTIN
TINNER B

No.

JENIS

54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72

KUMPON
MELAMIN SENDING SILLER MSS 123
AMPELAS DUCO
VERNIS (COPAL)
PLITUR JADI (KEMUDI)
DEMPUL KAYU
MENI KAYU/BESI (GENTONG)
CAT KAYU (AVIAN)
CAT KAYU (DECOLUX)
CAT BESI (AVIAN)
CAT BESI (DECOLUX)
FLINGCOAT (GENTONG)
MINYAK BAKAR SOLAR
MINYAK BAKAR PREMIUM
MINYAK TANAH
MINYAK PELUMAS
INJUK
WATER PROOFING (NO DROP)
WATER PROOFING (AQUA PROF)

C.
73
74
75
76
77
78
79
80
81
82
83
84
85

BAHAN KAYU BERIKUT BAHAN JADINYA


KAYU LOKAL/RAWA (ALBASIAH)
KAYU BALOK MARANTI
KAYU PAPAN MARANTI
KAYU BALOK MAHONI
KAYU PAPAN MAHONI
KAYU TERENTANG
KAYU BALOK BORNEO SUPER
KAYU PAPAN BORNEO SUPER
KAYU BALOK KAMPER BANJAR
KAYU PAPAN KAMPER BANJAR
KAYU BALOK KAMPER OVEN
KAYU PAPAN KAMPER OVEN
KAYU DOLKEN 5 - 7 CM

86
87
88
89
90

KAYU DOLKEN 8 - 10 CM
KUSEN KAYU KAMPER FINISH MELAMIC 6x4 CM
PLINT MULTIPLEKS LAPIS MEGATEAK FINISH MELAM
LIST MULTIPLEKS LAPIS MEGATEAK FINISH MELAMIC
LIST MULTIPLEKS LAPIS MEGATEAK FINISH MELAMIC

No.

JENIS

91
92

LIST KAYU KAMPER DIPROFIL FINISH MELAMIC 1/4 CM


WALLPAPER TERPASANG

D.
93
94
95
96
97
98
99
100
101
102

BAHAN KAYU LAPIS


TRIPLEK 3 MM (120 x 240 CM)
TRIPLEK 4 MM (120 x 240 CM)
TRIPLEK 4 MM (UKURAN PINTU)
TRIPLEK 6 MM (120 x 240 CM)
TRIPLEK 9 MM (120 x 240 CM)
MULTIPLEK 9 MM (120 x 240 CM)
MEGATEAK 4 MM (120 x 240 CM)
MEGATEAK 4 MM (UKURAN PINTU)
MELAMIN 4 MM (120 x 240 CM)
FORMICA (UKURAN PINTU)

E.
103
104
105
106
107
108

BAHAN PENUTUP RANGKA PLAFOND


BAHAN PLAFON GRC PLAT 4 MM
GYPSUM 120x240 CM, EX DN
GYPTILE JAYABOARD 120x60 CM, T. 9 MM
LIST GIFSUM MOTIF LURUS/MINIMALIS - 8 CM (TERPA
DROP CEILING MOTIF SINGLE (TERPASANG)
Cornise Gypsum

F.
109
110
111
112
113
114
115
116
117

BAHAN LANTAI DAN PELAPIS DINDING


KERAMIK 20/20 KW 1 ANTI SLIP (KM/WC) (ROMAN)
KERAMIK 20/25 KW 1 (KM/WC) (ROMAN) DINDING
KERAMIK 30/30 KW 1 (ROMAN)
KERAMIK 40/40 KW 1 (ROMAN)
HOMOGEUNIOUS TILE 60/60 STANDAR
PLINT KERAMIK 10/30
PLINT HOMOGEUNIOU 10/60
STEP NOZING TANGGA 10/40
LIST / BORDER KERAMIK 8/25

No.

JENIS

G.
118
119
120
121
122
123
124
125
126
127
128
129
130
131

BAHAN SALURAN AIR KOTOR/BERSIH


GRAVEL U 30 CM
PIPA PVC 1/2" AW (Wavin)
PIPA PVC 3/4" AW (Wavin)
PIPA PVC 1" AW (Wavin)
PIPA PVC 1 1/4" AW (Wavin)
PIPA PVC 1 1/2" AW (Wavin)
PIPA PVC 2" AW (Wavin)
PIPA PVC 2 1/2" AW (Wavin)
PIPA PVC 3" AW (Wavin)
PIPA PVC 4" AW (Wavin)
PIPA PVC 5" AW (Wavin)
LEM PARALON
LEM PUTIH (FOX)
LEM KUNING (AICA/AIBON)

G.
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154

BAHAN LOGAM DAN BAHAN JADINYA


BESI BETON U 24 (RATA-RATA)
BESI BETON U 39/U 32 (RATA-RATA)
BESI STRIP
BESI SIKU EX DN
BESI PROFIL DN SII
TREKSTANG BESI DIA. 12 MM
BESI BATANG TARIK DIA. 16 MM
BESI IKATAN ANGIN BESI DIA. 16 MM
WIREMESH M6
WIREMESH M7
WIREMESH M8
FLOOR DECK
RANGKA PIPA HOLLOW 20x40
RANGKA PIPA HOLLOW 40x40
RANGKA METAL PURING UTAMA
RANGKA METAL PURING PEMBAGI
RANGKA PLAPOND METAL PURING
JOINT TAPE
KAWAT LAS LISTRIK
KAWAT LAS KARBIT
KAWAT BETON
KUSEN ALUMINIUM 1 1/2 X 3" WARNA (YKK)
KUSEN ALUMINIUM 1 1/2 X 4" NATURAL (YKK)

No.

JENIS

155
156
157
158
159
160
161
162
163
164

KUSEN ALUMINIUM 1 1/2 X 6" NATURAL (YKK)


KARET KACA + GASKET
SILIKON
SEALANT KUSEN ALUMINIUM
SEALANT KACA TEMPERED
SEALANT KACA
PRIME PINTU ALUMINIUM
PRIME JENDELA ALUMINIUM
PRIME JENDELA ALUMINIUM WARNA
DAUN PINTU MEGATEAK ( Kayu Kuat Kelas II (Kamper)

H.
165
166
167
168
169
170
171
172
173

BAHAN KACA
KACA POLOS 5 MM
KACA RAYBAN 5 MM
KACA POLOS 8 MM
KACA RAYBAN 8 MM
KACA POLOS 10 MM
KACA ES 5 MM
KACA ES 8 MM
KACA TEMPERED 12 MM
DAUN PINTU KACA TEMPERED 12 MM

I.
174
175
176
177
178
179
180
181

BAHAN PAKU DAN MUR BOUT


PAKU 1 - 3 Cm
PAKU 5 - 7 Cm
SKRUP GYPSUM 5 CM
SKRUP GYPSUM 3 CM
BAUD DAN MUR 12 MM
BAUD DAN MUR 19 MM
BAUD ANGKUR 22 MM
BAUD ANGKUR 25 MM

J.
182
183
184
185
186
187
188

BAHAN SANITAIR
CLOSET DUDUK LENGKAP ASSESORIES SEK. TOTO
CLOSET JONGKOK TOTO
WASTAFEL LENGKAP ASSESORIES SEK. TOTO
URINOIR MUSLIM LENGKAP ASSESORIES SEK. TOTO
SEKAT URINOIR LENGKAP ASSESORIES SEK. TOTO
KITCHEN ZINK
TEMPAT SABUN STAINLESS

No.

JENIS

189
190
191
192
193
194
195
196
197
198

BAK FIBREGLASS STANDAR


JET WASHER SEK. TOTO
HAND SHOWER SEK. TOTO
KRAN TEMBOK SEK. TOTO
KRAN GANDA SEK. TOTO
KRAN BEBEK SEK. TOTO
FLOOR DRAIN SEK. TOTO
CLEAN OUT 4"
ROOF DRAIN STAINLESS
KACA CERMIN (DIBOVLE) DI ATAS WASTAFEL 66X100

K.
199
200
201
202
203
204
205
206
207
208
209
210
211

BAHAN ALAT PENGGANTUNG


KUNCI TANAM 2 PUTARAN
KUNCI KM BULAT (ALFA)
KUNCI PINTU SETARA DEKSON
ENGSEL PINTU
ENGSEL JENDELA (UNILON)
ENGSEL ANGIN
GRENDEL PINTU KAYU
RAMBUNCIS
ENGSEL CASEMENT 16"
HANDLE/PEGANGAN PINTU STAINLESS
KUNCI PINTU ALUMINIUM
FLOORHING
GRENDEL PINTU ALUMINIUM

K.
212
213
214
215
216
217
218
219
220
221
222
223
224

BAHAN PIPA
PIPA GSP MEDIUM 1/2 "
PIPA GSP MEDIUM 3/4 "
PIPA GSP MEDIUM 1 "
PIPA GSP MEDIUM 1 1/4 "
PIPA GSP MEDIUM 1 1/2"
PIPA GSP MEDIUM 2"
GATE VALVE 2"
GATE VALVE 1 1/2"
GATE VALVE 1 1/4"
GATE VALVE 1"
CHECK VALVE 2"
FLEXIBLE JOINT 2"
Y STAINER 2"

No.

