Rab BPPT
Rab BPPT
A.
B.
C.
D.
E.
F.
G.
URAIAN PEKERJAAN
RAB
RAB
RAB
RAB
RAB
RAB
RAB
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
SAT
VOLUME
H.SATUAN
PERSIAPAN
STRUKTUR
ARSITEKTUR
FAADE
MEKANIKAL & ELEKTRIKAL
BANGUNAN PENUNJANG
SITE DEVELOPMENT
SUB. JUMLAH TOTAL KONSTRUKSI
DIBULATKAN
PPN
#NAME?
JUMLAH BIAYA
JUMLAH BIAYA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,011,089,307.80
4,045,304,246.34
3,007,722,426.69
1,168,792,635.92
3,163,853,344.00
1,089,809,582.26
721,262,953.00
###
Rp
14,207,834,496.02
Rp
14,207,800,000.00
Rp
1,420,780,000.00
Rp
15,628,580,000.00
Direktur Utama
NO
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
VOLUME
SAT
HARGA
JUMLAH
PEKERJAAN PERSIAPAN
Pembersihan & Persiapan Lokasi
Pengukuran & Bouwplank
Pembuatan Direksi Keet
Pembuatan Barak Pekerja dan Gudang
Air Kerja + Listrik
Shop Drawing
Asbuilt Drawing
Perijinan Bangunan
Asuransi ( C.A.R, ASTEK, dll )
Telepon
Sewa Scafolding @450 set
Sewa Genset kap 100 kva (untuk penerangan)
Administrasi Proyek
Foto / Dokumentasi Proyek
Biaya House keeping + K3
Urugan tanah dan pemadatan area gedung
Penyambungan daya listrik (prov sum)
1,523.00
196.00
30.00
100.00
6.00
6.00
1.00
1.00
1.00
3.00
3.00
3.00
3.00
3.00
3.00
228.45
1.00
m2
m1
m2
m2
bln
bln
ls
ls
ls
bln
bln
bln
bln
bln
bln
m3
ls
16,150.00
78,801.00
954,836.56
654,064.10
11,196,000.00
2,799,000.00
4,000,000.00
186,600,000.00
55,980,000.00
1,399,500.00
9,330,000.00
4,665,000.00
2,332,500.00
933,000.00
3,732,000.00
55,900.00
466,500,000.00
24,596,450.00
15,444,996.00
28,645,096.80
65,406,410.00
67,176,000.00
16,794,000.00
4,000,000.00
186,600,000.00
55,980,000.00
4,198,500.00
27,990,000.00
13,995,000.00
6,997,500.00
2,799,000.00
11,196,000.00
12,770,355.00
466,500,000.00
1,011,089,307.80
NO
URAIAN PEKERJAAN
VOL.
PEKERJAAN STRUKTUR
I
II
1.00
68.00
19.45
2,189.01
138.90
0.81
3.85
13.58
0.80
120.00
3.20
0.12
0.40
6.00
192.00
1,600.00
1,600.00
160.00
82.39
9,509.06
625.60
178.80
1,490.00
NO
URAIAN PEKERJAAN
VOL.
- Bondex t=0,75 mm
1,490.00
16.50
3,291.67
132.00
3 Kolom baja
- K1 (H.300.300.10.15) pedestal ke lantai 2
- Base Plat t=25 mm
- Pelat Rib t=8 mm
- Angkur M22 L=755 mm
16,544.00
884.22
994.75
176.00
NO
URAIAN PEKERJAAN
4 Balok baja Lantai atap
- B1 (WF.150.75.5.7 + Asesoris)
- B2 (WF.200.100.5,5.8 + asesoris)
- B3 (WF.250.125.6.9 + asesoris)
- B4 (WF.300.150.6,5.9 + asesoris)
- B5 (WF.400.200.8.13+ asesoris)
- Pelat Rib t=8 mm
- Pelat Buhul t=12 mm
- Baut HTB M20 (A325)
III
VOL.
5,559.30
6,393.60
3,853.50
17,820.00
1,253.33
2,339.55
1,376.00
13.30
1,995.00
38.00
6 Balok Canopy
- B1 (WF.150.75.5.7 + Asesoris)
1,350.00
89.04
742.00
742.00
2 Kolom baja
- K2 (H.300.300.10.15) Lantai 1 Ke atap
- K3 (H.300.150.6,5.9) Lantai 1 Ke atap
- Base Plat t=25 mm
- Pelat Rib t=8 mm
- Baut M20 (HTB A.325)
6,392.00
2,936.00
353.25
457.81
80.00
5,239.80
355.20
4,404.00
9,504.00
702.89
1,149.62
692.00
NO
III
URAIAN PEKERJAAN
VOL.
5,470.08
756.00
4,091.47
530.05
290.70
279.40
233.40
110.00
NO
URAIAN PEKERJAAN
VOL.
36.00
576.00
860.00
860.00
54.00
742.00
TOTAL PEKER
SAT.
HARGA (Rp)
JUMLAH (Rp)
Ls
ttk
4,665,000.00
1,583,400.00
4,665,000.00
107,671,200.00
m3
kg
m2
m3
m3
m3
988,082.00
13,213.89
85,027.00
747,798.00
223,414.00
44,668.00
19,217,206.82
28,925,352.38
11,810,250.30
608,240.20
860,590.73
606,394.90
m3
kg
m2
m3
m3
m3
988,082.00
13,213.89
85,027.00
747,798.00
223,414.00
44,668.00
790,465.60
1,585,666.80
272,086.40
89,735.76
89,365.60
268,008.00
m3
m2
m2
m3
988,082.00
68,214.20
4,600.00
223,414.00
189,711,744.00
109,142,720.00
7,360,000.00
35,746,240.00
m3
kg
m2
988,082.00
13,213.89
85,027.00
81,403,135.57
125,651,738.50
53,192,891.20
Total I
779,668,032.76
988,082.00
68,214.20
176,669,061.60
101,639,158.00
m3
m2
SAT.
HARGA (Rp)
JUMLAH (Rp)
m2
209,727.40
312,493,826.00
m3
kg
m2
988,082.00
13,213.89
111,800.00
16,303,353.00
43,495,776.43
14,757,600.00
kg
kg
kg
bh
17,861.86
17,861.86
17,861.86
139,900.00
295,506,611.84
15,793,885.30
17,768,120.96
24,622,400.00
SAT.
HARGA (Rp)
JUMLAH (Rp)
kg
kg
kg
kg
kg
kg
kg
bh
17,861.86
17,861.86
17,861.86
17,861.86
17,861.86
17,861.86
17,861.86
46,600.00
99,299,438.30
114,201,588.10
68,830,677.51
318,298,345.20
22,386,822.86
41,788,736.00
64,121,600.00
m3
kg
m2
988,082.00
13,213.89
111,800.00
13,141,490.60
26,361,710.55
4,248,400.00
kg
46,600.00
62,910,000.00
Total II
1,854,638,602.23
m3
m2
m2
988,082.00
68,214.20
209,727.40
87,978,821.28
50,614,936.40
155,617,730.80
kg
kg
kg
kg
bh
17,861.86
17,861.86
17,861.86
17,861.86
46,600.00
114,173,009.12
52,442,420.96
6,309,702.05
8,177,373.85
3,728,000.00
kg
kg
kg
kg
kg
kg
kg
bh
17,861.86
17,861.86
17,861.86
17,861.86
17,861.86
17,861.86
17,861.86
46,600.00
93,592,574.03
6,344,532.67
78,663,631.44
169,759,117.44
12,554,904.91
20,534,294.34
32,247,200.00
SAT.
kg
kg
kg
kg
kg
kg
kg
bh
HARGA (Rp)
JUMLAH (Rp)
Total II
892,738,249.28
17,861.86
17,861.86
17,861.86
17,861.86
17,861.86
17,861.86
17,861.86
23,300.00
97,705,803.15
13,503,566.16
73,081,300.06
9,467,716.33
5,192,450.68
4,990,531.24
4,169,030.46
2,563,000.00
SAT.
HARGA (Rp)
JUMLAH (Rp)
bh
bh
20,900.00
18,600.00
752,400.00
10,713,600.00
m2
69,900.00
60,114,000.00
m2
m'
m2
209,727.40
69,900.00
69,900.00
180,365,564.00
3,774,600.00
51,865,800.00
Total III
518,259,362.07
4,045,304,246.34
NO
URAIAN PEKERJAAN
C. PEKERJAAN ARSITEKTUR
I
A.
1
2
3
4
5
6
7
B.
1
2
3
4
5
6
7
C.
3
4
NO
5
6
7
URAIAN PEKERJAAN
Pasang lintel 100 x 100 mm
Opening Kusen Pintu Jendela Aluminium : Plester Aci
Benangan Sudut Kolom, Dinding : Plester Aci
SUB JUMLAH I C.
JUMLAH BIAYA PEKERJAAN PASANGAN DINDING DAN PLESTERAN
II
A.
NO
6
URAIAN PEKERJAAN
TYPE PS (Pintu Shaft)
SUB JUMLAH II A.
B.
C.
NO
URAIAN PEKERJAAN
JUMLAH BIAYA PEKERJAAN KOSEN PINTU JENDELA
NO
URAIAN PEKERJAAN
III
A.
B.
1
NO
8
C.
1
URAIAN PEKERJAAN
Pasang Border ex Roman uk 170 x 300 mm, di bawah (Warna Hitam)
a. Toilet Wanita
b. Toilet Pria
NO
URAIAN PEKERJAAN
IV
A.
4
5
NO
URAIAN PEKERJAAN
g.
h.
i.
j.
k.
l.
m.
n.
o.
p.
q.
r.
s.
t.
u.
v.
w.
Tea Room
R. Makan
R. Staff (74 orang)
R. Kabid
R. Sekretaris
R. Direktur
R. Kabid
R. Sekretaris
R. Direktur
R. Staff (54 orang)
R. Tamu dan R. Sekretaris
R. Deputi
Toilet Wanita
Toilet Pria
Janitor
Pantry
Toilet
SUB JUMLAH IV A.
NO
B.
1
3
5
URAIAN PEKERJAAN
PEKERJAAN LANTAI DUA
Pas ceiling gypsum board 9 mm ex Jaya Board setara
lengkap rangka hollow 40/40 mm dan 20/40 mm + penggantung
a. R. Perpustakaan, Tea Room
b. R. Rapat
c. Koridor + Mushallah
d. Lobby
Pas ceiling Gypsum Tile 600 x 1200 mm
lengkap rangka hollow 40/40 mm dan 20/40 mm + penggantung
a. R. Staff ( 116 orang )
b. R. Kabid
c. R. Direktur
d. R. Sekretaris
e. R. Staff ( 56 orang )
f. R. B2PT
g. R. Kabid
h. R. Direktur
i. R. Sekretaris
Plafon Drop Ceiling, Gypsum Board 9 mm
a. Lobby
Pas ceiling gypsum Kalsiboard or GRC 4 mm
lengkap rangka hollow 40/40 mm dan 20/40 mm + penggantung
a. Toilet Wanita
b. Toilet Pria
c. Teras Belakang
Pasang List plafond (Profil Aluminium "U")
a. R. Perpustakaan, Tea Room
b. R. Rapat
c. Koridor + Mushallah
d. Lobby
e R. Staff ( 116 orang )
f. R. Kabid
g. R. Direktur
h. R. Sekretaris
i. R. Staff ( 56 orang )
j. R. B2PT
k. R. Kabid
l. R. Direktur
m. R. Sekretaris
n. Toilet Wanita
NO
URAIAN PEKERJAAN
o.
Toilet Pria
SUB JUMLAH IV B.
C.
SUB JUMLAH IV C.
JUMLAH BIAYA PEKERJAAN PASANGAN PLAFOND
PEKERJAAN PENGECATAN
A.
1
2
3
NO
B.
1
2
3
URAIAN PEKERJAAN
PEKERJAAN LANTAI DUA
Pengecatan dgn Cat Catylac setara
a. Dinding Tembok Bag. Dalam
Cat Plafond, setara Catylac
Cat Partisi ex Catylac , setara
SUB JUMLAH V B.
C.
2
3
SUB JUMLAH V C.
JUMLAH BIAYA PEKERJAAN PENGECATAN
VI
A.
1
PEKERJAAN SANITAIR
PEKERJAAN LANTAI SATU
2
3
4
5
6
8
9
10
11
12
13
14
15
B.
NO
1
2
3
4
5
6
8
9
10
11
12
URAIAN PEKERJAAN
Pas. Closet Duduk ex TOTO, Type CW 420J / SW420JP lengkap
a. Toilet Wanita
b. Toilet Pria
Pas Closet Jongkok ex Toto, Type CE9/TV150NWV12J
Pas. Floor Drain ex Toto TX 1 BN
Pas. Washtafel ex TOTO, Type L521V1A, lengkap Faucet (TX111LRYR)
Pas Urinoir U 57M ex TOTO
Pas Jet washer ex TOTO, Tyoe TX 403SN5
Pas Paper Holder ex TOTO, Type TS 116 SR
Pas Kaca Cermin 6 mm di bevel 25 mm, uk 1800 x 1000 mm
Pas Cove Lampu uk 200 x 1800 mm
Pas Kitchen Zink 1 Lubang, 1 Sayap ex Royal, lengkap kran Bebek
Kran Air di R. Wudhu ex TOTO, Type T 23 B13
NO
VII.
1
2
3
4
5
URAIAN PEKERJAAN
PEKERJAAN LAIN - LAIN
Pasang railing tangga dari Lt Satu - Lt Tiga
- Railing Pipa Hitam 2", finish cat
- Besi Hollow 40/40, 20/40 finish cat
- Railing Besi 20 mm
Pasang Railing Stainless Steel di Void
Screed Dak beton + Water Proofing Lantai Atap Dak Beton
Water Proofing Lantai, Toilet
Pasang Meja Beton Toilet uk 600 x 1800 mm, dan 600 x 1000 mm
a. Meja Beton K 175
b. Finish Keramik ex Roman Gol B, uk 300 x 300 mm
Meja Beton Dapur LT Satu ( 2 buah ), Lt Dua ( 1 buah )
a. Meja Beton K 175
b. Finish Keramik ex Roman Gol B, uk 300 x 300 mm
Dinding Finish Keramik ex Roman Gol. B, uk 300 x 300 mm
c.