JENIS

225
226
227
228
229
230

Y STAINER 1 1/4"
FLOAT VALVE 1"
FLOAT VALVE 2"
WLC, TERMASUK KABEL KONTROL
PRESSURE GAUGE
HEADER 3"

L.
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262

BAHAN ELEKTRIKAL
Lampu Baret Persegi TL Bulat 20 W
Downlight PLE 14 w (E27)
Lampu Roset PLE 11 W (E27)
Armature 2 x 18 W (RM)
Armature 2 x 36 W (RM 300) ALML M2
Saklar Tunggal 10 A, 1 Phasa
Saklar Ganda 10 A, 1 Phasa
Saklar Hotel Tunggal 10 A, 1 Phasa
Saklar Hotel Ganda 10 A, 1 Phasa
Saklar Grid 4 Gang 10 A, 1 Phasa
Saklar Grid 6 Gang 10 A, 1 Phasa
Stop Kontak 16 A, 1 Phasa
Kabel NYY 4Cx10 Sqmm
Kabel NYY 4Cx6 Sqmm
Kabel NYM 3Cx2,5 Sqmm
Kabel NYA 1 x 4 mm
Kabel NYA 1Cx6 Sqmm
Conduit dia 20 mm (3/4")
Pipa Konduit dia 20 mm2 (3/4")
Kabel Tray 200 x 100 Sqmm
Kabel Tray 300 x 100 Sqmm
Kabel Ladder 300 x 100 Sqmm
Kabel Ladder 200 x 100 Sqmm
Tee 300 x 100 Sqmm
Elbow 300 x 100 Sqmm
Cross 300 x 100 Sqmm
Tee 200 x 100 Sqmm
Elbow 200 x 100 Sqmm
Cross 200 x 100 Sqmm
MCCB 100 A, 3 phasa
MCCB 50 A, 3 phasa
MCB 40 A, 3 phasa

No.

JENIS

263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286

MCB 32 A, 3 phasa
MCB 16 A, 1 phasa
MCB 10 A, 1 phasa
MCB 6 A, 1 phasa
Indicator Lamp
Fuse 4 A
Amper meter
Volt meter
Selector switch
Cosphi meter
CT 63 / 5A
Box Panel 600 x 500 x 250
Box Panel 1200 x800 x 400
Outlet Telephone
Kabel Stel K - 011 2 x 2 x 0,6 mm
Kabel Stel K - 011 10 x 2 x 0,6 mm
TB - T 10 pairs
Photo Electric Smoke Detector
Rate of Rise Heat Detector
Fixed Temperatur Heat Detector
Alarm Bell
Manual Push Button
MCFA 4 Zone
Anunciator

287
288
289
290
291
292
293
294
295
296
297
298
299
300
301

Kabel NYY 4Cx25 Sqmm


Kabel NYA 1Cx16 Sqmm
Kabel NYFGBY 4Cx50 Sqmm
TB - TP 20 pairs
MDF - TP 80 pairs
PABX 6 / 36
Kabel Stel - K 20 x 2 x 0,6 mm2
Lampu Indicator
Kabel NYM 3 x 2,5 mm
Kabel NYA 2 x 1,5 mm
MDF - Fa 40 pairs
Outlet Data
HUB / Switch 24 ports
Pantch Panel HUB / Switch 8 ports
Rack 8U

No.
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321

JENIS
Kabel UTP Cat 6
Ceiling Speaker 3 w
Volume Kontrol
TB - TS. 10 pairs
Pre Recorder Evaluation
Compact Dist / MP3 Player
SM / FM Tuner
Emergency Microphone
Mixer Pre - Amplifier
Equalizer
Power Amplifier 1 x 240 w
Rack
MDF - SS 20 Pairs
Kabel NYMHY 3 x 2,5 mm2
SPLIT WALL 1 PK Wall mounted type
SPLIT WALL 2,5 PK Wall mounted type
SPLIT WALL 3 PK Wall cassette type
SPLIT WALL 4 PK Wall cassette type
SPLIT WALL 3/4 PK Wall mounted type
SPLIT WALL 5 PK Wall mounted type

DAFTAR HARGA SATUAN UPAH DAN BAHAN


JENIS

EPALA TUKANG BATU

EPALA TUKANG KAYU


UKANG CAT/PLITUR
EPALA TUKANG CAT/PLITUR
UKANG BESI BETON
EPALA TUKANG BESI BETON
UKANG BESI PROFIL
EPALA TUKANG BESI PROFIL
EMBANTU OPERATOR
OPERATOR TERLATIH
UPIR TERAMPIL
EMBANTU SUPIR

AHAN AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA

ATU PECAH 1-2 CM


ATU PECAH MESIN 2/3
ATU PECAH MESIN 3/5
ATU PECAH 5-7 CM
ATU BELAH UNTUK PONDASI

ATU TEMPEL HITAM


ATA MERAH BAKAR KEAS I
ATA MERAH BAKAR KELAS II
ATA CONBLOCK 40x20x10 CM
ATA RINGAN RINGAN T. 10 CM
ATA RINGAN RINGAN T. 6 CM
MURTAR UTAMA MU.380 ( PASANGAN )

HA

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

JENIS

HA

MURTAR UTAMA MU.301 (PLESTERAN )


MURTAR UTAMA MU.350 ( ACIAN )
MURTAR UTAMA MU.200 ( ACIAN )
GROUTING NAD MU 408
EMEN PC (TIGA RODA - 50 KG/ZAK)
EMEN PC (TIGA RODA - 50 KG/ZAK)
EMEN WARNA (DUA GUNUNG)
EMEN WARNA (MITZUBISHI)
ETON READY MIX K-175
ETON READY MIX K-225
ETON READY MIX K-250
ETON READY MIX K-275
ETON READY MIX K-300
ETON READY MIX K-325
ETON READY MIX K-350
ETON TIANG PANCANG DIA.40 CM

AHAN FINISHING : LABURAN, PENGISI DAN ALATNYA


LKALI (CAT DASAR ICI)
LAMIR TEMBOK (SANLEX)
AT TEMBOK (VINILEX)
AT TEMBOK (PENTALITE/DULUX)
AT TEMBOK (ICI)
OL CAT TEMBOK

ML 131 CLEAR DANAGLOS

OKER (MATAHARI)

OTEM (PEWARNA PLITUR)

AHAN PLITUR KRIPIK (SIRLAK INDIA)

EMPUL PLITUR
EMPUL HALUS.IMPRA (WOOD FILLER)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

JENIS

MELAMIN SENDING SILLER MSS 123


MPELAS DUCO
ERNIS (COPAL)
LITUR JADI (KEMUDI)

MENI KAYU/BESI (GENTONG)


AT KAYU (AVIAN)
AT KAYU (DECOLUX)
AT BESI (AVIAN)
AT BESI (DECOLUX)
LINGCOAT (GENTONG)
MINYAK BAKAR SOLAR
MINYAK BAKAR PREMIUM

MINYAK PELUMAS

WATER PROOFING (NO DROP)


WATER PROOFING (AQUA PROF)

HA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

AHAN KAYU BERIKUT BAHAN JADINYA


AYU LOKAL/RAWA (ALBASIAH)
AYU BALOK MARANTI
AYU PAPAN MARANTI
AYU BALOK MAHONI
AYU PAPAN MAHONI
AYU TERENTANG
AYU BALOK BORNEO SUPER
AYU PAPAN BORNEO SUPER
AYU BALOK KAMPER BANJAR
AYU PAPAN KAMPER BANJAR
AYU BALOK KAMPER OVEN
AYU PAPAN KAMPER OVEN
AYU DOLKEN 5 - 7 CM

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

AYU DOLKEN 8 - 10 CM
USEN KAYU KAMPER FINISH MELAMIC 6x4 CM
LINT MULTIPLEKS LAPIS MEGATEAK FINISH MELAMIC 1,5/10 CM
IST MULTIPLEKS LAPIS MEGATEAK FINISH MELAMIC 1,5/4 CM
IST MULTIPLEKS LAPIS MEGATEAK FINISH MELAMIC 2/10 CM

Rp.
Rp.
Rp.
Rp.
Rp.

JENIS

HA

IST KAYU KAMPER DIPROFIL FINISH MELAMIC 1/4 CM


WALLPAPER TERPASANG

Rp.
Rp.

AHAN KAYU LAPIS


RIPLEK 3 MM (120 x 240 CM)
RIPLEK 4 MM (120 x 240 CM)
RIPLEK 4 MM (UKURAN PINTU)
RIPLEK 6 MM (120 x 240 CM)
RIPLEK 9 MM (120 x 240 CM)
MULTIPLEK 9 MM (120 x 240 CM)
MEGATEAK 4 MM (120 x 240 CM)
MEGATEAK 4 MM (UKURAN PINTU)
MELAMIN 4 MM (120 x 240 CM)
ORMICA (UKURAN PINTU)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

AHAN PENUTUP RANGKA PLAFOND


AHAN PLAFON GRC PLAT 4 MM
GYPSUM 120x240 CM, EX DN
GYPTILE JAYABOARD 120x60 CM, T. 9 MM
IST GIFSUM MOTIF LURUS/MINIMALIS - 8 CM (TERPASANG)
ROP CEILING MOTIF SINGLE (TERPASANG)

AHAN LANTAI DAN PELAPIS DINDING


ERAMIK 20/20 KW 1 ANTI SLIP (KM/WC) (ROMAN)
ERAMIK 20/25 KW 1 (KM/WC) (ROMAN) DINDING
ERAMIK 30/30 KW 1 (ROMAN)
ERAMIK 40/40 KW 1 (ROMAN)
OMOGEUNIOUS TILE 60/60 STANDAR
LINT KERAMIK 10/30
LINT HOMOGEUNIOU 10/60
TEP NOZING TANGGA 10/40
IST / BORDER KERAMIK 8/25

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

JENIS

AHAN SALURAN AIR KOTOR/BERSIH


GRAVEL U 30 CM
IPA PVC 1/2" AW (Wavin)
IPA PVC 3/4" AW (Wavin)
IPA PVC 1" AW (Wavin)
IPA PVC 1 1/4" AW (Wavin)
IPA PVC 1 1/2" AW (Wavin)
IPA PVC 2" AW (Wavin)
IPA PVC 2 1/2" AW (Wavin)
IPA PVC 3" AW (Wavin)
IPA PVC 4" AW (Wavin)
IPA PVC 5" AW (Wavin)

EM PUTIH (FOX)
EM KUNING (AICA/AIBON)

AHAN LOGAM DAN BAHAN JADINYA


ESI BETON U 24 (RATA-RATA)
ESI BETON U 39/U 32 (RATA-RATA)

ESI SIKU EX DN
ESI PROFIL DN SII
REKSTANG BESI DIA. 12 MM
ESI BATANG TARIK DIA. 16 MM
ESI IKATAN ANGIN BESI DIA. 16 MM

ANGKA PIPA HOLLOW 20x40


ANGKA PIPA HOLLOW 40x40
ANGKA METAL PURING UTAMA
ANGKA METAL PURING PEMBAGI
ANGKA PLAPOND METAL PURING

AWAT LAS LISTRIK


AWAT LAS KARBIT

USEN ALUMINIUM 1 1/2 X 3" WARNA (YKK)


USEN ALUMINIUM 1 1/2 X 4" NATURAL (YKK)

HA

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

JENIS

USEN ALUMINIUM 1 1/2 X 6" NATURAL (YKK)


ARET KACA + GASKET

EALANT KUSEN ALUMINIUM


EALANT KACA TEMPERED
EALANT KACA
RIME PINTU ALUMINIUM
RIME JENDELA ALUMINIUM
RIME JENDELA ALUMINIUM WARNA
AUN PINTU MEGATEAK ( Kayu Kuat Kelas II (Kamper))

ACA POLOS 5 MM
ACA RAYBAN 5 MM
ACA POLOS 8 MM
ACA RAYBAN 8 MM
ACA POLOS 10 MM

ACA TEMPERED 12 MM
AUN PINTU KACA TEMPERED 12 MM

HA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

AHAN PAKU DAN MUR BOUT

KRUP GYPSUM 5 CM
KRUP GYPSUM 3 CM
AUD DAN MUR 12 MM
AUD DAN MUR 19 MM
AUD ANGKUR 22 MM
AUD ANGKUR 25 MM

AHAN SANITAIR
LOSET DUDUK LENGKAP ASSESORIES SEK. TOTO
LOSET JONGKOK TOTO
WASTAFEL LENGKAP ASSESORIES SEK. TOTO
RINOIR MUSLIM LENGKAP ASSESORIES SEK. TOTO
EKAT URINOIR LENGKAP ASSESORIES SEK. TOTO

EMPAT SABUN STAINLESS

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

JENIS

AK FIBREGLASS STANDAR
ET WASHER SEK. TOTO
AND SHOWER SEK. TOTO
RAN TEMBOK SEK. TOTO
RAN GANDA SEK. TOTO
RAN BEBEK SEK. TOTO
LOOR DRAIN SEK. TOTO

OOF DRAIN STAINLESS


ACA CERMIN (DIBOVLE) DI ATAS WASTAFEL 66X100 (T.5 MM)

AHAN ALAT PENGGANTUNG


UNCI TANAM 2 PUTARAN
UNCI KM BULAT (ALFA)
UNCI PINTU SETARA DEKSON

NGSEL JENDELA (UNILON)

GRENDEL PINTU KAYU

NGSEL CASEMENT 16"


ANDLE/PEGANGAN PINTU STAINLESS
UNCI PINTU ALUMINIUM

GRENDEL PINTU ALUMINIUM

IPA GSP MEDIUM 1/2 "


IPA GSP MEDIUM 3/4 "
IPA GSP MEDIUM 1 "
IPA GSP MEDIUM 1 1/4 "
IPA GSP MEDIUM 1 1/2"
IPA GSP MEDIUM 2"
GATE VALVE 2"
GATE VALVE 1 1/2"
GATE VALVE 1 1/4"
GATE VALVE 1"
HECK VALVE 2"
LEXIBLE JOINT 2"

HA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

STAINER 1 1/4"
LOAT VALVE 1"
LOAT VALVE 2"
WLC, TERMASUK KABEL KONTROL
RESSURE GAUGE

AHAN ELEKTRIKAL
ampu Baret Persegi TL Bulat 20 W
ownlight PLE 14 w (E27)
ampu Roset PLE 11 W (E27)
rmature 2 x 18 W (RM)
rmature 2 x 36 W (RM 300) ALML M2
aklar Tunggal 10 A, 1 Phasa
aklar Ganda 10 A, 1 Phasa
aklar Hotel Tunggal 10 A, 1 Phasa
aklar Hotel Ganda 10 A, 1 Phasa
aklar Grid 4 Gang 10 A, 1 Phasa
aklar Grid 6 Gang 10 A, 1 Phasa
top Kontak 16 A, 1 Phasa
abel NYY 4Cx10 Sqmm
abel NYY 4Cx6 Sqmm
abel NYM 3Cx2,5 Sqmm
abel NYA 1 x 4 mm
abel NYA 1Cx6 Sqmm
onduit dia 20 mm (3/4")
ipa Konduit dia 20 mm2 (3/4")
abel Tray 200 x 100 Sqmm
abel Tray 300 x 100 Sqmm
abel Ladder 300 x 100 Sqmm
abel Ladder 200 x 100 Sqmm
ee 300 x 100 Sqmm
lbow 300 x 100 Sqmm
ross 300 x 100 Sqmm
ee 200 x 100 Sqmm
lbow 200 x 100 Sqmm
ross 200 x 100 Sqmm
MCCB 100 A, 3 phasa
MCCB 50 A, 3 phasa
MCB 40 A, 3 phasa

JENIS

HA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

MCB 32 A, 3 phasa
MCB 16 A, 1 phasa
MCB 10 A, 1 phasa
MCB 6 A, 1 phasa

ox Panel 600 x 500 x 250


ox Panel 1200 x800 x 400
Outlet Telephone
abel Stel K - 011 2 x 2 x 0,6 mm
abel Stel K - 011 10 x 2 x 0,6 mm

hoto Electric Smoke Detector


ate of Rise Heat Detector
ixed Temperatur Heat Detector

Manual Push Button

abel NYY 4Cx25 Sqmm


abel NYA 1Cx16 Sqmm
abel NYFGBY 4Cx50 Sqmm

MDF - TP 80 pairs

abel Stel - K 20 x 2 x 0,6 mm2

abel NYM 3 x 2,5 mm


abel NYA 2 x 1,5 mm
MDF - Fa 40 pairs

UB / Switch 24 ports
antch Panel HUB / Switch 8 ports

JENIS

HA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

eiling Speaker 3 w

re Recorder Evaluation
ompact Dist / MP3 Player

mergency Microphone
Mixer Pre - Amplifier

ower Amplifier 1 x 240 w

MDF - SS 20 Pairs
abel NYMHY 3 x 2,5 mm2
PLIT WALL 1 PK Wall mounted type
PLIT WALL 2,5 PK Wall mounted type
PLIT WALL 3 PK Wall cassette type
PLIT WALL 4 PK Wall cassette type
PLIT WALL 3/4 PK Wall mounted type
PLIT WALL 5 PK Wall mounted type