JUMLAH BIAYA PEKERJAAN LAIN-LAIN
VOLUME
SAT
HARGA (Rp)
SATUAN
JUMLAH
991.770
129,571.00
128,504,630.67
1,983.540
1,983.540
39,152.00
23,436.00
68.000
m
m
m'
m'
m'
9,700.00
77,659,558.08
46,486,243.44
659,600.00
3.000
3.000
3.000
unit
unit
unit
2,332,500.00
2,332,500.00
466,500.00
6,997,500.00
6,997,500.00
1,399,500.00
523.125
132,244.74
69,180,531.11
337,885,063.30
963.910
129,571.00
124,894,782.61
1,927.820
1,927.820
64.000
m
m
m'
m'
m'
39,152.00
23,436.00
9,700.00
75,478,008.64
45,180,389.52
620,800.00
3.000
3.000
3.000
unit
unit
unit
2,332,500.00
2,332,500.00
466,500.00
6,997,500.00
6,997,500.00
1,399,500.00
415.260
132,244.74
54,915,951.92
316,484,432.69
595.994
129,571.00
77,223,538.57
1,191.988
1,191.988
m
m
39,152.00
23,436.00
46,668,714.18
27,935,430.77
VOLUME
48.000
SAT
m'
m'
m'
HARGA (Rp)
SATUAN
JUMLAH
9,700.00
465,600.00
152,293,283.52
806,662,779.50
17.000
7.200
1.935
3.870
3.000
1.000
0.820
BH
m'
m
m
bh
bh
m
3,112,931.25
133,686.91
643,700.00
116,600.00
41,900.00
228,500.00
121,200.00
52,919,831.28
962,545.75
1,245,559.50
451,242.00
125,700.00
228,500.00
99,384.00
2.000
7.000
1.720
3.440
3.000
1.000
0.420
BH
m
m
m
bh
bh
m
2,769,028.37
133,686.91
597,100.00
116,600.00
41,900.00
228,500.00
121,200.00
5,538,056.74
935,808.37
1,027,012.00
401,104.00
125,700.00
228,500.00
50,904.00
5.000
8.000
2.580
5.160
6.000
1.000
1.000
1.000
BH
m
m
m
bh
bh
m
set
4,002,897.28
133,686.91
643,700.00
116,600.00
41,900.00
228,500.00
121,200.00
69,900.00
20,014,486.40
1,069,495.28
1,660,746.00
601,656.00
251,400.00
228,500.00
121,200.00
69,900.00
3.000
BH
14,461,500.00
43,384,500.00
1.000
BH
7,230,700.00
7,230,700.00
VOLUME
1.000
SAT
bh
HARGA (Rp)
SATUAN
JUMLAH
2,332,500.00
2,332,500.00
131,420,074.42
11.000
7.200
1.935
3.870
3.000
1.000
0.820
BH
m'
m
m
bh
bh
m
3,112,931.25
133,686.91
643,700.00
116,600.00
41,900.00
228,500.00
121,200.00
34,242,243.77
962,545.75
1,245,559.50
451,242.00
125,700.00
228,500.00
99,384.00
4.000
7.000
1.720
3.440
3.000
1.000
0.420
BH
m
m
m
bh
bh
m
2,769,028.37
133,686.91
597,100.00
116,600.00
41,900.00
228,500.00
121,200.00
11,076,113.48
935,808.37
1,027,012.00
401,104.00
125,700.00
228,500.00
50,904.00
3.000
8.000
2.580
5.160
6.000
1.000
1.000
1.000
BH
m
m
m
bh
bh
m
set
4,002,897.28
133,686.91
643,700.00
116,600.00
41,900.00
228,500.00
121,200.00
69,900.00
12,008,691.84
1,069,495.28
1,660,746.00
601,656.00
251,400.00
228,500.00
121,200.00
69,900.00
4.000
BH
14,461,500.00
57,846,000.00
1.000
bh
2,332,500.00
2,332,500.00
117,505,549.09
2.00
unit
2,332,500.00
4,665,000.00
4,665,000.00
VOLUME
SAT
HARGA (Rp)
SATUAN
JUMLAH
253,590,623.52
VOLUME
SAT
HARGA (Rp)
SATUAN
JUMLAH
1,524.200
58.340
m
m
319,559.80
319,559.80
487,073,047.16
18,643,118.73
312.000
27.555
m'
m'
59,251.50
59,251.50
18,486,468.00
1,632,675.08
13.280
15.840
6.800
m
m
m
228,175.00
228,175.00
228,175.00
3,030,164.00
3,614,292.00
1,551,590.00
49.140
51.480
29.736
m
m
m
228,175.00
228,175.00
228,175.00
11,212,519.50
11,746,449.00
6,785,011.80
18.800
19.800
10.420
m'
m'
m'
77,839.74
77,839.74
77,839.74
1,463,387.11
1,541,226.85
811,090.09
18.800
19.800
10.420
m'
m'
m'
135,953.38
135,953.38
135,953.38
2,555,923.54
2,691,876.92
1,416,634.22
574,255,474.02
1,350.600
58.340
m
m
319,559.80
319,559.80
431,597,465.88
18,643,118.73
304.500
27.555
m'
m'
59,251.50
59,251.50
18,042,081.75
1,632,675.08
13.280
15.840
m
m
228,175.00
228,175.00
3,030,164.00
3,614,292.00
49.140
51.480
m
m
228,175.00
228,175.00
11,212,519.50
11,746,449.00
18.800
19.800
m'
m'
77,839.74
77,839.74
1,463,387.11
1,541,226.85
VOLUME
18.800
19.800
SAT
m'
m'
HARGA (Rp)
SATUAN
JUMLAH
135,953.38
135,953.38
2,555,923.54
2,691,876.92
507,771,180.38
16.480
319,559.80
5,266,345.50
23.000
m'
59,251.50
1,362,784.50
6,629,130.00
1,088,655,784.40
VOLUME
SAT
HARGA (Rp)
SATUAN
JUMLAH
164.00
40.80
11.300
10.000
7.400
58.100
13.000
9.600
m
m
m
m
m
m
m
m
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
19,093,683.60
4,750,135.92
1,315,601.37
1,164,249.00
861,544.26
6,764,286.69
1,513,523.70
1,117,679.04
370.730
50.880
15.800
35.640
51.810
17.270
35.000
331.450
23.000
64.520
m
m
m
m
m
m
m
m
m
m
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
43,162,203.18
5,923,698.91
1,839,513.42
4,149,383.44
6,031,974.07
2,010,658.02
4,074,871.50
38,589,033.11
2,677,772.70
7,511,734.55
19.000
30.600
45.200
m
m
m
135,200.00
135,200.00
645,994.00
2,568,800.00
4,137,120.00
29,198,928.80
13.280
15.840
56.200
6.400
5.500
7.000
m
m
m
m
m
m
106,126.90
106,126.90
106,126.90
106,126.90
106,126.90
106,126.90
1,409,365.23
1,681,050.10
5,964,331.78
679,212.16
583,697.95
742,888.30
108.30
26.10
16.00
14.00
11.70
32.00
m'
m'
m'
m'
m'
m'
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
2,915,111.10
702,533.70
430,672.00
376,838.00
314,928.90
861,344.00
VOLUME
14.70
13.00
87.10
52.71
17.20
24.00
53.55
17.85
24.20
117.60
22.12
35.00
18.900
19.800
11.530
10.000
11.150
SAT
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
HARGA (Rp)
SATUAN
JUMLAH
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
395,679.90
349,921.00
2,344,470.70
1,418,795.07
462,972.40
646,008.00
1,441,405.35
480,468.45
651,391.40
3,165,439.20
595,404.04
942,095.00
508,731.30
532,956.60
310,353.01
269,170.00
300,124.55
219,933,754.46
VOLUME
SAT
HARGA (Rp)
SATUAN
JUMLAH
34.70
52.30
106.700
123.800
m
m
m
m
116,424.90
116,424.90
116,424.90
116,424.90
4,039,944.03
6,089,022.27
12,422,536.83
14,413,402.62
575.300
51.000
34.020
17.500
291.400
17.000
51.900
35.000
17.300
m
m
m
m
m
m
m
m
m
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
116,424.90
66,979,244.97
5,937,669.90
3,960,775.10
2,037,435.75
33,926,215.86
1,979,223.30
6,042,452.31
4,074,871.50
2,014,150.77
4.000
135,200.00
540,800.00
13.280
15.840
56.200
m
m
m
106,126.90
106,126.90
106,126.90
1,409,365.23
1,681,050.10
5,964,331.78
23.60
30.00
76.80
70.60
134.00
52.50
23.40
17.70
72.70
17.40
53.10
23.70
17.70
18.900
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
26,917.00
635,241.20
807,510.00
2,067,225.60
1,900,340.20
3,606,878.00
1,413,142.50
629,857.80
476,430.90
1,956,865.90
468,355.80
1,429,292.70
637,932.90
476,430.90
508,731.30
VOLUME
19.800
SAT
m'
HARGA (Rp)
SATUAN
JUMLAH
26,917.00
532,956.60
191,059,684.62
37.000
116,424.90
4,307,721.30
18.000
m'
26,917.00
484,506.00
4,792,227.30
415,785,666.37
810.560
1,464.120
1,046.250
m
m
m
25,002.37
25,002.37
25,002.37
20,265,921.03
36,606,469.96
26,158,729.61
83,031,120.60
VOLUME
886.720
1,493.240
830.520
SAT
m
m
m
HARGA (Rp)
SATUAN
JUMLAH
25,002.37
25,002.37
25,002.37
22,170,101.53
37,334,538.98
20,764,968.33
80,269,608.84
595.994
28,678.37
17,092,136.45
136.800
37.000
m
m
25,002.37
25,002.37
3,420,324.22
925,087.69
21,437,548.36
184,738,277.80
2.000
2.000
1.000
2.000
9.000
5.000
3.000
7.000
7.000
2.000
2.000
1.000
1.000
1.000
2.000
1.000
set
set
set
set
Bh
bh
unit
unit
unit
unit
unit
unit
unit
unit
unit
bh
SUB JUMLAH VI A.
2,143,517.90
2,143,517.90
2,143,517.90
2,789,638.00
350,800.00
1,810,031.00
2,053,810.00
350,800.00
401,100.00
923,600.00
326,500.00
691,300.00
513,100.00
233,200.00
1,632,700.00
198,700.00
4,287,035.80
4,287,035.80
2,143,517.90
5,579,276.00
3,157,200.00
9,050,155.00
6,161,430.00
2,455,600.00
2,807,700.00
1,847,200.00
653,000.00
691,300.00
513,100.00
233,200.00
3,265,400.00
198,700.00
47,330,850.50
VOLUME
2.000
2.000
2.000
6.000
4.000
3.000
6.000
6.000
2.000
2.000
1.000
6.000
SAT
set
set
set
Bh
bh
unit
unit
unit
unit
unit
unit
bh
SUB JUMLAH VI B.
HARGA (Rp)
SATUAN
JUMLAH
2,143,517.90
2,143,517.90
2,789,638.00
350,800.00
1,810,031.00
2,053,810.00
350,800.00
401,100.00
923,600.00
326,500.00
1,632,700.00
213,000.00
4,287,035.80
4,287,035.80
5,579,276.00
2,104,800.00
7,240,124.00
6,161,430.00
2,104,800.00
2,406,600.00
1,847,200.00
653,000.00
1,632,700.00
1,278,000.00
39,582,001.60
86,912,852.10
VOLUME
SAT
HARGA (Rp)
SATUAN
JUMLAH
51.260
m'
629,700.00
32,278,422.00
20.000
1,678.600
29.120
m'
m
m
699,700.00
69,900.00
60,600.00
13,994,000.00
117,334,140.00
1,764,672.00
2.800
1.680
m'
m
419,800.00
228,175.00
1,175,440.00
383,334.00
5.700
3.420
5.580
m'
m
m
419,800.00
228,175.00
228,175.00
2,392,860.00
780,358.50
1,273,216.50
171,376,443.00
3,007,722,426.69
NO
URAIAN PEKERJAAN
D. PEKERJAAN FAADE
I.
2
3
4
5
6
JUMLA
II.
1
2
3
4
5
6
III.
1
2
3
4
5
6
7
NO
IV.
1
2
3
7
5
6
URAIAN PEKERJAAN
FAADE SAMPING KANAN (TAMPAK SAMPING KANAN)
Pasang cladding wall ex Alucopan atau setara, tb 4 mm PVDF
lengkap dengan rangka sesuai Gambar dan Spesifikasi
Pasang Jendela Aluminium Soft Pront, Kaca Panasap 8 mm, uk 5300 x 1700 mm,
lengkap asesories
Pasang Jendela Mati Aluminium Soft Pront, Kaca Panasap 8 mm, uk 600 x 2700
mm
Pas Ornamen Pipa 8"
Pasang lisplank ACP ex Alucopan t = 1.000 mm
Cat dinding luar (Weathershield ex Dulux)
NO
V.
1
2
3
4
5
6
URAIAN PEKERJAAN
FAADE BELAKANG (TAMPAK BELAKANG)
Pasang cladding wall ex Alucopan atau setara, tb 4 mm PVDF
lengkap dengan rangka sesuai Gambar dan Spesifikasi
Pasang Jendela Mati Aluminium Soft Pront, Kaca Panasap 8 mm, uk 600 x 2700
mm
Pasang Jendela Aluminium Soft Pront, Kaca Panasap 8 mm, uk 5300 x 1700 mm,
lengkap asesories
Pasang Jendela Aluminium Soft Pront, Kaca Panasap 8 mm, uk 8000 x 1700 mm,
lengkap asesories
Pasang lisplank ACP ex Alucopan t = 1.000 mm
Cat dinding luar (Weathershield ex Dulux)
Pas Ornamen Pipa 8"
VI.
1
2
3
4
5
6
7
D
VOLUME
SAT
HARGA (Rp)
SATUAN
JUMLAH
208.55
645,994.00
134,718,818.73
14.00
unit
1,058,000.00
14,812,000.00
8.00
unit
5,877,900.00
47,023,200.00
93.30
237.74
8.80
m
m
m'
645,994.00
28,678.37
163,200.00
60,271,240.20
6,818,081.72
1,436,160.00
265,079,500.65
180.70
645,994.00
116,731,115.80
75.20
2.00
43.70
10.64
81.84
m
unit
m
m
m
592,400.00
7,464,000.00
645,994.00
645,994.00
28,678.37
44,548,480.00
14,928,000.00
28,229,937.80
6,873,376.16
2,347,037.80
213,657,947.56
142.74
645,994.00
92,205,953.59
2.00
unit
8,967,000.00
17,934,000.00
6.00
unit
5,877,900.00
35,267,400.00
2.00
unit
1,058,000.00
2,116,000.00
43.30
199.17
7.70
m
m
m'
645,994.00
28,678.37
163,200.00
27,971,540.20
5,711,756.24
1,256,640.00
182,463,290.03
D
VOLUME
SAT
HARGA (Rp)
SATUAN
JUMLAH
139.43
645,994.00
90,070,943.42
2.00
unit
5,877,900.00
11,755,800.00
14.00
unit
1,058,000.00
14,812,000.00
4.40
31.60
143.35
m'
m
m
163,200.00
645,994.00
28,678.37
718,080.00
20,413,410.40
4,111,101.70
141,881,335.52
D
VOLUME
SAT
HARGA (Rp)
SATUAN
JUMLAH
245.73
645,994.00
158,740,105.62
2.00
unit
1,058,000.00
2,116,000.00
12.00
unit
5,877,900.00
70,534,800.00
2.00
unit
8,967,000.00
17,934,000.00
61.30
242.36
11.00
m
m
m'
645,994.00
28,678.37
163,200.00
39,599,432.20
6,950,489.75
1,795,200.00
24.79
2.00
297,670,027.57
645,994.00
16,014,191.26
daun
7,464,000.00
14,928,000.00
1.00
unit
8,549,000.00
8,549,000.00
16.06
606,400.00
9,738,784.00
4.00
unit
1,387,800.00
5,551,200.00
16.80
83.92
m
m
645,994.00
28,678.37
10,852,699.20
2,406,660.13
68,040,534.59
1,168,792,635.92
NO.
ITEM PEKERJAAN
Lantai Satu
AC SPLIT WALL MOUNTED
AC Split
- Kap. 7.000 Btu/h ( 3/4 Pk )
Type : Wall Mounted Series
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 3/4" dan 3/8"
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power + kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning
AC Split
286480882.xlsx - (6) AC
48
NO.
ITEM PEKERJAAN
-Kap. 9.000 Btu/h ( 1 Pk )
-Type : Wall Mounted Series
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 3/4" dan 3/8"
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power + kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning
AC Split
- Kap. 12.200 Btu/h ( 1,5 Pk )
Type : Wall Mounted Series
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 1/4" dan 1/2"
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power + kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning
AC Split
-Kap. 18.000 Btu/h ( 2 Pk )
-Type : Wall Mounted Series
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 1/4" dan 1/2"
286480882.xlsx - (6) AC
49
NO.
ITEM PEKERJAAN
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power + kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning
286480882.xlsx - (6) AC
50
NO.
ITEM PEKERJAAN
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 3/8" dan 3/4"
-
286480882.xlsx - (6) AC
51
NO.
ITEM PEKERJAAN
Lantai Dua
AC SPLIT WALL MOUNTED
AC Split
- Kap. 7.000 Btu/h ( 3/4 Pk )
Type : Wall Mounted Series
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 3/4" dan 3/8"
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power + kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning
AC Split
-Kap. 9.000 Btu/h ( 1 Pk )
-Type : Wall Mounted Series
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 3/4" dan 3/8"
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power + kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning
AC Split
- Kap. 12.200 Btu/h ( 1,5 Pk )
Type : Wall Mounted Series
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 1/4" dan 1/2"
- Pipa Air buangan (PVC) "AW" 25
286480882.xlsx - (6) AC
52
NO.
ITEM PEKERJAAN
- Kabel Power + kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning
AC Split
-Kap. 18.000 Btu/h ( 2 Pk )
-Type : Wall Mounted Series
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 1/4" dan 1/2"
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power + kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning
286480882.xlsx - (6) AC
53
NO.
ITEM PEKERJAAN
AC SPLIT CEILING CASET
1 AC Split
- Kap. 27.000 Btu/h ( 3 Pk )
Type : Ceiling Cassette
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 3/8" dan 5/8"
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power NYY 4 x 4 mm + pvc 20mm
- Kabel kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning
2 AC Split
- Kap. 35.000 Btu/h ( 3,5 Pk )
Type : Ceiling Cassette
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 3/8" dan 3/4"
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power NYY 4 x 4 mm + pvc 20mm
- Kabel kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
- Alat Batu dan Tes Comusioning
3 AC Split
- Kap. 39.500 Btu/h ( 4 Pk )
Type : Ceiling Cassette
Pekerjaan instalasi pipa Refrigern lengkap dengan
Isolasi Insoplex /Superloan
- Pipa dia 3/8" dan 3/4"
- Pipa Air buangan (PVC) "AW" 25
- Kabel Power NYY 4 x 4 mm + pvc 20mm
- Kabel kabel Kontrol NYM 3 x 2,5 mm + pvc 20mm
286480882.xlsx - (6) AC
54
NO.
ITEM PEKERJAAN
- Alat Batu dan Tes Comusioning
286480882.xlsx - (6) AC
55
ITEM PEKERJAAN
VOL
SAT
3.00
unit
45.00
3.00
75.00
3.00
m'
btg
m'
unit
LL MOUNTED
Mounted Series
286480882.xlsx - (6) AC
56
ITEM PEKERJAAN
VOL
SAT
8.00
unit
120.00
16.00
200.00
8.00
m'
btg
m'
unit
2.00
unit
30.00
m'
4.00
50.00
2.00
btg
m'
unit
1.00
unit
15.00
m'
tu/h ( 1,5 Pk )
286480882.xlsx - (6) AC
57
ITEM PEKERJAAN
VOL
SAT
2.00
25.00
1.00
btg
m'
unit
1.00
unit
15.00
2.00
15.00
15.00
1.00
m'
btg
m'
m'
unit
2.00
unit
30.00
m'
EILING CASET
tu/h ( 3,5 Pk )
286480882.xlsx - (6) AC
4.00
btg
30.00
m'
30.00
m'
2.00
unit
9.00
unit
58
ITEM PEKERJAAN
VOL
SAT
135.00
18.00
135.00
135.00
9.00
m'
btg
m'
m'
unit
286480882.xlsx - (6) AC
59
ITEM PEKERJAAN
VOL
SAT
0.00
unit
0.00
0.00
0.00
0.00
m'
btg
m'
unit
9.00
unit
135.00
18.00
225.00
9.00
m'
btg
m'
unit
0.00
unit
0.00
m'
0.00
btg
LL MOUNTED
Mounted Series
tu/h ( 1,5 Pk )
286480882.xlsx - (6) AC
60
ITEM PEKERJAAN
VOL
SAT
0.00
0.00
m'
unit
4.00
unit
60.00
8.00
100.00
4.00
m'
btg
m'
unit
286480882.xlsx - (6) AC
61
ITEM PEKERJAAN
VOL
SAT
6.00
unit
90.00
12.00
90.00
90.00
6.00
m'
btg
m'
m'
unit
0.00
unit
0.00
m'
0.00
btg
0.00
m'
0.00
unit
8.00
unit
120.00
16.00
m'
btg
120.00
m'
120.00
m'
EILING CASET
tu/h ( 3,5 Pk )
286480882.xlsx - (6) AC
62
ITEM PEKERJAAN
Tes Comusioning
286480882.xlsx - (6) AC
VOL
SAT
8.00
unit
63
RAB ADD
HARGA
SATUAN
JUMLAH HARGA
4,105,200.00
12,315,600.00
69,900.00
8,600.00
16,400.00
139,900.00
3,145,500.00
25,800.00
1,230,000.00
419,700.00
286480882.xlsx - (6) AC
64
RAB ADD
HARGA
SATUAN
JUMLAH HARGA
4,385,100.00
35,080,800.00
69,900.00
8,600.00
16,400.00
139,900.00
8,388,000.00
137,600.00
3,280,000.00
1,119,200.00
5,131,500.00
10,263,000.00
83,900.00
2,517,000.00
8,600.00
16,400.00
139,900.00
34,400.00
820,000.00
279,800.00
7,184,100.00
7,184,100.00
83,900.00
1,258,500.00
286480882.xlsx - (6) AC
65
RAB ADD
HARGA
SATUAN
JUMLAH HARGA
8,600.00
16,400.00
139,900.00
17,200.00
410,000.00
139,900.00
22,112,100.00
22,112,100.00
116,600.00
8,600.00
39,200.00
16,400.00
46,600.00
1,749,000.00
17,200.00
588,000.00
246,000.00
46,600.00
23,325,000.00
46,650,000.00
135,200.00
4,056,000.00
8,600.00
34,400.00
39,200.00
1,176,000.00
16,400.00
492,000.00
46,600.00
93,200.00
27,400,000.00
246,600,000.00
286480882.xlsx - (6) AC
66
RAB ADD
HARGA
SATUAN
135,200.00
8,600.00
39,200.00
16,400.00
46,600.00
Sub Total
JUMLAH HARGA
18,252,000.00
154,800.00
5,292,000.00
2,214,000.00
419,400.00
438,258,800.00
286480882.xlsx - (6) AC
67
RAB ADD
HARGA
SATUAN
JUMLAH HARGA
4,105,200.00
75,000.00
9,300.00
17,600.00
150,000.00
4,385,100.00
39,465,900.00
69,900.00
9,300.00
17,600.00
150,000.00
9,436,500.00
167,400.00
3,960,000.00
1,350,000.00
5,131,500.00
90,000.00
9,300.00
286480882.xlsx - (6) AC
68
RAB ADD
HARGA
SATUAN
JUMLAH HARGA
17,600.00
150,000.00
7,184,100.00
28,736,400.00
90,000.00
9,300.00
17,600.00
150,000.00
5,400,000.00
74,400.00
1,760,000.00
600,000.00
286480882.xlsx - (6) AC
69
RAB ADD
HARGA
SATUAN
JUMLAH HARGA
22,112,100.00
132,672,600.00
116,600.00
9,300.00
39,200.00
17,600.00
46,600.00
10,494,000.00
111,600.00
3,528,000.00
1,584,000.00
279,600.00
23,325,000.00
135,200.00
9,300.00
39,200.00
17,600.00
46,600.00
25,564,200.00
204,513,600.00
135,200.00
9,300.00
16,224,000.00
148,800.00
39,200.00
4,704,000.00
17,600.00
2,112,000.00
286480882.xlsx - (6) AC
70
RAB ADD
HARGA
SATUAN
46,600.00
Sub Total
TOTAL
JUMLAH HARGA
372,800.00
467,695,600.00
905,954,400.00
286480882.xlsx - (6) AC
71
NO.
ITEM PEKERJAAN
PEKERJAAN HYDRANT
Pengadaan dan pemasangan Alat Pemadam Kebakaran
Panel kontrol, Wiring, Pondasi
72
NO.
ITEM PEKERJAAN
Capacity : 15 USGPM
T. Head : 70 Meter
Power : 2,2 Kw/ 380 V / 3 Ph/ 50 Hz/ 2900 Rpm
Driven : Standart Manufacture
Sucht/Discht : 32 MM / 32 MM
C/W : Control Panel Mengacu NFPA-20 STANDART
4
1
3 - Tenki Solar
4 Accessories
Gate Valve
100
50
Check Valve
100
50
Flexible Join
100
50
Strainer = Fiter air dari tengki ke pompa
100
50
Foot Valve = Filter Air dari tenki ke pompa
100
50
Pressure Switch
286480882.xlsx - (7) HD
73
NO.
ITEM PEKERJAAN
Pressure Gauge
Pemipaan
- Pipa Black steel Sch 40 dia 100 mm
200 ( Pipa Header)
100
2. INSTALASI PIPA RISER
1 - Pipa Black steel Sch 40 dia 150 mm
2 - Fiting - fiting Matrial Bantu
Assesories
3 - Gate Valve dia 100 mm
4 - Automatic air vent dia 25 mm
286480882.xlsx - (7) HD
74
NO.
ITEM PEKERJAAN
Seamese Connection
100
Check Valve
100
Lengkap bak kontrol
Galian Tanah dan Urugan
4 Lantai Satu
Pekerjaan hydrant box
Pengadaan dan pemasangan pipa Black steel Sch 40 lengkap
peralatan fitting, penggantung dll.
100
65
Indoor hydrant box
Lengkap :
Fire hose 40 x 30 m
Hydrant Valve 40 , 65
Hnozzle 40 dan Hose rack
Accessories
Gate Valve
65
5 Lantai Dua
Pekerjaan hydrant box
Pengadaan dan pemasangan pipa Black steel Sch 40 lengkap
peralatan fitting, penggantung dll.
100
65
Indoor hydrant box
Lengkap :
Fire hose 40 x 30 m
286480882.xlsx - (7) HD
75
NO.
ITEM PEKERJAAN
Hydrant Valve 40 , 65
Gate Valve
65
286480882.xlsx - (7) HD
76
RAB ADD
VOL
SAT
Unit
223,360,200.00
223,360,200.00
Unit
110,840,400.00
110,840,400.00
Unit
29,856,000.00
29,856,000.00
HARGA SATUAN
286480882.xlsx - (7) HD
JUMLAH HARGA
77
RAB ADD
VOL
SAT
12.00
m'
340,800.00
4,089,600.00
12.00
m'
111,600.00
1,339,200.00
1.00
unit
5,131,500.00
5,131,500.00
4.00
bh
2,854,900.00
11,419,600.00
2.00
bh
1,833,300.00
3,666,600.00
2.00
bh
3,097,500.00
6,195,000.00
1.00
bh
1,614,000.00
1,614,000.00
4.00
bh
914,300.00
3,657,200.00
2.00
bh
429,100.00
858,200.00
2.00
bh
2,318,500.00
4,637,000.00
1.00
bh
1,103,700.00
1,103,700.00
2.00
bh
3,540,700.00
7,081,400.00
1.00
bh
1,334,100.00
1,334,100.00
1.00
bh
278,900.00
278,900.00
HARGA SATUAN
286480882.xlsx - (7) HD
JUMLAH HARGA
78
RAB ADD
VOL
SAT
6.00
bh
167,000.00
1,002,000.00
1.00
set
3,509,900.00
3,509,900.00
12.00
314,800.00
3,777,600.00
HARGA SATUAN
Sub 1
JUMLAH HARGA
424,752,100.00
1.00
set
3,509,900.00
3,509,900.00
12.00
314,800.00
3,777,600.00
3.00
bh
2,854,900.00
8,564,700.00
3.00
bh
797,700.00
2,393,100.00
Sub 2
18,245,300.00
265.00
450,600.00
119,409,000.00
4.00
bh
2,136,500.00
8,546,000.00
4.00
unit
2,047,900.00
8,191,600.00
286480882.xlsx - (7) HD
79
RAB ADD
VOL
SAT
1.00
unit
2,010,600.00
2,010,600.00
1.00
unit
3,097,500.00
3,097,500.00
265.00
11,100.00
2,941,500.00
49.00
450,600
22,079,400.00
6.00
265,000
1,590,000.00
2.00
unit
2,061,900.00
4,123,800.00
2.00
bh
2,145,900.00
4,291,800.00
55.00
6.00
2.00
unit
HARGA SATUAN
450,600
247,200.00
2,061,900
286480882.xlsx - (7) HD
JUMLAH HARGA
24,783,000.00
1,483,200.00
4,123,800.00
80
VOL
SAT
2.00
bh
RAB ADD
HARGA SATUAN
2,145,900
Sub 3
TOTAL PEK HYDRAN
286480882.xlsx - (7) HD
JUMLAH HARGA
4,291,800.00
210,963,000.00
653,960,400.00
81
NO.
ITEM PEKERJAAN
VOL
PEKERJAAN PLUMBING
1 PERALATAN UTAMA
2 Sumur Dangkal
Kap. : 40 L/m
Head : 30 m ( disesuaikan lapangan)
Type : Jet Pump
Daya : 5,5 kW ( disesuaikan lapangan)
1.00
1.00
4 Pompa Penguras
Type : Centrifugal and Section
Kap : 100 L/m
Head : 15 m
Daya : 0.4 kw
Kabel NYY 4 x 4mm + PVC 25mm
1.00
1.00
82
NO.
ITEM PEKERJAAN
VOL
286480882.xlsx - (8) PL
81.60
1.00
83
NO.
ITEM PEKERJAAN
2. INSTALASI PIPA AIR BERSIH
Instalasi Lantai Satu
Pipa air bersih PPR
50
40
20
Gate Valve dia 50 mm
Fiting - fiting Matrial Bantu
Instalasi Lantai Dua
Pipa air bersih PPR
50
40
20
Gate Valve dia 50 mm
Fiting - fiting Matrial Bantu
VOL
90.09
68.00
124.00
1.00
1.00
83.00
22.50
87.00
1.00
1.00
1.00
128.00
80
48.00
50
24.00
1.00
- Accessories
Clean Out 100
6.00
286480882.xlsx - (8) PL
84
NO.
ITEM PEKERJAAN
VOL
8.00
36.00
1.00
4 Lantai - Dua
Pipa Air Kotor & Bekas( PVC ) "AW"
100
80
50
Fitting & Material Bantu
286480882.xlsx - (8) PL
42.00
24.00
36.00
1.00
85
NO.
ITEM PEKERJAAN
- Accessories
Clean Out 100
Floor drain 50
Pipa vent ( PVC ) "D"
50
Fitting & Material Bantu
5 Lantai - Atap
Pipa air hujan ( PVC ) "AW"
100
Fitting dan Material Bantu
Roof Drain
100
VOL
6.00
8.00
24.00
1.00
184.00
1.00
23.00
286480882.xlsx - (8) PL
86
SAT
RAB ADD
HARGA SATUAN
JUMLAH HARGA
unit
22,205,400.00
22,205,400.00
set
63,444,000.00
63,444,000.00
unit
13,995,000.00
13,995,000.00
set
10,263,000.00
10,263,000.00
286480882.xlsx - (8) PL
87
SAT
RAB ADD
HARGA SATUAN
m'
lot
132,000.00
1,399,500.00
Sub 1
286480882.xlsx - (8) PL
JUMLAH HARGA
10,771,200.00
1,399,500.00
122,078,100.00
88
SAT
RAB ADD
HARGA SATUAN
JUMLAH HARGA
m'
m'
m'
bh
ls
132,000.00
87,200.00
26,500.00
376,900.00
1,632,700.00
11,891,880.00
5,929,600.00
3,286,000.00
376,900.00
1,632,700.00
m'
m'
m'
bh
ls
132,000.00
87,200.00
26,500.00
376,900.00
1,632,700.00
10,956,000.00
1,962,000.00
2,305,500.00
376,900.00
1,632,700.00
40,350,180.00
Sub 2
162,428,280.00
bh
41,891,700.00
41,891,700.00
m'
ls
96,300.00
58,200.00
29,800.00
419,800.00
12,326,400.00
2,793,600.00
715,200.00
419,800.00
bh
115,300.00
691,800.00
m'
m'
286480882.xlsx - (8) PL
89
SAT
RAB ADD
HARGA SATUAN
JUMLAH HARGA
bh
179,100.00
1,432,800.00
m'
ls
18,600.00
306,000.00
669,600.00
306,000.00
m'
m'
m'
ls
96,300.00
58,200.00
29,800.00
419,800.00
4,044,600.00
1,396,800.00
1,072,800.00
419,800.00
286480882.xlsx - (8) PL
90
SAT
RAB ADD
HARGA SATUAN
JUMLAH HARGA
bh
bh
115,300.00
179,100.00
691,800.00
1,432,800.00
m'
ls
18,600.00
306,000.00
446,400.00
306,000.00
m'
lot
96,300.00
1,539,400.00
17,719,200.00
1,539,400.00
bh
199,200.00
4,581,600.00
94,898,100.00
257,326,380.00
286480882.xlsx - (8) PL
91
NO.
ITEM PEKERJAAN
PEKERJAAN MEKANIKAL-ELEKTRIKAL
1
2
92
NO.
ITEM PEKERJAAN
7 Kabel dari PHB ke P.Distribusi AC Lt.1
8 Kabel dari PHB ke P.Distribusi AC Lt.2
3 INSTALASI PEMBUMIAN TEGANGAN RENDAH
1 BC 6 mm
2 BC 95 mm
3 Batang Pentanahan (Ground Rod)
4 Matrial Bantu/ Tes Comisioning
286480882.xlsx - (9) EL
93
NO.
ITEM PEKERJAAN
Lantai Dua
1 - Lampu TBS 299 TL5 - 4 x 14 w M2
2 - Lampu TCH 128 TKI TL5 - 1 x 28
3 - Down Liht SBH 031 PL-C 2 x 18 W
4 - Lam. Cover Acrylic Wastafel
5 - Lam. Cover Acrylic TL 5 Ecsesial - 1 x 14 w Tangga +Battery
6 - Sklar Tunggal 10 A
7 - Sklar Ganda 10 A
8 - Grid Switch 8 Gang
9 - Stop Kontak 16 A
10 - Instalasi Penerangan kabel 3 x 2,5mm + pvc 20 mm
11 - Instalasi Stop Kontak kabel 3 x 2,5 mm + pvc 20 mm
12 - Matrial Bantu
286480882.xlsx - (9) EL
94
NO.
ITEM PEKERJAAN
Site Plan
1
Kabel Instalasi lampu termasuk galian & urugan
2
- NYFGbY 4 x 6 mm2
3
- NYM 3 x 2,5 mm2
4
- Galian tanah dan urugan
5
Tiang Lampu Jalan GIP & Pondasi ( 5 ", 4, 3" ) 9 m
6
Lampu Jalan mercury 1 x 150 Watt
7
Lampu Taman lengkap lampu PL 25 W
8
Tiang lampu GIP 3",2" tinggi 2 m termasuk pondasi
9
Peralatan bantu instalasi
286480882.xlsx - (9) EL
95
NO.
ITEM PEKERJAAN
II
1
2
3
4
5
6
7
8
III
1
2
3
4
a
b
c
d
e
g
h
286480882.xlsx - (9) EL
96
NO.
ITEM PEKERJAAN
a
b
c
d
e
f
g
Lantai 2
Smoke Detector
ROR
Alarm Bell
Indicator Lamp
Manual push button
Instalasi fire alarm
Material bantu
5
a
b
6
286480882.xlsx - (9) EL
97
NO.
ITEM PEKERJAAN
IV
1.
1.1
a
b
d
e
f
g
h
i
j
Peralatan Utama
Paging system
Emergency microphone
AM/FM Tuner
CD Player
Free Recorder Evacuation
Mixer Free Amplifier
Equalizer
Zone Selector
MDF TS
Cabinet rack
2
a
c
d
e
f
a
c
d
e
f
Lantai 2
Ceilling speaker ( 3 Watt )
Volume Control
Instalasi speaker
Terminal box TS/JBSS
Material bantu
3
4
286480882.xlsx - (9) EL
98
NO.
1
ITEM PEKERJAAN
PABX SYSTEM
Type
: TDA 600
Kapasitas : 8Line / 48 Extention Expandable
1 Buah Card KX-TDA 0181 XJ
1 Buah Card KX-TDA 0484 ( 4 Channal VOIP Gabeway Card)
1 Buah Power Suplay KX -TDA 0103X
2 Buah Pesawat Telp KX -DT333
Key Telp display handsfree
Conector
1 T 100
: Terminal Box MDF
2 Instalasi dari Rumah Kabel s/d MDF ;
( Jelly Armoured Cable 20 x 2 x 0,8 mm ) + Sparing PVC 4" + Galian
3 Kabel dari MDF - PABX ke :
- SDF - 3 : ITC 50 X 2 pair x 0,6 mm
286480882.xlsx - (9) EL
99
NO.
ITEM PEKERJAAN
Lantai 1
Terminal Box Telepon
Extention Telepon/Outlet Telepon
Instalasi Telepon
Kabel ITC 10x2x0,6mm2
Material Bantu
Kabel ITC 30x2x0,6mm2
Lantai 2
Terminal Box Telepon
Extention Telepon/Outlet Telepon
Instalasi Telepon
Kabel ITC 10x2x0,6mm2
Material Bantu
Kabel ITC 30x2x0,6mm2
TOTAL PEK. TELEPHONE
VI
1
PEKERJAAN CCTV
Peralatan Utama
Pengadaan pemasangan dan pengujian seluruh
peralatan utama CCTV lengkap dengan Main Box
dan assesories lainya sesuai gambar rencana dan
spesifikasi teknis
1 Digital Video Recording (DVR) 4 ch MPEG4 Network Backup
Harddisk seagate SATA 500 GB
2 LCD CCTV Monitor 15'
UPS 0,5 KVA
Cabinet Rack utk CCTV
Instalasi Lantai 1
3 Lantai Satu
1/3" color Dome Camerawith lens f3.6mm 420 TVL 0.3 lux/F2.0
Instalasi CCTV Kabel RG 6/SA + Connector
Instalasi Power Supplay unit, input 220 VAC output 24 VDC 750mA
Camera mounting bracket for CCD, wall or ceiling type
286480882.xlsx - (9) EL
100
NO.