JENIS

HA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

UAN UPAH DAN BAHAN


HAR GA

SATUAN

88,200.00
103,800.00
103,800.00
119,600.00
103,800.00
119,600.00
103,800.00
119,600.00
103,800.00
119,600.00
103,800.00
119,600.00
103,800.00
119,600.00
103,800.00
88,200.00
135,200.00

1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari

190,000.00
248,800.00
250,100.00
247,000.00
247,500.00
243,500.00
232,200.00
221,500.00
140,000.00
130,000.00
500.00
420.00
2,500.00
7,900.00
6,000.00
3,600.00

m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
bh
bh
bh
bh
bh
kg

HAR GA

SATUAN
1,100.00
1,000.00
3,800.00
2,400.00
62,000.00
1,240.00
4,000.00
5,000.00
675,000.00
700,000.00
710,000.00
715,000.00
730,000.00
750,000.00
780,000.00
430,000.00

kg
kg
kg
kg
zak
kg
kg
kg
m3
m3
m3
m3
m3
m3
m3
m'

47,500.00
11,700.00
14,000.00
28,500.00
62,500.00
32,000.00
9,600.00
8,500.00
40,000.00
12,500.00
15,000.00
17,100.00
4,000.00
6,000.00
6,900.00
2,500.00
75,000.00
17,500.00
17,500.00
35,000.00
4,500.00
24,000.00

ltr
kg
kg
kg
kg
bh
bh
bh
kg
bh
bh
kg
bks
bks
ltr
bks
kg
kg
kg
kg
ltr
ltr

HAR GA

SATUAN
42,700.00
45,000.00
400.00
15,000.00
17,500.00
47,000.00
19,200.00
50,000.00
58,000.00
41,000.00
44,700.00
10,000.00
4,500.00
4,500.00
3,000.00
28,000.00
10,000.00
40,000.00
44,000.00

kg
kg
lbr
ltr
ltr
kg
kg
kg
kg
kg
kg
ltr
ltr
ltr
ltr
ltr
kg
kg
kg

1,200,000.00
2,750,000.00
2,900,000.00
2,750,000.00
2,900,000.00
1,550,000.00
3,500,000.00
3,800,000.00
5,200,000.00
5,600,000.00
7,200,000.00
7,600,000.00
17,500.00

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
btg

21,500.00
95,000.00
22,500.00
15,000.00
30,000.00

btg
m'
m'
m'
m'

HAR GA

SATUAN
10,000.00
45,000.00

m'
m2

62,100.00
84,200.00
64,000.00
97,000.00
146,000.00
146,000.00
121,000.00
98,000.00
110,000.00
90,000.00

lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr

60,000.00
70,000.00
30,000.00
12,000.00
35,000.00
43,000.00

lbr
lbr
lbr
m'
m'
zak

74,500.00
76,000.00
76,000.00
84,000.00
195,000.00
6,500.00
17,000.00
18,500.00
7,500.00

m2
m2
m2
m2
m2
Bh
Bh
Bh
bh

HAR GA

SATUAN

60,000.00
8,500.00
10,000.00
12,000.00
14,000.00
16,500.00
23,000.00
30,000.00
40,000.00
50,000.00
70,000.00
6,000.00
20,000.00
25,000.00

bh
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
tube
kg
kg

9,800.00
9,800.00
12,500.00
12,700.00
12,600.00
20,000.00
90,000.00
75,000.00
33,600.00
44,400.00
56,400.00
115,000.00
6,000.00
8,000.00
7,000.00
5,000.00
37,500.00
32,500.00
15,000.00
17,800.00
19,600.00
105,000.00
110,000.00

kg
kg
kg
kg
kg
bh
set
set
m2
m2
m2
m2
m'
m'
m'
m'
m2
roll
kg
kg
kg
m'
m'

HAR GA

SATUAN
150,000.00
3,000.00
8,000.00
7,500.00
16,500.00
6,500.00
85,000.00
75,000.00
85,000.00
506,000.00

m'
m'
m'
m'
m'
m'
m'
m'
m'
m2

75,000.00
85,000.00
120,000.00
180,000.00
145,000.00
105,000.00
205,000.00
850,000.00
2,500,000.00

m2
m2
m2
m2
m2
m2
m2
m2
unit

18,000.00
15,000.00
300.00
100.00
5,000.00
7,500.00
10,000.00
12,500.00

kg
kg
bh
bh
bh
bh
bh
bh

1,600,000.00
350,000.00
1,200,000.00
1,450,000.00
725,000.00
900,000.00
150,000.00

set
bh
bh
bh
bh
bh
bh

HAR GA

SATUAN
250,000.00
110,000.00
250,000.00
170,000.00
175,000.00
275,000.00
150,000.00
160,000.00
150,000.00
275,000.00

bh
set
set
set
set
set
bh
bh
bh
set

200,000.00
40,000.00
475,000.00
15,000.00
12,000.00
30,000.00
30,000.00
15,000.00
45,000.00
350,000.00
180,000.00
600,000.00
125,000.00

bh
bh
bh
bh
bh
bh
bh
set
set
set
set
set
set

24,000.00
32,000.00
40,000.00
52,000.00
65,000.00
80,000.00
950,000.00
800,000.00
420,000.00
280,000.00
1,100,000.00
320,000.00
780,000.00

m'
m'
m'
m'
m'
m'
bh
bh
bh
bh
bh
bh
bh

HAR GA

SATUAN
290,000.00
250,000.00
420,000.00
760,000.00
95,000.00
1,200,000.00

bh
bh
bh
bh
bh
bh

190,000.00
115,000.00
54,000.00
320,000.00
520,000.00
20,000.00
30,000.00
22,000.00
40,000.00
220,000.00
320,000.00
23,000.00
67,000.00
42,000.00
11,000.00
4,000.00
7,200.00
2,200.00
2,200.00
140,000.00
210,000.00
160,000.00
130,000.00
280,000.00
240,000.00
340,000.00
240,000.00
190,000.00
280,000.00
680,000.00
660,000.00
440,000.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
bh
bh
bh
bh
bh
bh
bh
bh
bh

HAR GA

SATUAN
420,000.00
56,000.00
56,000.00
56,000.00
65,000.00
22,000.00
200,000.00
220,000.00
85,000.00
1,400,000.00
80,000.00
900,000.00
3,200,000.00
30,000.00
2,700.00
5,200.00
620,000.00
580,000.00
310,000.00
270,000.00
240,000.00
340,000.00
26,800,000.00
8,500,000.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
unit
unit
bh
m'
m'
unit
bh
bh
bh
bh
bh
unit
unit

106,000.00
16,000.00
210,000.00
780,000.00
1,100,000.00
45,500,000.00
8,400.00
680,000.00
11,000.00
4,000.00
880,000.00
85,000.00
640,000.00
490,000.00
1,800,000.00

m'
m'
m'
bh
bh
bh
bh
bh
m'
m'
bh
bh
bh
bh
bh

HAR GA

SATUAN
5,000.00
65,000.00
125,000.00
700,000.00
4,050,000.00
2,948,000.00
3,344,000.00
685,500.00
10,383,600.00
1,679,300.00
5,060,000.00
8,402,200.00
950,000.00
13,900.00
3,008,200.00
9,234,900.00
13,283,300.00
16,929,700.00
2,473,400.00
16,929,700.00

Jakarta, 30 Nopember 2012


PT. Nugraha Adi Taruna

Ir. G.T. Yudi Rahman


Direktur Utama

m'
bh
bh
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
m'
unit
unit
unit
unit
unit
unit

SPESIFIKASI MATERIAL/BA
No.