ITEM PEKERJAAN
3 Lantai Dua
1/3" color Dome Camerawith lens f3.6mm 420 TVL 0.3 lux/F2.0
Instalasi CCTV Kabel RG 6/SA + Connector
Instalasi Power Supplay unit, input 220 VAC output 24 VDC 750mA
Camera mounting bracket for CCD, wall or ceiling type
TOTAL PEK. CCTV
VII
a
b
c
d
d
e
f
d
e
f
Lantai 2
Switch 24 port UTP10/100/1000Mbps managable
Rack temperet glass door termasuk Roof mounted
fan wall mounted
Face platekit single port+AMP modularJack
Instalasi kabel data menggunakan UTP cat 6
dalam conduit pipa HI
Patch Cord UTP cat 6 7f
Patch Panel 24 port Unshielded cat 6
Material bantu
Kabel Raiser
UTP Cable cat 6 (dari Switch ke server)
a
b
c
d
286480882.xlsx - (9) EL
101
NO.
b
c
ITEM PEKERJAAN
UTP Cable cat 6 (dari Switch ke swich)
Labeling,Testing
TOTAL PEK. INSTALASI KABEL DATA
TOTAL
286480882.xlsx - (9) EL
102
EM PEKERJAAN
VOL
SAT
164.50
RAB ADD
HARGA SATUAN
513,100.00
an seluruh panel
rbagai jenis CB,
lengkap dengan
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
unit
unit
unit
unit
unit
unit
unit
unit
88,676,900.00
39,394,900.00
9,531,900.00
9,531,900.00
7,794,700.00
18,388,000.00
18,388,000.00
13,848,000.00
Sub .1
an seluruh pekerjaaan
gkap dengan pe -
esua gambar
:
:
:
:
:
:
NYY 4 x 150 mm
NYFGBY 4 x 150 mm
NYY 4 x 10 mm
NYY 4 x 25 mm
NYY 4 x 10 mm
NYY 4 x 10 mm
12.00
78.00
18.00
12.00
8.00
14.00
286480882.xlsx - (9) EL
m'
m'
m'
m'
m'
m'
853,200.00
968,400.00
74,400.00
169,400.00
74,400.00
74,400.00
103
EM PEKERJAAN
: NYY 4 x 25 mm
: NYY 4 x 25 mm
VOL
SAT
RAB ADD
HARGA SATUAN
8.00
14.00
m'
m'
169,400.00
169,400.00
Sub .2
120.00
32.00
12.00
1.00
m'
m'
bh
ls
10,800.00
137,100.00
349,800.00
3,498,700.00
Sub .3
AN RENDAH
286480882.xlsx - (9) EL
104
EM PEKERJAAN
VOL
SAT
RAB ADD
HARGA SATUAN
x 14 w Tangga +Battery
mm + pvc 20 mm
mm + pvc 20 mm
x 14 w Tangga +Battery
mm + pvc 20 mm
mm + pvc 20 mm
117.00
0.00
49.00
2.00
2.00
20.00
8.00
2.00
45.00
170.00
45.00
1.00
bh
bh
bh
bh
bh
bh
bh
bh
bh
titik
titik
ls
308,500.00
332,200.00
639,600.00
25,500.00
27,900.00
895,600.00
43,000.00
279,900.00
303,200.00
2,565,700.00
144.00
28.00
43.00
2.00
2.00
19.00
9.00
3.00
50.00
219.00
50.00
1.00
bh
bh
bh
bh
bh
bh
bh
bh
bh
titik
titik
ls
726,300.00
247,600.00
308,500.00
332,200.00
639,600.00
25,500.00
27,900.00
895,600.00
43,000.00
279,900.00
303,200.00
2,565,700.00
286480882.xlsx - (9) EL
726,300.00
105
EM PEKERJAAN
i ( 5 ", 4, 3" ) 9 m
m termasuk pondasi
VOL
SAT
360.00
104.00
360.00
5.00
5.00
11.00
11.00
1.00
224.00
2.00
6.00
14.00
1.00
286480882.xlsx - (9) EL
RAB ADD
HARGA SATUAN
m'
m'
m'
btg
bh
bh
btg
ls
47,500.00
16,400.00
12,400.00
1,772,700.00
1,492,800.00
1,166,200.00
699,700.00
5,395,300.00
Sub .4
m'
bh
247,200.00
135,200.00
153,900.00
138,700.00
1,632,700.00
Sub .5
bh
ls
106
EM PEKERJAAN
VOL
SAT
RAB ADD
HARGA SATUAN
rencana dan
1.00
42.00
1.00
12.00
8.00
1.00
1.00
1.00
unit
m'
bh
m'
bh
bh
bh
bh
18,286,800.00
443,100.00
447,800.00
326,500.00
10,700.00
10,700.00
88,600.00
349,800.00
unit
20,152,000.00
1
2
unit
bh
7,815,000.00
607,400.00
17.00
26.00
2.00
2.00
2.00
43.00
1.00
bh
bh
bh
bh
bh
ttk
ls
326,600.00
129,000.00
273,900.00
91,600.00
105,800.00
253,700.00
971,300.00
286480882.xlsx - (9) EL
107
EM PEKERJAAN
pompa.,Tata suara
RAB ADD
VOL
SAT
18.00
25.00
2.00
2.00
2.00
43.00
1.00
bh
bh
bh
bh
bh
ttk
ls
326,600.00
129,000.00
273,900.00
91,600.00
105,800.00
253,700.00
1,055,500.00
88.00
1.00
1.00
m
ls
ls
99,800.00
311,800.00
1,871,100.00
286480882.xlsx - (9) EL
HARGA SATUAN
108
EM PEKERJAAN
RAB ADD
VOL
SAT
1
1
1
1
1
1
1
1
1
bh
bh
bh
bh
bh
bh
bh
bh
bh
1,869,800.00
3,234,400.00
3,578,700.00
7,237,900.00
8,387,700.00
5,559,200.00
2,513,100.00
3,879,800.00
4,969,800.00
23.00
3.00
23.00
1.00
1.00
bh
bh
ttk
bh
ls
76,400.00
160,300.00
253,700.00
502,600.00
416,100.00
25.00
2.00
25.00
1.00
1.00
bh
bh
ttk
bh
ls
76,400.00
160,300.00
253,700.00
502,600.00
534,900.00
m
ls
75,000.00
1,871,100.00
80
1
286480882.xlsx - (9) EL
HARGA SATUAN
109
EM PEKERJAAN
VOL
SAT
unit
RAB ADD
HARGA SATUAN
63,817,200.00
80.94
m'
38,100.00
12.00
m'
58,900.00
286480882.xlsx - (9) EL
110
EM PEKERJAAN
RAB ADD
VOL
SAT
1.00
16.00
16.00
50.00
1.00
bh
ttk
ttk
m
ls
419,800.00
38,100.00
218,200.00
7,700.00
100,000.00
1.00
19.00
19.00
50
1
bh
ttk
ttk
m
ls
419,800.00
38,100.00
218,200.00
7,700.00
151,200.00
1.00
set
24,435,200.00
1.00
1.00
1.00
set
unit
set
6,335,000.00
7,277,400.00
4,198,500.00
bh
titik
bh
bh
1,991,000.00
326,500.00
209,900.00
80,200.00
HARGA SATUAN
rencana dan
10.00
10.00
2.00
1.00
286480882.xlsx - (9) EL
111
EM PEKERJAAN
VOL
SAT
6.00
6.00
2.00
1.00
bh
titik
bh
bh
RAB ADD
HARGA SATUAN
1,991,000.00
326,500.00
209,900.00
80,200.00
Mbps managable
suk Roof mounted
an UTP Cat 6
Mbps managable
suk Roof mounted
an UTP cat 6
1.00
1.00
bh
bh
16,327,500.00
3,727,900.00
12.00
20.00
bh
ttk
68,900.00
733,200.00
12.00
1.00
1.00
bh
bh
ls
417,500.00
1,975,800.00
802,500.00
1.00
1.00
bh
bh
16,327,500.00
3,727,900.00
11.00
20.00
bh
ttk
68,900.00
733,200.00
11.00
1.00
1.00
bh
bh
ls
417,500.00
1,975,800.00
802,500.00
45.00
14,900.00
286480882.xlsx - (9) EL
112
EM PEKERJAAN
VOL
SAT
45.00
1.00
286480882.xlsx - (9) EL
m
Lot
RAB ADD
HARGA SATUAN
14,900.00
1,813,600.00
113
RAB ADD
JUMLAH HARGA
84,404,950.00
84,404,950.00
88,676,900.00
39,394,900.00
9,531,900.00
9,531,900.00
7,794,700.00
18,388,000.00
18,388,000.00
13,848,000.00
205,554,300.00
10,238,400.00
75,535,200.00
1,339,200.00
2,032,800.00
595,200.00
1,041,600.00
286480882.xlsx - (9) EL
114
RAB ADD
JUMLAH HARGA
1,355,200.00
2,371,600.00
94,509,200.00
1,296,000.00
4,387,200.00
4,197,600.00
3,498,700.00
13,379,500.00
286480882.xlsx - (9) EL
115
RAB ADD
JUMLAH HARGA
84,977,100.00
15,116,500.00
664,400.00
1,279,200.00
510,000.00
223,200.00
1,791,200.00
1,935,000.00
47,583,000.00
13,644,000.00
2,565,700.00
104,587,200.00
6,932,800.00
13,265,500.00
664,400.00
1,279,200.00
484,500.00
251,100.00
2,686,800.00
2,150,000.00
61,298,100.00
15,160,000.00
2,565,700.00
286480882.xlsx - (9) EL
116
RAB ADD
JUMLAH HARGA
17,100,000.00
1,705,600.00
4,464,000.00
8,863,500.00
7,464,000.00
12,828,200.00
7,696,700.00
5,395,300.00
447,131,900.00
55,372,800.00
270,400.00
923,400.00
1,941,800.00
1,632,700.00
60,141,100.00
820,716,000.00
286480882.xlsx - (9) EL
117
RAB ADD
JUMLAH HARGA
18,286,800.00
18,610,200.00
447,800.00
3,918,000.00
85,600.00
10,700.00
88,600.00
349,800.00
41,797,500.00
20,152,000.00
7,815,000.00
1,214,800.00
5,552,200.00
3,354,000.00
547,800.00
183,200.00
211,600.00
10,909,100.00
971,300.00
286480882.xlsx - (9) EL
118
RAB ADD
JUMLAH HARGA
5,878,800.00
3,225,000.00
547,800.00
183,200.00
211,600.00
10,909,100.00
1,055,500.00
8,782,400.00
311,800.00
1,871,100.00
83,887,300.00
286480882.xlsx - (9) EL
119
RAB ADD
JUMLAH HARGA
1,869,800.00
3,234,400.00
3,578,700.00
7,237,900.00
8,387,700.00
5,559,200.00
2,513,100.00
3,879,800.00
4,969,800.00
1,757,200.00
480,900.00
5,835,100.00
502,600.00
416,100.00
1,910,000.00
320,600.00
6,342,500.00
502,600.00
534,900.00
6,000,000.00
1,871,100.00
67,704,000.00
286480882.xlsx - (9) EL
120
RAB ADD
JUMLAH HARGA
63,817,200.00
3,083,814.00
706,800.00
286480882.xlsx - (9) EL
121
RAB ADD
JUMLAH HARGA
419,800.00
609,600.00
3,491,200.00
385,000.00
100,000.00
419,800.00
723,900.00
4,145,800.00
385,000.00
151,200.00
78,439,114.00
24,435,200.00
6,335,000.00
7,277,400.00
4,198,500.00
19,910,000.00
3,265,000.00
419,800.00
80,200.00
286480882.xlsx - (9) EL
122
RAB ADD
JUMLAH HARGA
11,946,000.00
1,959,000.00
419,800.00
80,200.00
80,326,100.00
16,327,500.00
3,727,900.00
826,800.00
14,664,000.00
5,010,000.00
1,975,800.00
802,500.00
16,327,500.00
3,727,900.00
757,900.00
14,664,000.00
4,592,500.00
1,975,800.00
802,500.00
670,500.00
286480882.xlsx - (9) EL
123
RAB ADD
JUMLAH HARGA
670,500.00
1,813,600.00
89,337,200.00
1,262,207,214.00
286480882.xlsx - (9) EL
124
NO
JENIS PEKERJAAN
PEKERJAAN ELEKTRIKAL
PEKERJAAN LISTRIK
1
PEKERJAAN PANEL
2
PEKERJAAN KABEL DAYA
3
PEMBUMIAN
4
PEKERJAAN INSTALASI PENERANGAN & STK
5
PEKERJAAN KABEL TRAY
I PEKERJAAN LISTRIK
II
III
IV
V
VI
VII
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PENANGKAL PETIR
FIRE ALARM
TATA SUARA
INSTALASI TELEPHONE
CCTV
DATA
B
I
PEKERJAAN MEKANIKAL
PEKERJAAN PLUMBING
1
PEKERJAAN INSTALASI AIR BERSIH
5
PEKERJAAN INSTALASI PIPA AIR KOTOR & BEKAS
I PEKERJAAN PLUMBING
II
III
286480882.xlsx - Rekap
125
286480882.xlsx - Rekap
126
RAB
84,404,950.00
205,554,300.00
94,509,200.00
13,379,500.00
447,131,900.00
60,141,100.00
820,716,000.00
41,797,500.00
83,887,300.00
67,704,000.00
78,439,114.00
80,326,100.00
89,337,200.00
1,346,612,164.00
162,428,280.00
94,898,100.00
257,326,380.00
905,954,400.00
653,960,400.00
286480882.xlsx - Rekap
127
Rp
1,817,241,180.00
Rp
3,163,853,344.00
286480882.xlsx - Rekap
128
NO
URAIAN PEKERJAAN
1
2
3
4
7
8
9
10
B
1
4
5
6
VOLUME
119.50
2.71
1.35
9.45
791.94
24.00
69.96
96.36
14.40
875.00
2.16
302.88
28.80
84.00
84.00
84.00
1.00
4.22
679.17
24.00
7.20
414.58
76.00
2.19
228.15
24.60
54.20
111.12
55.56
NO
7
8
9
10
11
URAIAN PEKERJAAN
-
VOLUME
55.56
53.70
53.70
2.00
2.00
Total pekerjaan Ground Reservo
NO
C
1
2
3
4
5
6
7
8
9
10
11
12
13
URAIAN PEKERJAAN
PEKERJAAN KOLAM
galian tanah
pembuangan Tanah
penanaman rumput gajah mini
pek. r. Serbaguna
pek. Toilet
pek. R. pompa
pas. Paving
pemadatan tanah
Sirtu class B/Sub Base (t=25cm)
Crushed stone class A/Base course (t=20cm)
Pasir abu batu t=5 cm
Pasang batu kali
Gudang
VOLUME
4,400.00
4,400.00
180.00
45.00
2.00
1.00
180.00
180.00
45.00
36.00
9.00
370.00
9.00
PEKERJAAN BANG
SAT
HARGA
JUMLAH
m3
m3
m3
60,678.00
223,414.00
747,798.00
7,251,297.08
605,228.53
1,012,892.39
m3
kg
m1
1,019,582.00
13,213.89
60,600.00
9,631,991.15
10,464,544.62
1,454,400.00
m2
m2
m3
kg
85,027.00
167,900.00
1,019,582.00
13,213.89
5,948,488.92
16,178,844.00
14,681,980.80
11,562,153.75
m3
kg
m2
m2
m2
m2
unit
1,019,582.00
13,213.89
167,900.00
33,500.00
37,300.00
228,175.00
466,500.00
2,202,297.12
4,002,223.00
4,835,520.00
2,814,000.00
3,133,200.00
19,166,700.00
466,500.00
m3
kg
m2
1,019,582.00
13,213.89
167,900.00
4,306,714.37
8,974,433.63
4,029,600.00
m3
kg
m2
1,019,582.00
13,213.89
167,900.00
7,340,990.40
5,478,258.56
12,760,400.00
m3
kg
M2
1,019,582.00
13,213.89
167,900.00
2,232,884.58
3,014,749.00
4,130,340.00
m2
m2
m2
129,571.00
39,152.00
28,678.37
7,022,748.20
4,350,570.24
1,593,370.24
SAT
HARGA
m2
25,002.37
m2
33,500.00
m2
37,300.00
unit
12,129,000.00
unit
2,332,500.00
Total pekerjaan Ground Reservoar & Rumah Pompa
JUMLAH
1,389,131.68
1,798,950.00
2,003,010.00
24,258,000.00
4,665,000.00
214,761,412.26
SAT
HARGA
m3
52,600.00
m3
32,600.00
m2
18,600.00
M2
2,332,500.00
unit
13,995,000.00
ls
9,330,000.00
m2
83,900.00
m2
18,600.00
m3
261,200.00
m3
251,900.00
m3
121,200.00
m3
803,731.00
m2
1,866,000.00
Total pekerjaan Kolam
PEKERJAAN BANGUNAN PENUNJANG
JUMLAH
231,440,000.00
143,440,000.00
3,348,000.00
104,962,500.00
27,990,000.00
9,330,000.00
15,102,000.00
3,348,000.00
11,754,000.00
9,068,400.00
1,090,800.00
297,380,470.00
16,794,000.00
875,048,170.00
1,089,809,582.26
NO
URAIAN PEKERJAAN
1
2
3
4
5
6
7
8
9
10
11
VOLUME
SAT
2,428.00
m2
148.00
m3
485.60
m3
607.00
m3
485.60
m3
121.40
m3
2,428.00
m2
579.00
m1
200.00
m1
13.00
Bh
300.00
m2
PEKERJAAN SITE DEV
HARGA
2,300.00
60,678.00
17,700.00
248,976.00
265,776.00
116,600.00
118,798.00
92,000.60
268,700.00
209,900.00
18,600.00
PEKERJAAN SITE DEVELOPMENT
JUMLAH
5,584,400
8,980,344
8,595,120
151,128,432
129,060,826
14,155,240
288,441,544
53,268,347
53,740,000
2,728,700
5,580,000
721,262,953
JENIS PEKERJAAN
NO
JENIS PEKERJAAN
Bahan MU.301 Untuk Plester
Pekerja
Tukang batu
Kepala tukang batu
Mandor
NO
JENIS PEKERJAAN
NO
JENIS PEKERJAAN
10
NO
JENIS PEKERJAAN
Portland cement
Pasir Pasang
Grouting naad MU.408
Pekerja
Tukang batu
Kepala tukang batu
Mandor
11
NO
JENIS PEKERJAAN
12
13
14
15
NO
JENIS PEKERJAAN
Tukang plafond
Kep. Tukang Plafond
Mandor
16
NO
17
JENIS PEKERJAAN
18
19
NO
JENIS PEKERJAAN
HARGA-SAT
( Rp )
VOLUME
MATERIAL
( Rp )
8.50
6.00
0.15
0.12
0.02
0.02
bh
kg
oh
oh
oh
oh
7,900.00
3,600.00
88,200.00
103,800.00
119,600.00
135,200.00
67,150.00
21,600.00
8.50
6.00
0.15
0.12
0.02
0.02
bh
kg
oh
oh
oh
oh
6,000.00
3,600.00
88,200.00
103,800.00
119,600.00
135,200.00
51,000.00
21,600.00
12.50
1.60
0.05
0.15
0.12
0.02
0.02
bh
kg
m3
oh
oh
oh
oh
2,500.00
1,240.00
248,800.00
88,200.00
103,800.00
119,600.00
135,200.00
31,250.00
1,984.00
12,440.00
HARGA-SAT
( Rp )
VOLUME
MATERIAL
( Rp )
11.00
0.10
0.10
0.02
0.02
kg
oh
oh
oh
oh
1,100.00
88,200.00
103,800.00
119,600.00
135,200.00
12,100.00
3.00
0.05
0.05
0.01
0.01
kg
oh
oh
oh
oh
3,800.00
88,200.00
103,800.00
119,600.00
135,200.00
11,400.00
3.25
0.15
0.10
0.01
0.01
kg
oh
oh
oh
oh
1,240.00
88,200.00
103,800.00
119,600.00
135,200.00
4,030.00
0.05
15.00
0.21
0.21
0.02
0.02
m3
kg
oh
oh
oh
oh
250,100.00
1,240.00
88,200.00
103,800.00
119,600.00
135,200.00
11,254.50
18,600.00
HARGA-SAT
( Rp )
VOLUME
70.00
0.04
11.00
0.30
0.10
0.01
0.02
bh
m3
kg
oh
oh
oh
oh
500.00
248,800.00
1,240.00
88,200.00
103,800.00
119,600.00
135,200.00
MATERIAL
( Rp )
35,000.00
9,952.00
13,640.00
HARGA-SAT
( Rp )
VOLUME
MATERIAL
( Rp )
1.00
13.00
0.05
0.35
0.27
0.17
0.03
0.03
m2
kg
m
kg
oh
oh
oh
oh
76,000.00
1,240.00
248,800.00
2,400.00
88,200.00
103,800.00
119,600.00
135,200.00
76,000.00
16,120.00
11,196.00
840.00
1.00
13.00
0.05
0.35
0.27
0.17
0.03
0.03
m2
kg
m
kg
oh
oh
oh
oh
84,000.00
1,240.00
248,800.00
2,400.00
88,200.00
103,800.00
119,600.00
135,200.00
84,000.00
16,120.00
11,196.00
840.00
1.00
13.00
0.05
0.35
0.27
0.17
0.03
0.03
m2
kg
m
kg
oh
oh
oh
oh
195,000.00
1,240.00
248,800.00
2,400.00
88,200.00
103,800.00
119,600.00
135,200.00
195,000.00
16,120.00
11,196.00
840.00
1.00 m2
74,500.00
74,500.00
60 cm /m ( Salsa )
HARGA-SAT
( Rp )
VOLUME
MATERIAL
( Rp )
13.00
0.05
0.35
0.27
0.17
0.03
0.03
kg
m
kg
oh
oh
oh
oh
1,240.00
248,800.00
2,400.00
88,200.00
103,800.00
119,600.00
135,200.00
16,120.00
11,196.00
840.00
1.00
13.00
0.05
0.35
0.33
0.27
0.03
0.03
m2
kg
m
kg
oh
oh
oh
oh
76,000.00
1,240.00
248,800.00
2,400.00
88,200.00
103,800.00
119,600.00
135,200.00
76,000.00
16,120.00
11,196.00
840.00
HARGA-SAT
( Rp )
VOLUME
MATERIAL
( Rp )
3.33
0.15
0.01
0.02
0.11
lbr
Zak
m3
kg
m2
6,500.00
62,000.00
248,800.00
2,400.00
47,830.00
21,666.67
9,114.00
2,488.00
48.00
1.67
0.02
0.00
0.20
0.13
lbr
Zak
m3
kg
m2
17,000.00
62,000.00
248,800.00
2,400.00
47,830.00
28,333.33
1,488.00
248.80
480.00
2.50
0.12
0.00
0.02
0.13
lbr
Zak
m3
kg
m2
18,500.00
62,000.00
248,800.00
2,400.00
47,830.00
46,250.00
7,440.00
870.80
48.00
1.00
0.40
12.00
12.00
0.05
0.01
1.00
0.15
m2
lbr
bh
bh
roll
zak
ls
oh
37,500.00
70,000.00
300.00
100.00
32,500.00
43,000.00
1,500.00
88,200.00
37,500.00
27,930.00
3,600.00
1,200.00
1,625.00
430.00
1,500.00
HARGA-SAT
( Rp )
VOLUME
0.12 oh
0.01 oh
0.01 oh
1.00
0.40
12.00
12.00
0.05
0.01
1.00
0.15
0.12
0.01
0.01
m2
lbr
bh
bh
roll
zak
ls
oh
oh
oh
oh
MATERIAL
( Rp )
103,800.00
119,600.00
135,200.00
37,500.00
60,000.00
300.00
100.00
32,500.00
43,000.00
1,500.00
88,200.00
103,800.00
119,600.00
135,200.00
37,500.00
23,940.00
3,600.00
1,200.00
1,625.00
430.00
1,500.00
HARGA-SAT
( Rp )
VOLUME
MATERIAL
( Rp )
0.10
0.24
0.35
0.01
1.00
0.01
0.04
0.00
0.00
ltr
kg
lbr
bh
ls
oh
oh
oh
oh
47,500.00
62,500.00
4,000.00
32,000.00
1,350.00
88,200.00
70,000.00
75,000.00
135,200.00
4,750.00
15,000.00
1,400.00
320.00
1,350.00
0.10
0.10
0.24
0.35
0.01
1.00
0.01
0.04
0.00
0.00
kg
kg
kg
lbr
bh
ls
oh
oh
oh
oh
11,700.00
28,500.00
28,500.00
4,000.00
32,000.00
1,350.00
88,200.00
70,000.00
75,000.00
135,200.00
1,170.00
2,850.00
6,840.00
1,400.00
320.00
1,350.00
14,400,000.00
120,000.00
60,000.00
14,400,000.00
205,200,000.00
Galian Basement )
1.00 Unit
1,710.00 m'
1,710.00 m'
VOLUME
HARGA-SAT
( Rp )
MATERIAL
( Rp )
UPAH
( Rp )
JUMLAH
( Rp )
13,230.00
12,456.00
1,794.00
2,028.00
Jumlah
Jasa 10 %
Juml.Harga
118,258.00
11,825.80
130,083.80
13,230.00
12,456.00
1,794.00
2,028.00
Jumlah
Jasa 10 %
Juml.Harga
102,108.00
10,210.80
112,318.80
13,230.00
12,456.00
1,794.00
2,028.00
Jumlah
Jasa 10 %
Juml.Harga
75,182.00
7,518.20
82,700.20
UPAH
( Rp )
JUMLAH
( Rp )
8,820.00
10,380.00
2,392.00
2,704.00
Jumlah
Jasa 10 %
Juml.Harga
36,396.00
3,639.60
40,035.60
4,410.00
5,190.00
1,196.00
1,352.00
Jumlah
Jasa 10 %
Juml.Harga
23,548.00
2,354.80
25,902.80
13,230.00
10,380.00
1,196.00
1,081.60
Jumlah
Jasa 10 %
Juml.Harga
29,917.60
2,991.76
32,909.36
18,522.00
21,798.00
2,631.20
2,974.40
Jumlah
Jasa 10 %
75,780.10
7,578.01
UPAH
( Rp )
Juml.Harga
JUMLAH
( Rp )
83,358.11
26,460.00
10,380.00
1,196.00
2,028.00
Jumlah
Jasa 10 %
Juml.Harga
98,656.00
9,865.60
108,521.60
UPAH
( Rp )
JUMLAH
( Rp )
23,814.00
17,646.00
2,990.00
3,380.00
Jumlah
Jasa 10 %
Juml.Harga
151,986.00
15,198.60
167,184.60
23,814.00
17,646.00
2,990.00
3,380.00
Jumlah
Jasa 10 %
Juml.Harga
159,986.00
15,998.60
175,984.60
23,814.00
17,646.00
2,990.00
3,380.00
Jumlah
Jasa 10 %
Juml.Harga
270,986.00
27,098.60
298,084.60
UPAH
( Rp )
JUMLAH
( Rp )
23,814.00
17,646.00
2,990.00
3,380.00
Jumlah
Jasa 10 %
Juml.Harga
150,486.00
15,048.60
165,534.60
29,106.00
28,026.00
2,990.00
3,380.00
Jumlah
Jasa 10 %
Juml.Harga
167,658.00
16,765.80
184,423.80
UPAH
( Rp )
JUMLAH
( Rp )
5,314.44
Jumlah
Jasa 10 %
Juml.Harga
38,631.11
3,863.11
42,494.22
5,978.75
Jumlah
Jasa 10 %
Juml.Harga
36,528.88
3,652.89
40,181.77
5,978.75
Jumlah
Jasa 10 %
Juml.Harga
60,587.55
6,058.76
66,646.31
13,230.00
UPAH
( Rp )
JUMLAH
( Rp )
12,456.00
1,435.20
1,014.00
Jumlah
Jasa 10 %
Juml.Harga
101,920.20
10,192.02
112,112.22
13,230.00
12,456.00
1,435.20
1,014.00
Jumlah
Jasa 10 %
Juml.Harga
97,930.20
9,793.02
107,723.22
UPAH
( Rp )
JUMLAH
( Rp )
882.00
2,800.00
225.00
405.60
Jumlah
Jasa 10 %
Juml.Harga
27,132.60
2,713.26
29,845.86
882.00
2,800.00
225.00
405.60
Jumlah
Jasa 10 %
Juml.Harga
18,242.60
1,824.26
20,066.86
102,600,000.00
Jumlah
Jasa 10 %
Juml.Harga
Jakarta, 30 Nopember 2012
322,200,000.00
32,220,000.00
354,420,000.00
UPAH
( Rp )
PT. Nugraha Adi Taruna
JUMLAH
( Rp )
ANALISA KUSEN
No
1
Uraian
PJ1
Alumunium U
Kaca tempered 12 mm
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PJ5
Alumunium U
Kaca tempered 12 mm
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PJ4
Alumunium U
Kaca tempered 12 mm
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
sat
volume
m1
m2
bh
bh
bh
bh
bh
m2
25.03
21.76
2.00
2.00
1.00
2.00
2.00
21.76
m1
m2
bh
bh
bh
bh
bh
m2
16.91
13.24
2.00
2.00
1.00
2.00
2.00
13.24
m1
m2
bh
bh
bh
bh
bh
m2
16.91
13.24
1.00
1.00
1.00
1.00
1.00
13.24
No
1
Uraian
PJ3
Alumunium U
Kaca tempered 12 mm
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PJ2
Alumunium U
Kaca tempered 12 mm
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
P6
Alumunium U
Kaca tempered 12 mm
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
J2
Alumunium U
Kaca tempered 12 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
sat
volume
m1
m2
bh
bh
bh
bh
bh
m2
17.01
8.61
2.00
2.00
2.00
2.00
2.00
8.61
m1
m2
bh
bh
bh
bh
bh
m2
24.74
34.03
2.00
2.00
2.00
2.00
2.00
34.03
m1
m2
bh
bh
bh
bh
bh
m2
10.92
6.78
2.00
2.00
2.00
2.00
2.00
6.78
m1
m2
m2
15.65
11.62
11.62
No
Uraian
Pembulatan
sat
volume
No
1
Uraian
J1
Alumunium U
Kaca tempered 12 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PT7
Partisi PVC
Engsel pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PT6
Partisi PVC
Engsel pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
J5
Alumunium U
Kaca tempered 12 mm
Engsel jendela
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
J4
Alumunium U
Kaca tempered 12 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
sat
volume
m1
m2
m2
17.48
17.73
17.73
m2
bh
m2
1.42
4.00
1.42
m2
bh
m2
4.97
4.00
4.97
m1
m2
bh
m2
96.31
48.27
12.00
48.27
m1
m2
m2
6.68
2.43
2.43
No
1
Uraian
J3
Alumunium U
Kaca tempered 12 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PJP2
Alumunium 4" powder coating
Kaca tempered 12 mm
Sticker sandblast
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PJP4
Alumunium 4" powder coating
Kaca tempered 12 mm
Sticker sandblast
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
sat
volume
m1
m2
m2
10.61
6.46
6.46
m1
m2
m2
bh
bh
bh
bh
bh
m2
19.95
8.53
8.53
1.00
1.00
1.00
1.00
1.00
8.53
m1
m2
m2
bh
bh
bh
bh
bh
m2
29.14
14.33
14.33
2.00
2.00
2.00
2.00
2.00
14.33
No
1
Uraian
PP1
Alumunium 4" powder coating
Kaca tempered 12 mm
Sticker sandblast
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PJP3
Alumunium 4" powder coating
Kaca tempered 12 mm
Sticker sandblast
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
JP1
Alumunium 4" powder coating
Kaca tempered 12 mm
Sticker sandblast
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PT5
Partisi PVC
Engsel pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
sat
volume
m1
m2
m2
bh
bh
bh
bh
bh
m2
10.79
5.53
5.53
2.00
2.00
2.00
2.00
2.00
5.53
m1
m2
m2
bh
bh
bh
bh
bh
m2
17.17
9.92
9.92
2.00
2.00
2.00
2.00
2.00
9.92
m1
m2
m2
m2
25.78
11.39
11.39
11.39
m2
bh
m2
6.39
6.00
6.39
No
1
Uraian
J7
Alumunium U
Kaca tempered 12 mm
Engsel jendela
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PJP1
Alumunium 4" powder coating
Kaca tempered 12 mm
Sticker sandblast
Engsel atas PT 20
Engsel bawah PT 10
Kunci US 10
Handle stainless 100 cm
Floor hinge ex. Dorma BTS 84
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
J6
Alumunium U
Kaca tempered 12 mm
Engsel jendela
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PB2
Pintu besi + accessories
Jalusi plat besi
Cat besi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
sat
volume
m1
m2
bh
m2
96.31
48.27
12.00
48.27
m1
m2
m2
bh
bh
bh
bh
bh
m2
37.96
17.27
17.27
1.00
1.00
1.00
1.00
1.00
17.27
m1
m2
bh
m2
87.54
48.27
12.00
48.27
m2
m2
m2
m2
3.27
0.39
3.67
3.67
No
1
Uraian
P6
Pintu besi + accessories
Cat besi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
P1 & P1'
Pintu besi + accessories
Cat besi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
P2
Alumunium 4" powder coating
Daun pintu kayu
Kaca polos 5 mm
Handle + kunci
Kunci tanam
Engsel pintu
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PP2
Alumunium 4" powder coating
Daun pintu kayu
Kaca polos 5 mm
Handle + kunci
Kunci tanam
Engsel pintu
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
sat
volume
m2
m2
m2
3.84
3.84
3.84
m2
m2
m2
2.48
2.48
2.48
m1
m2
m2
bh
bh
bh
m2
m2
7.77
1.89
0.66
1.00
1.00
3.00
1.89
2.65
m1
m2
m2
bh
bh
bh
m2
m2
7.77
1.98
0.66
1.00
1.00
3.00
1.98
2.65
No
1
Uraian
PP3
Alumunium 4" powder coating
Daun pintu kayu
Handle + kunci
Kunci tanam
Engsel pintu
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PJ7
Alumunium 4" powder coating
Daun pintu kayu
Daun jendela alumunium
Kaca polos 5 mm
Handle + kunci
Kunci tanam
Engsel pintu
Engsel jendela
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PJ8
Alumunium 4" powder coating
Daun pintu kayu
Daun jendela alumunium
Kaca polos 5 mm
Handle + kunci
Kunci tanam
Engsel pintu
Engsel jendela
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
sat
volume
m1
m2
bh
bh
bh
m2
m2
5.46
2.03
1.00
1.00
3.00
2.03
2.03
m1
m2
m1
m2
bh
bh
bh
bh
m2
m2
16.38
1.76
6.93
3.18
1.00
1.00
3.00
4.00
1.76
4.95
m1
m2
m1
m2
bh
bh
bh
bh
m2
m2
12.13
1.76
3.47
2.01
1.00
1.00
3.00
2.00
1.76
3.77
No
1
Uraian
P3
Alumunium 4" powder coating
Daun pintu kayu
Kaca polos 5 mm
Handle + kunci
Kunci tanam
Engsel pintu
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
P4 & P4'
Alumunium 4" powder coating
Daun pintu kayu
Kaca polos 5 mm
Handle + kunci
Kunci tanam
Engsel pintu
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PB1
Alumunium 4" powder coating
Daun pintu kayu
Kaca polos 5 mm
Handle + kunci
Kunci tanam
Engsel pintu
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
sat
volume
m1
m2
m2
bh
bh
bh
m2
m2
7.77
1.89
0.66
1.00
1.00
3.00
1.89
2.55
m1
m2
m2
bh
bh
bh
m2
m2
7.56
1.68
0.59
1.00
1.00
3.00
1.68
2.27
m1
m2
m2
bh
bh
bh
m2
m2
9.77
1.81
0.79
1.00
1.00
3.00
1.81
2.59
No
1
Uraian
P5
Alumunium 4" powder coating
Daun pintu kayu
Handle + kunci
Kunci tanam
Engsel pintu
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
Ps
Alumunium 4" powder coating
Daun pintu kayu
Handle + kunci
Kunci tanam
Engsel pintu
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
BV3
Alumunium 4" powder coating
Kaca polos 5 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
BV4
Alumunium 4" powder coating
Kaca polos 5 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
sat
volume
m1
m2
bh
bh
bh
m2
m2
5.36
1.81
1.00
1.00
3.00
1.81
1.81
m1
m2
bh
bh
bh
m2
m2
5.25
1.94
1.00
1.00
3.00
1.94
1.94
m1
m2
m2
10.08
2.24
2.24
m1
m2
m2
7.77
1.69
1.69
No
1
Uraian
BV5
Alumunium 4" powder coating
Kaca polos 5 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
BV6
Alumunium 4" powder coating
Kaca polos 5 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
BV1'
Alumunium 4" powder coating
Kaca polos 5 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
BV1
Jalusi besi
Cat besi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
BV2'
Alumunium 4" powder coating
Kaca polos 5 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
sat
volume
m1
m2
m2
5.46
1.14
1.14
m1
m2
m2
3.15
0.59
0.59
m1
m2
m2
6.93
1.21
1.21
m2
m2
m2
1.21
1.21
1.21
m1
m2
m2
15.33
0.81
0.81
No
1
Uraian
BV2
Jalusi besi
Cat besi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
P7
Alumunium 4" powder coating
Daun pintu kayu
Handle + kunci
Kunci tanam
Engsel pintu
Finnishing melamik daun pintu
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PP4
Partisi gypsum
Rel gantung
Kunci tanam
Engsel pintu
Cat partisi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
PT2, PT3, PT4
Partisi gypsum
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
sat
volume
m2
m2
m2
0.81
0.81
0.81
m1
m2
bh
bh
bh
m2
m2
6.30
3.84
2.00
1.00
6.00
3.84
3.84
m2
unit
bh
bh
m2
m2
26.57
1.00
1.00
27.00
53.13
26.57
m2
m2
1.05
1.05
No
1
Uraian
PT1
Partisi gypsum
Kusen alumunium 4" powder coating
Kaca polos 5 mm
Upah kerja
Jumlah 1
Jumlah 2 (per m2)
Jasa 10%
Jumlah 2
Pembulatan
Grill penutup saluran
Siku 5 x 5
Plat strip 3 cm
Besi 10 mm
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
Railing tangga
Hollow 5/5
Hollow 2/2
Plat strip 5/5
Base plat 6 mm
Angkur
Catbesi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
Hand rail
Hollow 5/5
Hollow 2/2
Base plat 6 mm
Angkur
Catbesi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
sat
volume
m2
m1
m2
m2
3.15
5.10
1.05
3.15
kg
kg
kg
m1
8.32
7.70
1.36
1.00
kg
kg
kg
kg
bh
kg
m1
16.97
3.70
1.29
1.07
4.00
23.03
1.00
kg
kg
kg
bh
kg
m1
6.06
0.49
1.07
4.00
7.62
1.00
No
1
Uraian
Grill penutup saluran
Plat 12 mm
Besi 10 mm
Besi 19 mm
Angkur
Catbesi
Upah kerja
Jumlah 1
Jasa 10%
Jumlah 2
Pembulatan
sat
kg
kg
kg
bh
kg
m1
volume
16.36
3.39
12.24
8.00
32.00
1.00
harga satuan
jumlah
16,600.00
850,000.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00
415,531.20
18,492,600.00
250,400.00
250,400.00
709,500.00
1,669,600.00
4,174,000.00
907,225.20
26,869,256.40
2,686,925.64
29,556,182.04
29,556,180.00
16,600.00
850,000.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00
280,623.00
11,254,068.00
250,400.00
250,400.00
709,500.00
1,669,600.00
4,174,000.00
552,111.34
19,140,702.34
1,914,070.23
21,054,772.57
21,054,770.00
16,600.00
850,000.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00
280,623.00
11,254,068.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
552,111.34
15,968,502.34
1,596,850.23
17,565,352.57
17,565,350.00
harga satuan
jumlah
16,600.00
850,000.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00
282,366.00
7,318,500.00
250,400.00
250,400.00
1,419,000.00
1,669,600.00
4,174,000.00
359,037.00
15,723,303.00
1,572,330.30
17,295,633.30
17,295,630.00
16,600.00
850,000.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00
410,650.80
28,927,710.00
250,400.00
250,400.00
1,419,000.00
1,669,600.00
4,174,000.00
1,419,159.42
38,520,920.22
3,852,092.02
42,373,012.24
42,373,010.00
16,600.00
850,000.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00