JENIS MATERIAL

A.
BAHAN AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA
1
PASIR URUG
2
PASIR PASANG
3
PASIR BETON
4
BATU PECAH 1-2 CM
5
BATU PECAH MESIN 2/3
6
BATU PECAH MESIN 3/5
7
BATU PECAH 5-7 CM
Err:509 Err:509
8
BATU BELAH UNTUK PONDASI
Err:509 Err:509
9
BATU ANDESIT
10
BATU TEMPEL HITAM
11
BATA MERAH BAKAR KEAS I
12
BATA MERAH BAKAR KELAS II
13
BATA CONBLOCK 40x20x10 CM
Err:509 Err:509
14
BATA RINGAN RINGAN T. 10 CM
15
BATA RINGAN RINGAN T. 6 CM
16
MURTAR UTAMA MU.380 ( PASANGAN )
17
MURTAR UTAMA MU.301 (PLESTERAN )
18
MURTAR UTAMA MU.350 ( ACIAN )
20
GROUTING NAD MU 408
21
SEMEN PC (TIGA RODA - 50 KG/ZAK)
22
SEMEN WARNA (DUA GUNUNG)
23
SEMEN WARNA (MITZUBISHI)
24
BETON READY MIX K-175
25
BETON READY MIX K-225

SPESIFIKASI

Lokal
Lokal
Lokal
Lokal, Memenuhi PUBI 82 dan Pera
Lokal, Memenuhi PUBI 82 dan Pera
Lokal, Memenuhi PUBI 82 dan Pera
Lokal, Memenuhi PUBI 82 dan Pera
Lokal, Memenuhi PUBI 82 dan Pera
Lokal, Memenuhi PUBI 82 dan Pera
Lokal, Memenuhi PUBI 82 dan Pera
Lokal, Produksi Palimanan
Lokal, Produksi Palimanan
Lokal, Pres Mesin uk. 20 x 10 x 5 cm
Lokal, Manual, uk. 20 x 10 x 5 cm
Merk : Celcon
Merk : Celcon
Merk : Celcon
Merk : Mortar Utama
Merk : Mortar Utama
Merk : Mortar Utama
Merk : Mortar Utama
Merk ; tiga Roda
Merk : Dua Gunung
Merk : Dua Gunung
Produksi : Betamix
Produksi : Betamix

No.

JENIS MATERIAL

26
27
28
29
30
31

BETON READY MIX K-250


BETON READY MIX K-275
BETON READY MIX K-300
BETON READY MIX K-325
BETON READY MIX K-350
BETON TIANG PANCANG DIA.40 CM

B.
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54

BAHAN FINISHING : LABURAN, PENGISI DAN ALATNYA


ALKALI (CAT DASAR ICI)
PLAMIR TEMBOK (SANLEX)
CAT TEMBOK (VINILEX)
CAT TEMBOK (PENTALITE/DULUX)
CAT TEMBOK (ICI)
ROL CAT TEMBOK
KAPE TEMBOK
KAPE KAYU
ML 131 CLEAR DANAGLOS
KWAS 3"
KWAS 4"
OKER (MATAHARI)
OYAN
OTEM (PEWARNA PLITUR)
SPIRTUS
SODA API
BAHAN PLITUR KRIPIK (SIRLAK INDIA)
DEMPUL LILIN
DEMPUL PLITUR
DEMPUL HALUS.IMPRA (WOOD FILLER)
TERPENTIN
TINNER B
KUMPON

SPESIFIKASI
Produksi
Produksi
Produksi
Produksi
Produksi
Produksi

: Betamix
: Betamix
: Betamix
: Betamix
: Betamix
: JHS/ WIKA

Merk : ICI
Merk : Sanlex
Merk : Vinilex
Merk : Pentalite
Merk : ICI
Merk : Lokal
Merk : Lokal
Merk : Lokal
Merk : Danaglos
Merk : Lokal
Merk : Lokal
Merk : Matahari
Merk : Kucing
Merk : Kucing
Merk : Penta
Merk : Kucing
Merk : Kucing
Merk : Kucing
Merk : Kucing
Merk : Danagloss
Merk : Danagloss
Merk : Kucing

No.

JENIS MATERIAL

SPESIFIKASI

55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72

MELAMIN SENDING SILLER MSS 123


AMPELAS DUCO
VERNIS (COPAL)
PLITUR JADI (KEMUDI)
DEMPUL KAYU
MENI KAYU/BESI (GENTONG)
CAT KAYU (AVIAN)
CAT KAYU (DECOLUX)
CAT BESI (AVIAN)
CAT BESI (DECOLUX)
FLINGCOAT (GENTONG)
MINYAK BAKAR SOLAR
MINYAK BAKAR PREMIUM
MINYAK TANAH
MINYAK PELUMAS
INJUK
WATER PROOFING (NO DROP)
WATER PROOFING (AQUA PROF)

Merk : Kucing
Merk : Kucing
Merk : Kucing
Merk : Kucing
Merk : Pamatex
Merk : Gentong
Merk : Avian
Merk : Decolux
Merk : Avian
Merk : Decolux
Merk : Gentong
Merk : Pertamina
Merk : Pertamina
Merk : Pertamina
Merk : Pertamina
Lokal
Merk : No Drop
Merk : aqua Prof

C.
73
74
75
76
77
78
79
80
81
82
83

BAHAN KAYU BERIKUT BAHAN JADINYA


KAYU LOKAL/RAWA (ALBASIAH)
KAYU BALOK MARANTI
KAYU PAPAN MARANTI
KAYU BALOK MAHONI
KAYU PAPAN MAHONI
KAYU TERENTANG
KAYU BALOK BORNEO SUPER
KAYU PAPAN BORNEO SUPER
KAYU BALOK KAMPER BANJAR
KAYU PAPAN KAMPER BANJAR
KAYU BALOK KAMPER OVEN

Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal

: Albasiah
: Maranti
: Maranti
: Mahoni
: Mahoni
: Terentang
: Borneo Super
: Borneo Super
: Banjar
: Banjar
: Kamper Oven

No.

JENIS MATERIAL

84
85
86
87
88
89
90
91
92

KAYU PAPAN KAMPER OVEN


KAYU DOLKEN 5 - 7 CM
KAYU DOLKEN 8 - 10 CM
KUSEN KAYU KAMPER FINISH MELAMIC 6x4 CM
PLINT MULTIPLEKS LAPIS MEGATEAK FINISH MELAMIC 1,5/10 CM
LIST MULTIPLEKS LAPIS MEGATEAK FINISH MELAMIC 1,5/4 CM
LIST MULTIPLEKS LAPIS MEGATEAK FINISH MELAMIC 2/10 CM
LIST KAYU KAMPER DIPROFIL FINISH MELAMIC 1/4 CM
WALLPAPER TERPASANG

D.
93
94
95
96
97
98
99
100
101
102

BAHAN KAYU LAPIS


TRIPLEK 3 MM (120 x 240 CM)
TRIPLEK 4 MM (120 x 240 CM)
TRIPLEK 4 MM (UKURAN PINTU)
TRIPLEK 6 MM (120 x 240 CM)
TRIPLEK 9 MM (120 x 240 CM)
MULTIPLEK 9 MM (120 x 240 CM)
MEGATEAK 4 MM (120 x 240 CM)
MEGATEAK 4 MM (UKURAN PINTU)
MELAMIN 4 MM (120 x 240 CM)
FORMICA (UKURAN PINTU)

E.
103
104
105
106
107
108

BAHAN PENUTUP RANGKA PLAFOND


BAHAN PLAFON GRC PLAT 4 MM
GYPSUM 120x240 CM, EX DN
GYPTILE JAYABOARD 120x60 CM, T. 9 MM
LIST GIFSUM MOTIF LURUS/MINIMALIS - 8 CM (TERPASANG)
DROP CEILING MOTIF SINGLE (TERPASANG)
Cornise Gypsum

F.

BAHAN LANTAI DAN PELAPIS DINDING

SPESIFIKASI
Lokal : Kamper Oven
Lokal : Kayu Hutan
Lokal : Kayu Hutan
Lokal : Kamper
Kayu Kamper
Kayu Kamper
Kayu Kamper
Kayu Kamper
Merk : Star wall

Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Formika

Merk : GRC Board


Merk : Jayaboard
Merk : Jayaboard
Lokal
Merk : Jayaboard
Merk : Jaya Cornice

No.