181,272.00
5,763,318.75
250,400.00
250,400.00
1,419,000.00
1,669,600.00
4,174,000.00
282,741.64
13,990,732.39
1,399,073.24
15,389,805.63
15,389,800.00
16,600.00
850,000.00
41,700.00
259,707.00
9,879,975.00
484,699.95
10,624,381.95
1,062,438.20
11,686,820.15
harga satuan
jumlah
11,686,820.00
harga satuan
jumlah
16,600.00
850,000.00
41,700.00
290,209.50
15,072,093.75
739,419.19
16,101,722.44
1,610,172.24
17,711,894.68
17,711,890.00
1,043,500.00
29,200.00
41,700.00
1,479,161.25
116,800.00
59,109.75
1,655,071.00
165,507.10
1,820,578.10
1,820,570.00
1,043,500.00
29,200.00
41,700.00
5,182,542.75
116,800.00
207,103.05
5,506,445.80
550,644.58
6,057,090.38
6,057,090.00
16,600.00
850,000.00
20,000.00
41,700.00
1,598,679.60
41,030,456.25
240,000.00
2,012,905.91
44,882,041.76
4,488,204.18
49,370,245.94
49,370,240.00
16,600.00
850,000.00
41,700.00
110,854.80
2,067,476.25
101,427.95
2,279,759.00
227,975.90
2,507,734.90
2,507,730.00
harga satuan
jumlah
16,600.00
850,000.00
41,700.00
176,043.00
5,488,875.00
269,277.75
5,934,195.75
593,419.58
6,527,615.33
6,527,610.00
122,700.00
850,000.00
125,200.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00
2,447,865.00
7,247,100.00
1,067,455.20
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
355,534.20
14,999,654.40
1,499,965.44
16,499,619.84
16,499,610.00
122,700.00
850,000.00
125,200.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00
3,575,171.25
12,182,625.00
1,794,429.00
250,400.00
250,400.00
1,419,000.00
1,669,600.00
4,174,000.00
597,665.25
25,913,290.50
2,591,329.05
28,504,619.55
28,504,610.00
harga satuan
jumlah
122,700.00
850,000.00
125,200.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00
1,324,423.80
4,698,120.00
692,005.44
250,400.00
250,400.00
1,419,000.00
1,669,600.00
4,174,000.00
230,484.24
14,708,433.48
1,470,843.35
16,179,276.83
16,179,270.00
122,700.00
850,000.00
125,200.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00
2,106,452.25
8,434,125.00
1,242,297.00
250,400.00
250,400.00
1,419,000.00
1,669,600.00
4,174,000.00
413,768.25
19,960,042.50
1,996,004.25
21,956,046.75
21,956,040.00
122,700.00
850,000.00
125,200.00
41,700.00
3,162,899.25
9,683,625.00
1,426,341.00
475,067.25
14,747,932.50
1,474,793.25
16,222,725.75
16,222,720.00
1,043,500.00
29,200.00
41,700.00
6,666,634.54
175,200.00
266,409.83
7,108,244.37
710,824.44
7,819,068.81
7,819,060.00
harga satuan
jumlah
16,600.00
850,000.00
20,000.00
41,700.00
1,598,679.60
41,030,456.25
240,000.00
2,012,905.91
44,882,041.76
4,488,204.18
49,370,245.94
49,370,240.00
122,700.00
850,000.00
125,200.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
41,700.00
4,657,385.25
14,681,625.00
2,162,517.00
125,200.00
125,200.00
709,500.00
834,800.00
2,087,000.00
720,263.25
26,103,490.50
2,610,349.05
28,713,839.55
28,713,830.00
16,600.00
850,000.00
20,000.00
41,700.00
1,453,139.10
41,030,456.25
240,000.00
2,012,905.91
44,736,501.26
4,473,650.13
49,210,151.39
49,210,150.00
834,800.00
417,400.00
29,200.00
83,400.00
2,732,613.45
164,351.25
107,080.05
305,838.23
3,309,882.98
330,988.30
3,640,871.27
3,640,870.00
harga satuan
jumlah
834,800.00
29,200.00
83,400.00
3,203,753.70
112,062.30
320,068.35
3,635,884.35
363,588.44
3,999,472.79
3,999,470.00
1,460,900.00
29,200.00
83,400.00
3,627,779.93
72,510.90
207,103.05
3,907,393.88
390,739.39
4,298,133.26
4,298,130.00
122,700.00
626,100.00
83,400.00
125,200.00
41,700.00
29,200.00
75,100.00
41,700.00
953,379.00
1,183,329.00
55,169.10
125,200.00
41,700.00
87,600.00
141,939.00
110,338.20
2,698,654.30
269,865.43
2,968,519.73
2,968,510.00
122,700.00
626,100.00
83,400.00
125,200.00
41,700.00
29,200.00
75,100.00
41,700.00
953,379.00
1,242,495.45
55,169.10
125,200.00
41,700.00
87,600.00
149,035.95
110,338.20
2,764,917.70
276,491.77
3,041,409.47
3,041,400.00
harga satuan
jumlah
122,700.00
626,100.00
125,200.00
41,700.00
29,200.00
75,100.00
41,700.00
669,942.00
1,272,078.68
125,200.00
41,700.00
87,600.00
152,584.43
84,723.98
2,433,829.08
243,382.91
2,677,211.98
2,677,210.00
122,700.00
626,100.00
100,100.00
83,400.00
125,200.00
41,700.00
29,200.00
20,000.00
75,100.00
41,700.00
2,009,826.00
1,104,440.40
693,693.00
265,337.10
125,200.00
41,700.00
87,600.00
80,000.00
132,476.40
206,227.35
4,746,500.25
474,650.03
5,221,150.28
5,221,150.00
122,700.00
626,100.00
100,100.00
83,400.00
125,200.00
41,700.00
29,200.00
20,000.00
75,100.00
41,700.00
1,488,044.25
1,104,440.40
346,846.50
167,258.70
125,200.00
41,700.00
87,600.00
40,000.00
132,476.40
157,188.15
3,690,754.40
369,075.44
4,059,829.84
4,059,820.00
harga satuan
jumlah
122,700.00
626,100.00
83,400.00
125,200.00
41,700.00
29,200.00
75,100.00
41,700.00
953,379.00
1,183,329.00
55,169.10
125,200.00
41,700.00
87,600.00
141,939.00
106,397.55
2,694,713.65
269,471.37
2,964,185.02
2,964,180.00
122,700.00
626,100.00
83,400.00
125,200.00
41,700.00
29,200.00
75,100.00
41,700.00
927,612.00
1,051,848.00
49,039.20
125,200.00
41,700.00
87,600.00
126,168.00
94,575.60
2,503,742.80
250,374.28
2,754,117.08
2,754,110.00
122,700.00
626,100.00
83,400.00
125,200.00
41,700.00
29,200.00
75,100.00
41,700.00
1,198,165.50
1,130,736.60
65,677.50
125,200.00
41,700.00
87,600.00
135,630.60
108,148.95
2,892,859.15
289,285.92
3,182,145.07
3,182,140.00
harga satuan
jumlah
122,700.00
626,100.00
125,200.00
41,700.00
29,200.00
75,100.00
41,700.00
657,058.50
1,130,736.60
125,200.00
41,700.00
87,600.00
135,630.60
75,310.20
2,253,235.90
225,323.59
2,478,559.49
2,478,550.00
122,700.00
626,100.00
125,200.00
41,700.00
29,200.00
75,100.00
41,700.00
644,175.00
1,212,912.23
125,200.00
41,700.00
87,600.00
145,487.48
80,783.33
2,337,858.03
233,785.80
2,571,643.83
2,571,640.00
122,700.00
83,400.00
50,000.00
1,236,816.00
186,961.95
112,087.50
1,535,865.45
153,586.55
1,689,452.00
1,689,450.00
122,700.00
83,400.00
50,000.00
953,379.00
140,987.70
84,525.00
1,178,891.70
117,889.17
1,296,780.87
1,296,780.00
harga satuan
jumlah
122,700.00
83,400.00
50,000.00
669,942.00
95,013.45
56,962.50
821,917.95
82,191.80
904,109.75
904,100.00
122,700.00
83,400.00
50,000.00
386,505.00
49,039.20
29,400.00
464,944.20
46,494.42
511,438.62
511,430.00
122,700.00
83,400.00
50,000.00
850,311.00
100,705.50
60,375.00
1,011,391.50
101,139.15
1,112,530.65
1,112,530.00
417,400.00
29,200.00
83,400.00
504,010.50
35,259.00
100,705.50
639,975.00
63,997.50
703,972.50
703,970.00
122,700.00
83,400.00
50,000.00
1,880,991.00
67,866.75
40,687.50
1,989,545.25
198,954.53
2,188,499.78
2,188,490.00
harga satuan
jumlah
417,400.00
29,200.00
83,400.00
339,659.25
23,761.50
67,866.75
431,287.50
43,128.75
474,416.25
474,410.00
122,700.00
626,100.00
125,200.00
41,700.00
29,200.00
75,100.00
41,700.00
773,010.00
2,402,815.28
250,400.00
41,700.00
175,200.00
288,215.03
160,034.18
4,091,374.48
409,137.45
4,500,511.92
4,500,510.00
100,100.00
292,100.00
41,700.00
29,200.00
62,600.00
20,800.00
2,659,156.50
292,100.00
41,700.00
788,400.00
3,325,938.00
552,552.00
7,659,846.50
765,984.65
8,425,831.15
8,425,830.00
100,100.00
20,800.00
105,105.00
21,840.00
126,945.00
12,694.50
139,639.50
139,630.00
harga satuan
jumlah
100,100.00
100,100.00
292,100.00
20,800.00
315,315.00
510,510.00
306,705.00
65,520.00
1,198,050.00
285,250.00
28,525.00
313,775.00
313,770.00
12,500.00
12,500.00
8,500.00
25,000.00
103,950.00
96,250.00
11,529.86
25,000.00
236,729.86
23,672.99
260,402.84
260,400.00
12,500.00
12,500.00
12,500.00
12,500.00
4,100.00
2,000.00
41,700.00
212,135.00
46,200.00
16,170.00
13,368.06
16,400.00
46,059.69
41,700.00
392,032.74
39,203.27
431,236.02
431,230.00
12,500.00
12,500.00
12,500.00
4,100.00
2,000.00
20,800.00
75,762.50
6,160.00
13,368.06
16,400.00
15,246.49
20,800.00
147,737.04
14,773.70
162,510.75
162,510.00
harga satuan
12,500.00
8,500.00
8,500.00
4,100.00
2,000.00
41,700.00
jumlah
204,531.25
28,824.65
104,056.98
32,800.00
63,991.26
41,700.00
475,904.14
47,590.41
523,494.55
523,490.00
1.Unit
1.Unit
1.Unit
1.Unit
Aluminium U
Kaca Tempered 12mm
Daun Pintu Kaca Tempered 12mm
Gawangan Pintu
Konci Pintu dan Phat piting
Floor Hing Dorma BTS 84
Handel Pintu
Sealant kaca Tempered
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
0.75 m2
16.40 m'
9.00 m'
Kaca 5 mm
Sealant kusen
Sealant kaca
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga
1.Unit
1.Unit
1.Unit
1.Unit
1.Unit
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
6.00 m'
Sealant kaca
@ Rp.
Sub total :
Jasa.
Total Harga
1.Unit
1.Unit
1.Unit
1.Unit
1.Unit
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga
1.Unit
1.Unit
1.Unit
1.Unit
1.Unit
1.Unit
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga
@ Rp.
@ Rp.
@ Rp.
@ Rp.
m'
@ Rp.
Sub total :
Jasa.
Total Harga
1.Unit
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Jasa.
Total Harga
37,500.00
850,000.00
2,500,000.00
571,800.00
1,794,800.00
1,126,900.00
542,600.00
16,500.00
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
706,500.00
12,495,000.00
5,000,000.00
3,345,030.00
3,589,600.00
2,253,800.00
1,085,200.00
1,155,000.00
29,630,130.00
2,963,013.00
32,593,143.00
110,600.00
87,600.00
727,469.00
39,600.00
396,500.00
40,600.00
40,400.00
27,900.00
104,300.00
6,200.00
5,400.00
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,714,300.00
648,240.00
1,222,147.92
133,056.00
396,500.00
121,800.00
161,600.00
55,800.00
349,405.00
117,800.00
177,120.00
5,097,768.92
509,776.89
5,607,545.81
110,600.00
87,600.00
727,469.00
39,600.00
396,500.00
40,600.00
40,400.00
27,900.00
104,300.00
6,200.00
5,400.00
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,266,370.00
324,120.00
1,222,147.92
133,056.00
396,500.00
121,800.00
80,800.00
27,900.00
205,471.00
99,200.00
105,840.00
3,983,204.92
398,320.49
4,381,525.41
110,600.00
727,469.00
39,600.00
396,500.00
40,600.00
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
1,017,520.00
1,251,246.68
136,224.00
396,500.00
121,800.00
Sub total :
Total Harga
Sub total :
Total Harga
Sub total :
Total Harga
Sub total :
Total Harga
104,300.00 =
6,200.00 =
5,400.00 =
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
78,225.00
101,680.00
48,600.00
3,151,795.68
315,179.57
3,466,975.25
1,112,267.92
1,335,600.00
32,900.00
208,700.00
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
3,467,495.24
500,850.00
217,469.00
208,700.00
4,394,514.24
439,451.42
4,833,965.66
1,730,848.69 =
39,600.00 =
187,800.00 =
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
4,093,457.14
187,308.00
187,800.00
4,468,565.14
446,856.51
4,915,421.66
110,600.00
727,469.00
39,600.00
396,500.00
40,600.00
104,300.00
6,200.00
5,400.00
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
818,440.00
1,374,916.41
149,688.00
396,500.00
121,800.00
65,709.00
80,600.00
34,560.00
3,042,213.41
304,221.34
3,346,434.75
110,600.00
727,469.00
39,600.00
396,500.00
40,600.00
104,300.00
6,200.00
5,400.00
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
818,440.00
1,374,916.41
149,688.00
396,500.00
121,800.00
65,709.00
80,600.00
34,560.00
3,042,213.41
304,221.34
3,346,434.75
110,600.00
727,469.00
39,600.00
396,500.00
40,600.00
104,300.00
6,200.00
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
796,320.00
1,222,147.92
133,056.00
396,500.00
121,800.00
58,408.00
79,360.00
Sub total :
Total Harga
Sub total :
Total Harga
Sub total :
Total Harga
Sub total :
Total Harga
Sub total :
Total Harga
5,400.00 =
=
=
=
Rp
Rp
Rp
Rp
32,400.00
2,839,991.92
283,999.19
3,123,991.11
110,600.00
727,469.00
39,600.00
396,500.00
40,600.00
6,200.00
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
564,060.00
1,251,246.68
136,224.00
396,500.00
121,800.00
63,240.00
2,533,070.68
253,307.07
2,786,377.75
110,600.00
727,469.00
39,600.00
396,500.00
40,600.00
6,200.00
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
553,000.00
1,338,542.96
145,728.00
396,500.00
121,800.00
64,480.00
2,620,050.96
262,005.10
2,882,056.06
1,042,139.27 =
32,900.00 =
325,000.00 =
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
3,809,019.05
240,499.00
325,000.00
4,374,518.05
437,451.80
4,811,969.85
110,600.00
727,469.00
39,600.00
396,500.00
40,600.00
6,200.00
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
663,600.00
2,655,261.85
289,080.00
396,500.00
243,600.00
74,400.00
4,322,441.85
432,244.19
4,754,686.04
110,600.00
104,300.00
6,200.00
5,400.00
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
508,760.00
80,311.00
50,840.00
55,080.00
694,991.00
69,499.10
764,490.10
Sub total :
Total Harga
Sub total :
Total Harga
Sub total :
Total Harga
Sub total :
Total Harga
Sub total :
Total Harga
110,600.00
104,300.00
6,200.00
5,400.00
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,061,760.00
222,159.00
93,000.00
126,360.00
1,503,279.00
150,327.90
1,653,606.90
110,600.00
104,300.00
6,200.00
5,400.00
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
575,120.00
112,644.00
55,800.00
63,720.00
807,284.00
80,728.40
888,012.40
110,600.00
104,300.00
6,200.00
5,400.00
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
331,800.00
58,408.00
37,200.00
32,400.00
459,808.00
45,980.80
505,788.80
37,500.00 =
850,000.00 =
16,500.00 =
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
609,375.00
13,753,000.00
998,250.00
15,360,625.00
1,536,062.50
16,896,687.50
37,500.00
850,000.00
110,000.00
27,900.00
16,500.00
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
40,132,750.00
660,000.00
167,400.00
40,960,150.00
4,096,015.00
45,056,165.00
37,500.00
850,000.00
110,000.00
27,900.00
=
=
=
=
Rp
Rp
Rp
Rp
40,132,750.00
660,000.00
167,400.00
Sub total :
Total Harga
Sub total :
Total Harga
Sub total :
Total Harga
Sub total :
Total Harga
Sub total :
Total Harga
Sub total :
Total Harga
16,500.00 =
=
=
=
Rp
Rp
Rp
Rp
40,960,150.00
4,096,015.00
45,056,165.00
37,500.00
850,000.00
91,800.00
27,900.00
16,500.00
Sub total :
Total Harga
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
###
###
40,132,750.00
550,800.00
167,400.00
40,850,950.00
4,085,095.00
44,936,045.00
No.