JENIS MATERIAL

SPESIFIKASI

109
110
111
112
113
114
115
116
117

KERAMIK 20/20 KW 1 ANTI SLIP (KM/WC) (ROMAN)


KERAMIK 20/25 KW 1 (KM/WC) (ROMAN) DINDING
KERAMIK 30/30 KW 1 (ROMAN)
KERAMIK 40/40 KW 1 (ROMAN)
HOMOGEUNIOUS TILE 60/60 STANDAR
PLINT KERAMIK 10/30
PLINT HOMOGEUNIOU 10/60
STEP NOZING TANGGA 10/40
LIST / BORDER KERAMIK 8/25

Merk : Roman
Merk : Roman
Merk : Roman
Merk : Roman
Merk : Granito (Salsa)
Merk : Roman
Merk : Granito
Merk : Roman
Merk : Roman

G.
118
119
120
121
122
123
124
125
126
127
128
129
130
131

BAHAN SALURAN AIR KOTOR/BERSIH


GRAVEL U 30 CM
PIPA PVC 1/2" AW (Wavin)
PIPA PVC 3/4" AW (Wavin)
PIPA PVC 1" AW (Wavin)
PIPA PVC 1 1/4" AW (Wavin)
PIPA PVC 1 1/2" AW (Wavin)
PIPA PVC 2" AW (Wavin)
PIPA PVC 2 1/2" AW (Wavin)
PIPA PVC 3" AW (Wavin)
PIPA PVC 4" AW (Wavin)
PIPA PVC 5" AW (Wavin)
LEM PARALON
LEM PUTIH (FOX)
LEM KUNING (AICA/AIBON)

Merk : Lokal
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Tube
Merk : Fox
Merk : AICA

No.

JENIS MATERIAL

SPESIFIKASI

G.
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158

BAHAN LOGAM DAN BAHAN JADINYA


BESI BETON U 24 (RATA-RATA)
BESI BETON U 39/U 32 (RATA-RATA)
BESI STRIP
BESI SIKU EX DN
BESI PROFIL DN SII
TREKSTANG BESI DIA. 12 MM
BESI BATANG TARIK DIA. 16 MM
BESI IKATAN ANGIN BESI DIA. 16 MM
WIREMESH M6
WIREMESH M7
WIREMESH M8
FLOOR DECK
RANGKA PIPA HOLLOW 20x40
RANGKA PIPA HOLLOW 40x40
RANGKA METAL PURING UTAMA
RANGKA METAL PURING PEMBAGI
RANGKA PLAPOND METAL PURING
JOINT TAPE
KAWAT LAS LISTRIK
KAWAT LAS KARBIT
KAWAT BETON
KUSEN ALUMINIUM 1 1/2 X 3" WARNA (YKK)
KUSEN ALUMINIUM 1 1/2 X 4" NATURAL (YKK)
KUSEN ALUMINIUM 1 1/2 X 6" NATURAL (YKK)
KARET KACA + GASKET
SILIKON
SEALANT KUSEN ALUMINIUM

Merk : Krakatau Steel/Cakra


Merk : Krakatau Steel/Cakra
Merk : Krakatau Steel/Cakra
Merk : Krakatau Steel/Cakra
Merk : Krakatau Steel/Cakra
Merk : Krakatau Steel/Cakra
Merk : Krakatau Steel/Cakra
Merk : Krakatau Steel/Cakra
Merk : Lionmesh
Merk : Lionmesh
Merk : Lionmesh
Merk : Lionmesh
Produksi : Jainindo Metal
Produksi : Jainindo Metal
Produksi : Jainindo Metal
Produksi : Jainindo Metal
Produksi : Jainindo Metal
Merk : Polyster
Merk : Nikko
Merk : Metal Puting
Produksi : JSS/Garuda
Merk : Alexindo
Merk : Alexindo
Merk : Alexindo
Lokal
Merk : G-Seal
Merk : G-Seal

159
160

SEALANT KACA TEMPERED


SEALANT KACA

Merk : G-Seal
Merk : G-Seal

No.

JENIS MATERIAL

SPESIFIKASI

161
162
163
164

PRIME PINTU ALUMINIUM


PRIME JENDELA ALUMINIUM
PRIME JENDELA ALUMINIUM WARNA
DAUN PINTU TRIPLEK

Merk : YKK
Merk : YKK
Merk : YKK
Lokal

H.
165
166
167
168
169
170
171
172
173

BAHAN KACA
KACA POLOS 5 MM
KACA RAYBAN 5 MM
KACA POLOS 8 MM
KACA RAYBAN 8 MM
KACA POLOS 10 MM
KACA ES 5 MM
KACA ES 8 MM
KACA TEMPERED 12 MM
DAUN PINTU KACA TEMPERED 12 MM

Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas

No.

JENIS MATERIAL

SPESIFIKASI

I.
174
175
176
177
178
179
180
181

BAHAN PAKU DAN MUR BOUT


PAKU 1 - 3 Cm
PAKU 5 - 7 Cm
SKRUP GYPSUM 5 CM
SKRUP GYPSUM 3 CM
BAUD DAN MUR 12 MM
BAUD DAN MUR 19 MM
BAUD ANGKUR 22 MM
BAUD ANGKUR 25 MM

Produksi : Krakatau Steel/ Garuda


Produksi : Krakatau Steel/ Garuda
Merk : Jaya Screw
Merk : Jaya Screw
Produksi : Krakatau Steel/ Garuda
Produksi : Krakatau Steel/ Garuda
Produksi : Krakatau Steel/ Garuda
Produksi : Krakatau Steel/ Garuda

J.
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198

BAHAN SANITAIR
CLOSET DUDUK LENGKAP ASSESORIES SEK. TOTO
CLOSET JONGKOK TOTO
WASTAFEL LENGKAP ASSESORIES SEK. TOTO
URINOIR MUSLIM LENGKAP ASSESORIES SEK. TOTO
SEKAT URINOIR LENGKAP ASSESORIES SEK. TOTO
KITCHEN ZINK
TEMPAT SABUN STAINLESS
BAK FIBREGLASS STANDAR
JET WASHER SEK. TOTO
HAND SHOWER SEK. TOTO
KRAN TEMBOK SEK. TOTO
KRAN GANDA SEK. TOTO
KRAN BEBEK SEK. TOTO
FLOOR DRAIN SEK. TOTO
CLEAN OUT 4"
ROOF DRAIN STAINLESS
KACA CERMIN (DIBOVLE) DI ATAS WASTAFEL 66X100 (T.5 MM)

Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : Asahimas

K.
199

BAHAN ALAT PENGGANTUNG


KUNCI TANAM 2 PUTARAN

Merk : Dekson

No.

JENIS MATERIAL

SPESIFIKASI

200
201
202
203
204
205
206
207
208
209
210
211

KUNCI KM BULAT (ALFA)


KUNCI PINTU SETARA DEKSON
ENGSEL PINTU
ENGSEL JENDELA (UNILON)
ENGSEL ANGIN
GRENDEL PINTU KAYU
RAMBUNCIS
ENGSEL CASEMENT 16"
HANDLE/PEGANGAN PINTU STAINLESS
KUNCI PINTU ALUMINIUM
FLOORHING
GRENDEL PINTU ALUMINIUM

Merk : ALFA
Merk : Dekson
Merk : Unilon
Merk : Unilon
Merk : Unilon
Merk : Unilon
Merk : ALFA
Merk : ALFA
Merk : ALFA
Merk : Dekson
Merk : Dekson
Merk : ALFA

K.
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228

BAHAN PIPA
PIPA GSP MEDIUM 1/2 "
PIPA GSP MEDIUM 3/4 "
PIPA GSP MEDIUM 1 "
PIPA GSP MEDIUM 1 1/4 "
PIPA GSP MEDIUM 1 1/2"
PIPA GSP MEDIUM 2"
GATE VALVE 2"
GATE VALVE 1 1/2"
GATE VALVE 1 1/4"
GATE VALVE 1"
CHECK VALVE 2"
FLEXIBLE JOINT 2"
Y STAINER 2"
Y STAINER 1 1/4"
FLOAT VALVE 1"
FLOAT VALVE 2"
WLC, TERMASUK KABEL KONTROL

Produksi : Bakrie Pipe Industri


Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri

No.

JENIS MATERIAL

SPESIFIKASI

229
230

PRESSURE GAUGE
HEADER 3"

Produksi : Bakrie Pipe Industri


Produksi : Bakrie Pipe Industri

L.
231
232
233
234
235
236
237
238
239

BAHAN ELEKTRIKAL
Lampu Baret Persegi TL Bulat 20 W
Downlight PLE 14 w (E27)
Lampu Roset PLE 11 W (E27)
Armature 2 x 18 W (RM)
Armature 2 x 36 W (RM 300) ALML M2
Saklar Tunggal 10 A, 1 Phasa
Saklar Ganda 10 A, 1 Phasa
Saklar Hotel Tunggal 10 A, 1 Phasa
Saklar Hotel Ganda 10 A, 1 Phasa

Merk : Philips
Merk : Philips
Merk : Philips
Merk : Philips
Merk : Philips
Merk : Broco
Merk : Broco
Merk : Broco
Merk : Broco

240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256

Saklar Grid 4 Gang 10 A, 1 Phasa


Saklar Grid 6 Gang 10 A, 1 Phasa
Stop Kontak 16 A, 1 Phasa
Kabel NYY 4Cx10 Sqmm
Kabel NYY 4Cx6 Sqmm
Kabel NYM 3Cx2,5 Sqmm
Kabel NYA 1 x 4 mm
Kabel NYA 1Cx6 Sqmm
Conduit dia 20 mm (3/4")
Pipa Konduit dia 20 mm2 (3/4")
Kabel Tray 200 x 100 Sqmm
Kabel Tray 300 x 100 Sqmm
Kabel Ladder 300 x 100 Sqmm
Kabel Ladder 200 x 100 Sqmm
Tee 300 x 100 Sqmm
Elbow 300 x 100 Sqmm
Cross 300 x 100 Sqmm

Merk : Broco
Merk : Broco
Merk : Broco
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Merk : Clipsal
Merk : Clipsal
Merk : Tray Tek
Merk : Tray Tek
Merk : Tray Tek
Merk : Tray Tek
Merk : Clipsal
Merk : Clipsal
Merk : Clipsal

No.