URAIAN
No.
URAIAN
Paku 5 - 7 Cm
Pengecatan Cat Minyak 2x Bag. Luar
Ongkos Pasang
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
5
No.
URAIAN
No.
URAIAN
Mandor
Jumlah
Dibulatkan
10
No.
11
12
13
URAIAN
No.
14
URAIAN
No.
15
16
17
URAIAN
No.
18
URAIAN
No.
19
20
21
22
URAIAN
No.
URAIAN
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
23
No.
24
25
26
27
URAIAN
No.
URAIAN
Jumlah
Dibulatkan
28
No.
29
30
URAIAN
Instalasi Penerangan
Kabel NYM 3Cx2,5 Sqmm
Pipa Konduit dia 20 mm2 (3/4")
Accessories & Peralatan
Upah Pasang
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
KOEFISIEN
0.01
0.02
0.50
10.00 %
0.01
0.04
0.16
10.00 %
0.10
0.25
1.10
0.50
0.10
0.25
70.00
0.02
0.15
10.00 %
1.20
0.04
SATUAN
HARGA
SATUAN
(Rp.)
JUMLAH
[4 x 6]
(Rp.)
OH
OH
Lot
103,800.00
88,200.00
2,802.00
4,203.00
M3
Kg
Ls
2,750,000.00
15,000.00
28,070.00
32,420.85
M3
Kg
Lbr
Lbr
Zak
M3
Bh
Lot
Ls
2,750,000.00
15,000.00
40,000.00
62,100.00
62,000.00
248,800.00
500.00
457,200.00
466,344.00
536,295.60
Lbr
M3
40,000.00
2,750,000.00
1,038.00
1,764.00
1,401.00
4,203.00
420.30
4,623.30
4,623.00
27,500.00
570.00
4,350.85
32,420.85
3,242.09
35,662.94
35,662.00
275,000.00
3,750.00
44,000.00
31,050.00
6,200.00
62,200.00
35,000.00
9,144.00
69,951.60
536,295.60
53,629.56
589,925.16
589,925.00
48,000.00
99,000.00
KOEFISIEN
0.20
1.80
0.20
10.00 %
0.40
0.04
1.00
10.00 %
SATUAN
HARGA
SATUAN
(Rp.)
JUMLAH
[4 x 6]
(Rp.)
Kg
M2
Ls
15,000.00
18,000.00
182,400.00
218,880.00
OH
OH
ls
88,200.00
135,200.00
5,000.00
45,688.00
3,000.00
32,400.00
36,480.00
218,880.00
21,888.00
240,768.00
240,768.00
35,280.00
5,408.00
5,000.00
45,688.00
4,568.80
50,256.80
50,256.00
KOEFISIEN
0.19
0.02
1.00
10.00 %
1.20
0.30
0.01
10.00 %
4.36
0.87
0.52
1.65
0.25
0.03
0.08
10.00 %
0.02
0.50
0.20
4.00
0.15
0.20
0.20
SATUAN
HARGA
SATUAN
(Rp.)
JUMLAH
[4 x 6]
(Rp.)
OH
OH
ls
88,200.00
135,200.00
5,000.00
24,503.20
M3
OH
OH
190,000.00
88,200.00
135,200.00
255,812.00
Zak
M3
M3
Org
Org
Org
Org
62,000.00
247,500.00
250,100.00
88,200.00
103,800.00
119,600.00
135,200.00
800,983.00
M3
Kg
Lt
Btg
OH
OH
OH
1,550,000.00
15,000.00
33,600.00
21,500.00
88,200.00
103,800.00
119,600.00
16,934.40
2,568.80
5,000.00
24,503.20
2,450.32
26,953.52
26,953.00
228,000.00
26,460.00
1,352.00
255,812.00
25,581.20
281,393.20
281,393.00
270,320.00
215,325.00
130,052.00
145,530.00
25,950.00
2,990.00
10,816.00
800,983.00
80,098.30
881,081.30
881,081.00
24,800.00
7,500.00
6,720.00
86,000.00
13,230.00
20,760.00
23,920.00
KOEFISIEN
SATUAN
HARGA
SATUAN
(Rp.)
JUMLAH
[4 x 6]
(Rp.)
0.02
OH
135,200.00
2,298.40
185,228.40
185,228.00
1.20
0.30
0.78
0.39
0.04
0.04
M3
M3
OH
OH
OH
OH
221,500.00
190,000.00
88,200.00
103,800.00
119,600.00
135,200.00
442,015.20
265,800.00
57,000.00
68,796.00
40,482.00
4,664.40
5,272.80
442,015.20
44,201.52
486,216.72
486,216.00
10.00 %
KOEFISIEN
1.10
2.72
0.54
1.50
0.60
0.06
0.08
1.00
10.00 %
1.10
0.12
0.03
0.19
0.23
0.04
0.03
10.00 %
1.70
0.03
0.11
0.02
0.01
0.00
0.40
10.00 %
SATUAN
HARGA
SATUAN
(Rp.)
JUMLAH
[4 x 6]
(Rp.)
M3
Zak
M3
OH
OH
OH
OH
ls
221,500.00
62,000.00
248,800.00
88,200.00
103,800.00
119,600.00
135,200.00
50,000.00
809,533.20
M2
Zak
M3
OH
OH
OH
OH
140,000.00
62,000.00
248,800.00
88,200.00
103,800.00
119,600.00
135,200.00
218,100.06
bh
m
OH
OH
OH
OH
ls
14,000.00
45,688.00
88,200.00
103,800.00
119,600.00
135,200.00
5,000.00
40,861.84
243,650.00
168,640.00
135,347.20
132,300.00
62,280.00
7,176.00
10,140.00
50,000.00
809,533.20
80,953.32
890,486.52
890,486.00
154,000.00
7,440.00
7,712.80
16,537.50
23,355.00
4,485.00
4,569.76
218,100.06
21,810.01
239,910.07
239,910.00
23,800.00
1,370.64
9,702.00
2,283.60
1,435.20
270.40
2,000.00
40,861.84
4,086.18
44,948.02
44,948.00
KOEFISIEN
0.02
2.00
0.30
0.03
0.60
2.00
0.20
0.03
10.00 %
SATUAN
HARGA
SATUAN
(Rp.)
M3
Lbr
Kg
Kg
OH
OH
OH
OH
5,600,000.00
98,000.00
20,000.00
18,000.00
88,200.00
103,800.00
119,600.00
135,200.00
600,796.00
JUMLAH
[4 x 6]
(Rp.)
109,760.00
196,000.00
6,000.00
540.00
52,920.00
207,600.00
23,920.00
4,056.00
600,796.00
60,079.60
660,875.60
660,875.00
KOEFISIEN
0.02
1.00
1.00
1.00
0.06
0.50
0.60
2.00
0.20
0.03
10.00 %
1.10
1.00
0.04
0.06
0.01
0.00
10.00 %
1.10
1.00
0.04
0.06
0.01
0.00
10.00 %
SATUAN
HARGA
SATUAN
(Rp.)
JUMLAH
[4 x 6]
(Rp.)
M3
Lbr
Lbr
Lbr
Kg
Kg
OH
OH
OH
OH
5,600,000.00
98,000.00
64,000.00
90,000.00
18,000.00
20,000.00
88,200.00
103,800.00
119,600.00
135,200.00
661,336.00
M'
Set
Org
Org
Org
Org
8,500.00
2,125.00
88,200.00
103,800.00
119,600.00
135,200.00
21,839.16
M'
Set
Org
Org
Org
Org
10,000.00
2,500.00
88,200.00
103,800.00
119,600.00
135,200.00
23,864.16
109,760.00
98,000.00
64,000.00
90,000.00
1,080.00
10,000.00
52,920.00
207,600.00
23,920.00
4,056.00
661,336.00
66,133.60
727,469.60
727,469.00
9,350.00
2,125.00
3,175.20
6,228.00
717.60
243.36
21,839.16
2,183.92
24,023.08
24,023.00
11,000.00
2,500.00
3,175.20
6,228.00
717.60
243.36
23,864.16
2,386.42
26,250.58
26,250.00
KOEFISIEN
1.10
1.00
0.04
0.06
0.01
0.00
10.00 %
SATUAN
HARGA
SATUAN
(Rp.)
JUMLAH
[4 x 6]
(Rp.)
M'
Set
Org
Org
Org
Org
12,000.00
3,000.00
88,200.00
103,800.00
119,600.00
135,200.00
26,564.16
13,200.00
3,000.00
3,175.20
6,228.00
717.60
243.36
26,564.16
2,656.42
29,220.58
29,220.00
KOEFISIEN
1.10
1.00
0.04
0.06
0.01
0.00
10.00 %
1.10
1.00
0.04
0.06
0.01
0.00
10.00 %
1.10
1.00
0.04
0.06
0.01
0.00
10.00 %
1.10
1.00
0.04
SATUAN
HARGA
SATUAN
(Rp.)
JUMLAH
[4 x 6]
(Rp.)
M'
Set
Org
Org
Org
Org
14,000.00
3,500.00
88,200.00
103,800.00
119,600.00
135,200.00
29,264.16
M'
Set
Org
Org
Org
Org
16,500.00
4,125.00
88,200.00
103,800.00
119,600.00
135,200.00
32,639.16
M'
Set
Org
Org
Org
Org
23,000.00
5,750.00
88,200.00
103,800.00
119,600.00
135,200.00
41,414.16
M'
Set
Org
30,000.00
7,500.00
88,200.00
15,400.00
3,500.00
3,175.20
6,228.00
717.60
243.36
29,264.16
2,926.42
32,190.58
32,190.00
18,150.00
4,125.00
3,175.20
6,228.00
717.60
243.36
32,639.16
3,263.92
35,903.08
35,903.00
25,300.00
5,750.00
3,175.20
6,228.00
717.60
243.36
41,414.16
4,141.42
45,555.58
45,555.00
33,000.00
7,500.00
3,175.20
KOEFISIEN
0.06
0.01
0.00
10.00 %
1.10
1.00
0.04
0.06
0.01
0.00
10.00 %
SATUAN
HARGA
SATUAN
(Rp.)
JUMLAH
[4 x 6]
(Rp.)
Org
Org
Org
103,800.00
119,600.00
135,200.00
50,864.16
M'
Set
Org
Org
Org
Org
40,000.00
10,000.00
88,200.00
103,800.00
119,600.00
135,200.00
64,364.16
6,228.00
717.60
243.36
50,864.16
5,086.42
55,950.58
55,950.00
44,000.00
10,000.00
3,175.20
6,228.00
717.60
243.36
64,364.16
6,436.42
70,800.58
70,800.00
KOEFISIEN
1.10
1.00
0.04
0.06
0.01
0.00
10.00 %
1.10
1.00
0.04
0.06
0.01
0.00
10.00 %
1.00
1.00
1.00
10.00 %
1.00
1.00
1.00
10.00 %
SATUAN
HARGA
SATUAN
(Rp.)
JUMLAH
[4 x 6]
(Rp.)
M'
Set
Org
Org
Org
Org
50,000.00
12,500.00
88,200.00
103,800.00
119,600.00
135,200.00
77,864.16
M'
Set
Org
Org
Org
Org
70,000.00
17,500.00
88,200.00
103,800.00
119,600.00
135,200.00
104,864.16
bh
ls
ls
x
bh
ls
ls
x
20,000.00
2,000.00
5,000.00
27,000.00
30,000.00
2,000.00
5,000.00
37,000.00
55,000.00
12,500.00
3,175.20
6,228.00
717.60
243.36
77,864.16
7,786.42
85,650.58
85,650.00
77,000.00
17,500.00
3,175.20
6,228.00
717.60
243.36
104,864.16
10,486.42
115,350.58
115,350.00
20,000.00
2,000.00
5,000.00
27,000.00
2,700.00
29,700.00
29,700.00
30,000.00
2,000.00
5,000.00
37,000.00
3,700.00
KOEFISIEN
SATUAN
HARGA
SATUAN
(Rp.)
JUMLAH
[4 x 6]
(Rp.)
40,700.00
40,700.00
1.00
1.00
1.00
10.00 %
bh
ls
ls
x
40,000.00
2,000.00
5,000.00
47,000.00
40,000.00
2,000.00
5,000.00
47,000.00
4,700.00
51,700.00
51,700.00
KOEFISIEN
15.00
15.00
1.00
1.00
10.00 %
1.00
1.00
1.00
10.00 %
SATUAN
HARGA
SATUAN
(Rp.)
m'
m'
ls
ls
x
JUMLAH
[4 x 6]
(Rp.)
11,000.00
2,200.00
5,000.00
30,000.00
233,000.00
bh
ls
ls
22,000.00
2,000.00
12,500.00
36,500.00
165,000.00
33,000.00
5,000.00
30,000.00
233,000.00
23,300.00
256,300.00
256,300.00
22,000.00
2,000.00
12,500.00
36,500.00
3,650.00
40,150.00
40,150.00
URAIAN
ANALISA
2
3
PEKERJAAN KUSEN ALUMINIUM
106
KC-1
1 M2 PAS. KACA RAYBAND 5 MM
a.
Kaca Rayband 5 mm
b.
Pekerja
c.
Tukang Kayu
Jumlah
Dibulatkan
107
KC-2
a.
b.
c.
108
KC-3
a.
b.
c.
109
KC-4
a.
b.
c.
110
KC-5
a.
b.
c.
111
KC-5
a.
b.
c.
112
KS-1
2
a.
b.
c.
d.
e.
113
KS-2
a.
b.
c.
d.
e.
3
Kusen Aluminium Atas & Antara 6"
Kusen Aluminium Bawah 4"
Kaca Tempered t. 12 mm
Over Panel Pivot Patch, Top Patch, Boottom Patch, Bottom
Patch, Bottom Lock, Floor Hing & Hendle Stainless
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN PINTU & JENDELA PJ2
Kusen Aluminium Atas & Antara 6"
Kusen Aluminium Bawah 4"
Kaca Tempered t. 12 mm
Over Panel Pivot Patch, Top Patch, Boottom Patch, Bottom
Patch, Bottom Lock, Floor Hing & Hendle Stainless
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
2
114
KS-3
a.
b.
c.
d.
3
1 BH KUSEN PINTU PD1A
Kusen Aluminium Atas & Antara 6"
Kaca Tempered t. 12 mm
Over Panel Pivot Patch, Top Patch, Boottom Patch, Bottom
Patch, Bottom Lock, Floor Hing & Hendle Stainless
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
115
KS-4
a.
b.
c.
d.
e.
f.
g.
h.
I.
j.
116
KS-5
a.
b.
c.
d.
e.
f.
g.
h.
117
KS-6
a.
b.
c.
d.
e.
1 BH KUSEN TYPE P1
Kusen Aluminium 1 1/2 x 3" Warna
Sealant
Daun Double Megateak
Kayu Kuat Kelas II (Kamper)
Engsel Pintu
Kunci Pintu 2 Putaran
2
f.
g.
118
KS-7
a.
b.
c.
d.
e.
f.
g.
3
Melamic Daun Pintu
Upah Pasang
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH KUSEN TYPE P2
Kusen Aluminium 1 1/2 x 3" Warna
Sealant
Daun Megateak + Formica
Kayu Kuat Kelas II (Kamper)
Engsel Pintu
Kunci Pintu KM Bulat
Melamic Daun Pintu
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
2
119
KS-8
a.
b.
c.
d.
e.
f.
g.
3
1 BH KUSEN TYPE P3
Kusen Aluminium 1 1/2 x 3" Warna
Sealant
Daun Double Megateak
Kayu Kuat Kelas II (Kamper)
Engsel Pintu
Kunci Pintu KM Bulat
Melamic Daun Pintu
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
120
KS-9
a.
c.
d.
e.
f.
g.
121
KS-10
a.
b.
c.
d.
e.
f.
g.
122
KS-11
a.
b.
c.
d.
e.
f.
g.
123
KS-12
a.
b.
c.
d.
3
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH KUSEN JENDELA J1
Kusen Aluminium Atas & Antara 6"
Kusen Aluminium Bawah 4"
Kaca Tempered t. 12 mm
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
124
KS-13
a.
b.
c.
d.
125
KS-14
a.
b.
c.
d.
e.
f.
g.
h.
1 BH KUSEN JENDELA J2
Kusen Aluminium 1 1/2 x 3" Warna
Kaca Polos 5 mm
Karet
Sealant
Daun Jendela Aluminium
Engsel Casemet 16"
Rambuncis
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
126
KS-15
a.
b.
c.
d.
e.
f.
g.
h.
1 BH KUSEN JENDELA J3
Kusen Aluminium 1 1/2 x 3" Warna
Kaca Polos 5 mm
Karet
Sealant
Daun Jendela Aluminium
Engsel Casemet 16"
Rambuncis
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
127
KS-16
a.
b.
c.
d.
e.
f.
g.
h.