JENIS MATERIAL

SPESIFIKASI

257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285

Tee 200 x 100 Sqmm


Elbow 200 x 100 Sqmm
Cross 200 x 100 Sqmm
MCCB 100 A, 3 phasa
MCCB 50 A, 3 phasa
MCB 40 A, 3 phasa
MCB 32 A, 3 phasa
MCB 16 A, 1 phasa
MCB 10 A, 1 phasa
MCB 6 A, 1 phasa
Indicator Lamp
Fuse 4 A
Amper meter
Volt meter
Selector switch
Cosphi meter
CT 63 / 5A
Box Panel 600 x 500 x 250
Box Panel 1200 x800 x 400
Outlet Telephone
Kabel Stel K - 011 2 x 2 x 0,6 mm
Kabel Stel K - 011 10 x 2 x 0,6 mm
TB - T 10 pairs
Photo Electric Smoke Detector
Rate of Rise Heat Detector
Fixed Temperatur Heat Detector
Alarm Bell
Manual Push Button
MCFA 4 Zone

Merk : Clipsal
Merk : Clipsal
Merk : Clipsal
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Mitsubishi/Panasonic
Merk : Mitsubishi/Panasonic
Merk : Mitsubishi/Panasonic
Merk : Mitsubishi/Panasonic
Merk : Mitsubishi/Panasonic
Merk : Mitsubishi/Panasonic
Merk : TATA
Merk : TATA
Merk : TATA
Merk : Panasonic
Merk : Supreme
Merk : Supreme
Merk : Panasonic
Merk : Simplex
Merk : Simplex
Merk : Simplex
Merk : Simplex
Merk : Simplex
Merk : Panasonic

286

Anunciator

Merk : Panasonic

No.
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317

JENIS MATERIAL
Kabel NYY 4Cx25 Sqmm
Kabel NYA 1Cx16 Sqmm
Kabel NYFGBY 4Cx50 Sqmm
TB - TP 20 pairs
MDF - TP 80 pairs
PABX 6 / 36
Kabel Stel - K 20 x 2 x 0,6 mm2
Lampu Indicator
Kabel NYM 3 x 2,5 mm
Kabel NYA 2 x 1,5 mm
MDF - Fa 40 pairs
Outlet Data
HUB / Switch 24 ports
Pantch Panel HUB / Switch 8 ports
Rack 8U
Kabel UTP Cat 6
Ceiling Speaker 3 w
Volume Kontrol
TB - TS. 10 pairs
Pre Recorder Evaluation
Compact Dist / MP3 Player
SM / FM Tuner
Emergency Microphone
Mixer Pre - Amplifier
Equalizer
Power Amplifier 1 x 240 w
Rack
MDF - SS 20 Pairs
Kabel NYMHY 3 x 2,5 mm2
SPLIT WALL 1 PK Wall mounted type
SPLIT WALL 2,5 PK Wall mounted type

SPESIFIKASI
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Supreme
Merk : Panasonic
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Supreme
Merk : TOA
Merk : TOA
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Supreme
Merk : DAIKIN
Merk : DAIKIN

No.
318
319
320
321

JENIS MATERIAL
SPLIT WALL 3 PK Wall cassette type
SPLIT WALL 4 PK Wall cassette type
SPLIT WALL 3/4 PK Wall mounted type
SPLIT WALL 5 PK Wall mounted type

SPESIFIKASI
Merk :
Merk :
Merk :
Merk :

DAIKIN
DAIKIN
DAIKIN
DAIKIN

SPESIFIKASI MATERIAL/BAHAN
SPESIFIKASI TEKNIS/MERK

Lokal, Memenuhi PUBI 82 dan Peraturan Beton 1969


Lokal, Memenuhi PUBI 82 dan Peraturan Beton 1969
Lokal, Memenuhi PUBI 82 dan Peraturan Beton 1969
Lokal, Memenuhi PUBI 82 dan Peraturan Beton 1969
Lokal, Memenuhi PUBI 82 dan Peraturan Beton 1969
Lokal, Memenuhi PUBI 82 dan Peraturan Beton 1969
Lokal, Memenuhi PUBI 82 dan Peraturan Beton 1969
Lokal, Produksi Palimanan
Lokal, Produksi Palimanan
Lokal, Pres Mesin uk. 20 x 10 x 5 cm
Lokal, Manual, uk. 20 x 10 x 5 cm
Merk : Celcon
Merk : Celcon
Merk : Celcon
Merk : Mortar Utama
Merk : Mortar Utama
Merk : Mortar Utama
Merk : Mortar Utama
Merk ; tiga Roda
Merk : Dua Gunung
Merk : Dua Gunung
Produksi : Betamix
Produksi : Betamix

SPESIFIKASI TEKNIS/MERK
Produksi
Produksi
Produksi
Produksi
Produksi
Produksi

: Betamix
: Betamix
: Betamix
: Betamix
: Betamix
: JHS/ WIKA

Merk : ICI
Merk : Sanlex
Merk : Vinilex
Merk : Pentalite
Merk : ICI
Merk : Lokal
Merk : Lokal
Merk : Lokal
Merk : Danaglos
Merk : Lokal
Merk : Lokal
Merk : Matahari
Merk : Kucing
Merk : Kucing
Merk : Penta
Merk : Kucing
Merk : Kucing
Merk : Kucing
Merk : Kucing
Merk : Danagloss
Merk : Danagloss
Merk : Kucing

SPESIFIKASI TEKNIS/MERK
Merk : Kucing
Merk : Kucing
Merk : Kucing
Merk : Kucing
Merk : Pamatex
Merk : Gentong
Merk : Avian
Merk : Decolux
Merk : Avian
Merk : Decolux
Merk : Gentong
Merk : Pertamina
Merk : Pertamina
Merk : Pertamina
Merk : Pertamina
Merk : No Drop
Merk : aqua Prof

Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal

: Albasiah
: Maranti
: Maranti
: Mahoni
: Mahoni
: Terentang
: Borneo Super
: Borneo Super
: Banjar
: Banjar
: Kamper Oven

SPESIFIKASI TEKNIS/MERK
Lokal : Kamper Oven
Lokal : Kayu Hutan
Lokal : Kayu Hutan
Lokal : Kamper
Kayu Kamper
Kayu Kamper
Kayu Kamper
Kayu Kamper
Merk : Star wall

Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Formika

Merk : GRC Board


Merk : Jayaboard
Merk : Jayaboard
Merk : Jayaboard
Merk : Jaya Cornice

SPESIFIKASI TEKNIS/MERK
Merk : Roman
Merk : Roman
Merk : Roman
Merk : Roman
Merk : Granito (Salsa)
Merk : Roman
Merk : Granito
Merk : Roman
Merk : Roman

Merk : Lokal
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Tube
Merk : Fox
Merk : AICA

SPESIFIKASI TEKNIS/MERK

Merk : Krakatau Steel/Cakra


Merk : Krakatau Steel/Cakra
Merk : Krakatau Steel/Cakra
Merk : Krakatau Steel/Cakra
Merk : Krakatau Steel/Cakra
Merk : Krakatau Steel/Cakra
Merk : Krakatau Steel/Cakra
Merk : Krakatau Steel/Cakra
Merk : Lionmesh
Merk : Lionmesh
Merk : Lionmesh
Merk : Lionmesh
Produksi : Jainindo Metal
Produksi : Jainindo Metal
Produksi : Jainindo Metal
Produksi : Jainindo Metal
Produksi : Jainindo Metal
Merk : Polyster
Merk : Nikko
Merk : Metal Puting
Produksi : JSS/Garuda
Merk : Alexindo
Merk : Alexindo
Merk : Alexindo
Merk : G-Seal
Merk : G-Seal
Merk : G-Seal
Merk : G-Seal

SPESIFIKASI TEKNIS/MERK
Merk : YKK
Merk : YKK
Merk : YKK

Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas

SPESIFIKASI TEKNIS/MERK

Produksi : Krakatau Steel/ Garuda


Produksi : Krakatau Steel/ Garuda
Merk : Jaya Screw
Merk : Jaya Screw
Produksi : Krakatau Steel/ Garuda
Produksi : Krakatau Steel/ Garuda
Produksi : Krakatau Steel/ Garuda
Produksi : Krakatau Steel/ Garuda

Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : Asahimas

Merk : Dekson

SPESIFIKASI TEKNIS/MERK
Merk : ALFA
Merk : Dekson
Merk : Unilon
Merk : Unilon
Merk : Unilon
Merk : Unilon
Merk : ALFA
Merk : ALFA
Merk : ALFA
Merk : Dekson
Merk : Dekson
Merk : ALFA

Produksi : Bakrie Pipe Industri


Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri

SPESIFIKASI TEKNIS/MERK
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri

Merk : Philips
Merk : Philips
Merk : Philips
Merk : Philips
Merk : Philips
Merk : Broco
Merk : Broco
Merk : Broco
Merk : Broco
Merk : Broco
Merk : Broco
Merk : Broco
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Merk : Clipsal
Merk : Clipsal
Merk : Tray Tek
Merk : Tray Tek
Merk : Tray Tek
Merk : Tray Tek
Merk : Clipsal
Merk : Clipsal
Merk : Clipsal

SPESIFIKASI TEKNIS/MERK
Merk : Clipsal
Merk : Clipsal
Merk : Clipsal
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Mitsubishi/Panasonic
Merk : Mitsubishi/Panasonic
Merk : Mitsubishi/Panasonic
Merk : Mitsubishi/Panasonic
Merk : Mitsubishi/Panasonic
Merk : Mitsubishi/Panasonic
Merk : TATA
Merk : TATA
Merk : TATA
Merk : Panasonic
Merk : Supreme
Merk : Supreme
Merk : Panasonic
Merk : Simplex
Merk : Simplex
Merk : Simplex
Merk : Simplex
Merk : Simplex
Merk : Panasonic
Merk : Panasonic

SPESIFIKASI TEKNIS/MERK
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Supreme
Merk : Panasonic
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Supreme
Merk : TOA
Merk : TOA
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Supreme
Merk : DAIKIN
Merk : DAIKIN

SPESIFIKASI TEKNIS/MERK
Merk :
Merk :
Merk :
Merk :

DAIKIN
DAIKIN
DAIKIN
DAIKIN

HAN
SATUAN

Galian Tambang Pasir


Pasir Putih/Bangka
Pecahan Stone Crusher
Pecahan Stone Crusher
Pecahan Stone Crusher
Pecahan Stone Crusher
Pecahan Stone Crusher
Pecahan Stone Crusher
Pecahan Stone Crusher

Mulus, rata, Tidak Cacat


Mulus, rata, Tidak Cacat
Mulus, rata, Tidak Cacat
Sesuai Stander SNI
Sesuai Stander SNI
Sesuai Stander SNI
Sesuai Stander SNI
Sesuai Stander SNI
Sesuai Stander SNI
Sesuai Stander SNI

SATUAN

Sesuai Standar SNI

Kualitas Baik
Kualitas Baik
Kualitas Baik
Sesuai Standar SNI

Daya Rekat tinggi, Kualitas Baik


Sesuai Standar SNI
Sesuai Standar SNI

SATUAN

Kualitas baik, Sesuai standar SNI


Kualitas baik, Sesuai standar SNI
Kualitas baik, Sesuai standar SNI
Kualitas baik, Sesuai standar SNI
Kualitas baik, Sesuai standar SNI
Kualitas baik, Sesuai standar SNI
Kualitas baik, Sesuai standar SNI

Kualiatas Baik
Kualitas baik, Sesuai standar SNI
Kualitas baik, Sesuai standar SNI

Kualiatas Baik, Lurus, Potongan Somel


Kualiatas Baik, Lurus, Potongan Somel
Kualiatas Baik, Lurus, Potongan Somel
Kualiatas Baik, Lurus, Potongan Somel
Kualiatas Baik, Lurus, Potongan Somel
Kualiatas Baik, Lurus, Potongan Somel
Kualiatas Baik, Lurus, Potongan Somel
Kualiatas Baik, Lurus, Potongan Somel
Kualiatas Baik, Lurus, Potongan Somel
Kualiatas Baik, Lurus, Potongan Somel
Kualiatas Baik, Lurus, Potongan Somel, Untuk Pintu

SATUAN
Kualiatas Baik, Lurus, Potongan Somel, Untuk Pintu

Kualiatas Baik, Lurus, Profil Mesin


Kualiatas Baik, Lurus, Profil Mesin
Kualiatas Baik, Lurus, Profil Mesin
Kualiatas Baik, Lurus, Profil Mesin
Kualitas Baik

Kualitas Baik, Tidak Cacat, Standar SNI


Kualitas Baik, Tidak Cacat, Standar SNI
Kualitas Baik, Tidak Cacat, Standar SNI
Kualitas Baik, Tidak Cacat, Standar SNI
Kualitas Baik, Tidak Cacat, Standar SNI
Kualitas Baik, Tidak Cacat, Standar SNI
Kualitas Baik, Tidak Cacat, Standar SNI
Kualitas Baik, Tidak Cacat, Standar SNI

Kualitas Baik, Tidak Cacat, Standar SNI


Kualitas Baik, Tidak Cacat, Standar SNI
Kualitas Baik, Tidak Cacat, Standar SNI
Kualitas Baik, Tidak Cacat, Standar SNI
Kualitas Baik, Tidak Cacat, Standar SNI
Kualitas Baik, Tidak Cacat, Standar SNI

SATUAN
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI

Kualitas Baik, Standar SNI


Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik

SATUAN

Sesuai Standar SNI


Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Kualitas Baik, Sesuai standar SNI
Kualitas Baik, Sesuai standar SNI
Kualitas Baik, Sesuai standar SNI
Kualitas Baik, Sesuai standar SNI
Kualitas Baik, Sesuai standar SNI
Kualitas Baik, Sesuai standar SNI

Kualitas Baik, Sesuai standar SNI


Kualitas Baik, Sesuai standar SNI
Kualitas Baik, Sesuai standar SNI

SATUAN
Kualitas Baik, Sesuai standar SNI
Kualitas Baik, Sesuai standar SNI
Kualitas Baik, Sesuai standar SNI

Kualitas Baik, Sesuai standar SNI


Kualitas Baik, Sesuai standar SNI
Kualitas Baik, Sesuai standar SNI
Kualitas Baik, Sesuai standar SNI
Kualitas Baik, Sesuai standar SNI
Kualitas Baik, Sesuai standar SNI
Kualitas Baik, Sesuai standar SNI
Kualitas Baik, Sesuai standar SNI
Kualitas Baik, Sesuai standar SNI

SATUAN

Kualiatas Baik, Baru, Tidak Cacat


Kualiatas Baik, Baru, Tidak Cacat
Kualiatas Baik, Baru, Tidak Cacat
Kualiatas Baik, Baru, Tidak Cacat
Kualiatas Baik, Baru, Tidak Cacat
Kualiatas Baik, Baru, Tidak Cacat
Kualiatas Baik, Baru, Tidak Cacat
Kualiatas Baik, Baru, Tidak Cacat
Kualiatas Baik, Baru, Tidak Cacat
Kualiatas Baik, Baru, Tidak Cacat
Kualiatas Baik, Baru, Tidak Cacat
Kualiatas Baik, Baru, Tidak Cacat
Kualiatas Baik, Baru, Tidak Cacat
Kualiatas Baik, Baru, Tidak Cacat
Kualiatas Baik, Baru, Tidak Cacat
Kualiatas Baik, Baru, Tidak Cacat

Kualiatas Baik

SATUAN
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik

Sesuai Standar SNI


Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI

SATUAN
Sesuai Standar SNI
Sesuai Standar SNI

Lengkap dengan Sarang


Lengkap dengan Sarang
Lengkap dengan Sarang
Lengkap dengan Sarang
Lengkap dengan Sarang
Lengkap dengan Sarang
Lengkap dengan Sarang
Lengkap dengan Sarang
Lengkap dengan Sarang
Lengkap dengan Sarang
Lengkap dengan Sarang
Lengkap dengan Sarang
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI

SATUAN
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru

SATUAN
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru

SATUAN
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru

#REF!

#REF!