1 BH KUSEN JENDELA J4
Kusen Aluminium 1 1/2 x 3" Warna
Kaca Polos 5 mm
Karet
Sealant
Daun Jendela Aluminium
Engsel Casemet 16"
Rambuncis
Upah Pasang
Jumlah
Keuntungan Max.
=
3
Jumlah
Dibulatkan
128
KS-17
a.
b.
c.
d.
1 BH KUSEN J5
Kusen Aluminium Atas & Bawah 3"
Kaca Tempered t. 12 mm
Kusen Aluminium Tengah/Tegak 6"
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
129
KS-18
a.
b.
c.
d.
1 BH KUSEN J6
Kusen Aluminium Atas & Bawah 3"
Kaca Tempered t. 12 mm
Kusen Aluminium Tengah/Tegak 6"
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
130
KS-19
a.
b.
c.
d.
e.
f.
g.
h.
1 BH KUSEN JENDELA J7
Kusen Aluminium 1 1/2 x 3" Warna
Kaca Polos 5 mm
Karet
Sealant
Daun Jendela Aluminium
Engsel Casemet 16"
Rambuncis
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
131
KS-20
a.
b.
c.
d.
e.
1 BH KUSEN JENDELA J8
Kusen Aluminium 1 1/2 x 3" Warna
Kaca Polos 5 mm
Karet
Sealant
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
132
KS-21
a.
1 BH KUSEN JENDELA J9
Kusen Aluminium 1 1/2 x 3" Warna
2
b.
c.
d.
e.
3
Kaca Polos 8 mm
Karet
Sealant
Upah Pasang
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
133
KS-22
a.
b.
c.
d.
e.
1 BH KUSEN JENDELA B1
Kusen Aluminium 1 1/2 x 3" Warna
Kaca Polos 5 mm
Karet
Sealant
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
134
KS-23
a.
b.
c.
d.
e.
1 BH KUSEN JENDELA B2
Kusen Aluminium 1 1/2 x 3" Warna
Kaca Polos 5 mm
Karet
Sealant
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
135
PTS
a.
b.
c.
d.
e.
1 M2 DINDING PARTISI
Panel Double Gypsum t. 9 mm
Rangka Pipa Hollow 40X40
Rangka Pipa Hollow 40X20
Upah Pasang dan Alat Bantu
Pengecatan dengan cat tembok
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
136
RAILL-1
a.
b.
d.
e.
f.
137
RAILL-2
a.
b.
c.
d.
e.
KOEFISIEN
SATUAN
HARGA
SATUAN
(Rp.)
6
JUMLAH
[4 x 6]
(Rp.)
7
1.05
0.02
0.15
M2
Org
Org
85,000.00
88,200.00
103,800.00
89,250.00
1,323.00
15,570.00
106,143.00
106,143.00
1.05
0.02
0.15
M2
Org
Org
180,000.00
88,200.00
103,800.00
189,000.00
1,323.00
15,570.00
205,893.00
205,893.00
1.05
0.02
0.15
M2
Org
Org
75,000.00
88,200.00
103,800.00
78,750.00
1,323.00
15,570.00
95,643.00
95,643.00
1.05
0.02
0.15
M2
Org
Org
120,000.00
88,200.00
103,800.00
126,000.00
1,323.00
15,570.00
142,893.00
142,893.00
1.05
0.02
0.15
M2
Org
Org
145,000.00
88,200.00
103,800.00
152,250.00
1,323.00
15,570.00
169,143.00
169,143.00
1.05
0.02
0.15
M2
Org
Org
850,000.00
88,200.00
103,800.00
892,500.00
1,323.00
15,570.00
909,393.00
909,393.00
4
45.70
18.05
71.98
6.00
5
M'
M'
M2
Set
6
150,000.00
110,000.00
909,393.00
1,500,000.00
0.02
Lot
74,296,334.66
10.00
7
6,855,000.00
1,985,500.00
65,455,834.66
9,000,000.00
84,782,261.35
1,485,926.69
84,782,261.35
8,478,226.14
93,260,487.49
93,260,487.00
7.20
2.00
11.34
2.00
M'
M'
M2
Set
150,000.00
110,000.00
909,393.00
1,500,000.00
1,080,000.00
220,000.00
10,312,516.62
3,000,000.00
0.02
Lot
11,612,516.62
232,250.33
14,844,766.95
1,484,476.70
16,329,243.65
16,329,243.00
10.00
14,844,766.95
9.60
15.12
6.00
M'
M2
Set
150,000.00
909,393.00
1,500,000.00
1,440,000.00
13,750,022.16
9,000,000.00
0.02
Lot
15,190,022.16
303,800.44
24,493,822.60
2,449,382.26
26,943,204.86
26,943,204.00
10.00
21.09
2.53
10.60
12.00
11.60
6.00
1.00
2.00
2.00
0.10
10.00
M'
M2
M'
M'
M'
Ps
Unit
Ps
Ps
Lot
%
24,493,822.60
105,000.00
106,143.00
3,000.00
7,500.00
85,000.00
15,000.00
200,000.00
125,000.00
350,000.00
4,830,791.79
x
5,313,870.97
2,214,450.00
268,541.79
31,800.00
90,000.00
986,000.00
90,000.00
200,000.00
250,000.00
700,000.00
483,079.18
5,313,870.97
531,387.10
5,845,258.07
5,845,258.00
5.60
11.20
2.52
M'
M'
M2
105,000.00
7,500.00
506,000.00
588,000.00
84,000.00
1,275,120.00
6.00
1.00
2.00
5.04
0.10
Ps
Unit
Ps
M2
Lot
15,000.00
200,000.00
30,000.00
80,000.00
2,297,120.00
90,000.00
200,000.00
60,000.00
403,200.00
229,712.00
2,930,032.00
293,003.20
3,223,035.20
3,223,035.00
10.00
2,930,032.00
5.20
10.40
1.68
M'
M'
M2
105,000.00
7,500.00
506,000.00
546,000.00
78,000.00
850,080.00
3.00
1.00
Ps
Unit
15,000.00
200,000.00
45,000.00
200,000.00
5
M2
Lot
3.36
0.10
10.00
6
80,000.00
1,987,880.00
x
2,186,668.00
7
268,800.00
198,788.00
2,186,668.00
218,666.80
2,405,334.80
2,405,334.00
5.10
10.20
1.47
M'
M'
M2
105,000.00
7,500.00
506,000.00
535,500.00
76,500.00
743,820.00
3.00
1.00
1.47
0.05
Ps
Unit
M2
Lot
15,000.00
40,000.00
80,000.00
1,558,420.00
45,000.00
40,000.00
117,600.00
77,921.00
1,636,341.00
163,634.10
1,799,975.10
1,799,975.00
10.00
1,636,341.00
5.10
10.20
1.47
M'
M'
M2
105,000.00
7,500.00
250,000.00
535,500.00
76,500.00
367,500.00
3.00
1.00
2.94
0.05
Ps
Unit
M2
Lot
15,000.00
200,000.00
80,000.00
1,459,700.00
45,000.00
200,000.00
235,200.00
72,985.00
1,532,685.00
153,268.50
1,685,953.50
1,685,953.00
10.00
1.00
1.00
3.00
1.00
4.40
0.05
10.00
Unit
Unit
Ps
Unit
M2
Lot
%
1,532,685.00
750,000.00
1,500,000.00
25,000.00
200,000.00
45,000.00
2,723,000.00
x
2,859,150.00
750,000.00
1,500,000.00
75,000.00
200,000.00
198,000.00
136,150.00
2,859,150.00
285,915.00
3,145,065.00
3,145,065.00
4.70
9.40
1.13
M'
M'
M2
105,000.00
7,500.00
250,000.00
493,500.00
70,500.00
282,500.00
2.00
1.00
2.26
0.05
Ps
Unit
M2
Lot
15,000.00
200,000.00
80,000.00
1,257,300.00
30,000.00
200,000.00
180,800.00
62,865.00
1,320,165.00
132,016.50
1,452,181.50
1,452,181.00
10.00
1,320,165.00
3.90
7.80
0.62
M'
M'
M2
105,000.00
7,500.00
250,000.00
409,500.00
58,500.00
155,000.00
2.00
1.00
1.24
0.05
Ps
Unit
M2
Lot
15,000.00
200,000.00
80,000.00
952,200.00
30,000.00
200,000.00
99,200.00
47,610.00
5
10.00
15.60
7.80
33.54
0.02
10.00
6
x
M'
M'
M2
Lot
%
999,810.00
150,000.00
110,000.00
909,393.00
33,699,041.22
x
34,373,022.04
7
999,810.00
99,981.00
1,099,791.00
1,099,791.00
2,340,000.00
858,000.00
30,501,041.22
673,980.82
34,373,022.04
3,437,302.20
37,810,324.25
37,810,324.00
14.60
7.30
31.39
0.02
10.00
M'
M'
M2
Lot
%
17.80
5.30
23.90
19.80
16.20
4.00
4.00
0.05
10.00
5,094,713.30
150,000.00
95,643.00
3,000.00
7,500.00
75,000.00
45,000.00
15,000.00
2,404,243.20
x
M'
M2
M'
M'
M'
Ps
Bh
Lot
%
32,169,623.20
150,000.00
95,643.00
3,000.00
7,500.00
75,000.00
45,000.00
15,000.00
4,852,107.90
M'
M2
M'
M'
M'
Ps
Bh
Lot
23.60
7.60
33.00
23.60
7.80
2.00
2.00
0.05
10.00
150,000.00
110,000.00
909,393.00
31,538,846.27
M'
M2
M'
M'
M'
Ps
Bh
Lot
9.20
2.40
10.90
13.60
7.20
2.00
2.00
0.05
10.00
2,524,455.36
150,000.00
95,643.00
3,000.00
7,500.00
75,000.00
45,000.00
15,000.00
5,247,886.80
x
5,510,281.14
2,190,000.00
803,000.00
28,545,846.27
630,776.93
32,169,623.20
3,216,962.32
35,386,585.51
35,386,585.00
2,670,000.00
506,907.90
71,700.00
148,500.00
1,215,000.00
180,000.00
60,000.00
242,605.40
5,094,713.30
509,471.33
5,604,184.62
5,604,184.00
1,380,000.00
229,543.20
32,700.00
102,000.00
540,000.00
90,000.00
30,000.00
120,212.16
2,524,455.36
252,445.54
2,776,900.90
2,776,900.00
3,540,000.00
726,886.80
99,000.00
177,000.00
585,000.00
90,000.00
30,000.00
262,394.34
5,510,281.14
551,028.11
7
6,061,309.25
6,061,309.00
24.20
43.56
24.20
0.02
10.00
M'
M2
M'
Lot
%
22.00
39.60
22.00
0.02
10.00
17.20
M'
M2
M'
M'
Lot
8,043,913.24
150,000.00
95,643.00
3,000.00
7,500.00
4,852,107.90
x
M'
43,398,202.06
150,000.00
95,643.00
3,000.00
7,500.00
75,000.00
45,000.00
15,000.00
7,660,869.75
x
47,738,022.26
150,000.00
909,393.00
150,000.00
39,311,962.80
M'
M2
M'
M'
M'
Ps
Bh
Lot
3.60
0.72
3.40
7.20
0.05
10.00
M'
M2
M'
Lot
33.80
13.25
50.20
32.40
10.80
2.00
2.00
0.05
10.00
150,000.00
909,393.00
150,000.00
43,243,159.08
915,668.36
150,000.00
3,630,000.00
39,613,159.08
3,630,000.00
864,863.18
47,738,022.26
4,773,802.23
52,511,824.49
52,511,824.00
3,300,000.00
36,011,962.80
3,300,000.00
786,239.26
43,398,202.06
4,339,820.21
47,738,022.26
47,738,022.00
5,070,000.00
1,267,269.75
150,600.00
243,000.00
810,000.00
90,000.00
30,000.00
383,043.49
8,043,913.24
804,391.32
8,848,304.56
8,848,304.00
540,000.00
68,862.96
10,200.00
54,000.00
242,605.40
915,668.36
91,566.84
1,007,235.19
1,007,235.00
2,580,000.00
5
M2
M'
M'
Lot
12.24
17.20
34.40
0.05
10.00
3.80
0.66
2.10
3.80
0.05
10.00
703,315.60
150,000.00
95,643.00
3,000.00
8,000.00
1,436,041.66
x
M2
M2
M'
M'
M2
M2
%
4,888,600.84
150,000.00
95,643.00
3,000.00
8,000.00
669,824.38
M'
M2
M'
M'
Lot
1.00
2.00
1.00
1.50
1.00
2.00
10.00
M'
M2
M'
M'
Lot
7.70
1.62
4.70
14.00
0.05
10.00
6
142,893.00
3,000.00
8,000.00
4,655,810.32
1,507,843.74
24,400.00
8,000.00
6,000.00
5,000.00
20,066.86
x
110,933.72
7
1,749,010.32
51,600.00
275,200.00
232,790.52
4,888,600.84
488,860.08
5,377,460.92
5,377,460.00
570,000.00
63,124.38
6,300.00
30,400.00
33,491.22
703,315.60
70,331.56
773,647.16
773,647.00
1,155,000.00
154,941.66
14,100.00
112,000.00
71,802.08
1,507,843.74
150,784.37
1,658,628.12
1,658,628.00
48,800.00
8,000.00
9,000.00
5,000.00
40,133.72
110,933.72
11,093.37
122,027.09
122,027.00
2.00
4.00
1.00
1.00
0.10
10.00
M'
M'
Lot
M'
Lot
%
1.00
0.20
2.00
0.15
0.05
10.00
110,000.00
80,000.00
75,000.00
20,000.00
615,000.00
x
M'
M'
Bh
M2
Lot
%
696,500.00
110,000.00
80,000.00
20,000.00
10,000.00
166,000.00
x
175,800.00
220,000.00
320,000.00
75,000.00
20,000.00
61,500.00
696,500.00
69,650.00
766,150.00
766,150.00
110,000.00
16,000.00
40,000.00
1,500.00
8,300.00
175,800.00
17,580.00
193,380.00
193,380.00
DAFTAR H
No.
JENIS
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
U PAH
PEKERJA
TUKANG GALI
TUKANG BATU
KEPALA TUKANG BATU
TUKANG KAYU
KEPALA TUKANG KAYU
TUKANG CAT/PLITUR
KEPALA TUKANG CAT/PLITUR
TUKANG BESI BETON
KEPALA TUKANG BESI BETON
TUKANG BESI PROFIL
KEPALA TUKANG BESI PROFIL
PEMBANTU OPERATOR
OPERATOR TERLATIH
SUPIR TERAMPIL
PEMBANTU SUPIR
MAN D O R
II.
A.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
BAHAN
BAHAN AGREGAT KASAR, BAHAN PEREKAT & BAHA
PASIR URUG
PASIR PASANG
PASIR BETON
BATU PECAH 1-2 CM
BATU PECAH MESIN 2/3
BATU PECAH MESIN 3/5
BATU PECAH 5-7 CM
BATU BELAH UNTUK PONDASI
BATU ANDESIT
BATU TEMPEL HITAM
BATA MERAH BAKAR KEAS I
BATA MERAH BAKAR KELAS II
BATA CONBLOCK 40x20x10 CM
BATA RINGAN RINGAN T. 10 CM
BATA RINGAN RINGAN T. 6 CM
MURTAR UTAMA MU.380 ( PASANGAN )
No.
JENIS
17
18
19
20
21
22
22
23
24
25
26
27
28
29
30
31
B.
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
No.
JENIS
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
KUMPON
MELAMIN SENDING SILLER MSS 123
AMPELAS DUCO
VERNIS (COPAL)
PLITUR JADI (KEMUDI)
DEMPUL KAYU
MENI KAYU/BESI (GENTONG)
CAT KAYU (AVIAN)
CAT KAYU (DECOLUX)
CAT BESI (AVIAN)
CAT BESI (DECOLUX)
FLINGCOAT (GENTONG)
MINYAK BAKAR SOLAR
MINYAK BAKAR PREMIUM
MINYAK TANAH
MINYAK PELUMAS
INJUK
WATER PROOFING (NO DROP)
WATER PROOFING (AQUA PROF)
C.
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
KAYU DOLKEN 8 - 10 CM
KUSEN KAYU KAMPER FINISH MELAMIC 6x4 CM
PLINT MULTIPLEKS LAPIS MEGATEAK FINISH MELAM
LIST MULTIPLEKS LAPIS MEGATEAK FINISH MELAMIC
LIST MULTIPLEKS LAPIS MEGATEAK FINISH MELAMIC
No.
JENIS
91
92
D.
93
94
95
96
97
98
99
100
101
102
E.
103
104
105
106
107
108
F.
109
110
111
112
113
114
115
116
117
No.
JENIS
G.
118
119
120
121
122
123
124
125
126
127
128
129
130
131
G.
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
No.
JENIS
155
156
157
158
159
160
161
162
163
164
H.
165
166
167
168
169
170
171
172
173
BAHAN KACA
KACA POLOS 5 MM
KACA RAYBAN 5 MM
KACA POLOS 8 MM
KACA RAYBAN 8 MM
KACA POLOS 10 MM
KACA ES 5 MM
KACA ES 8 MM
KACA TEMPERED 12 MM
DAUN PINTU KACA TEMPERED 12 MM
I.
174
175
176
177
178
179
180
181
J.
182
183
184
185
186
187
188
BAHAN SANITAIR
CLOSET DUDUK LENGKAP ASSESORIES SEK. TOTO
CLOSET JONGKOK TOTO
WASTAFEL LENGKAP ASSESORIES SEK. TOTO
URINOIR MUSLIM LENGKAP ASSESORIES SEK. TOTO
SEKAT URINOIR LENGKAP ASSESORIES SEK. TOTO
KITCHEN ZINK
TEMPAT SABUN STAINLESS
No.
JENIS
189
190
191
192
193
194
195
196
197
198
K.
199
200
201
202
203
204
205
206
207
208
209
210
211
K.
212
213
214
215
216
217
218
219
220
221
222
223
224
BAHAN PIPA
PIPA GSP MEDIUM 1/2 "
PIPA GSP MEDIUM 3/4 "
PIPA GSP MEDIUM 1 "
PIPA GSP MEDIUM 1 1/4 "
PIPA GSP MEDIUM 1 1/2"
PIPA GSP MEDIUM 2"
GATE VALVE 2"
GATE VALVE 1 1/2"
GATE VALVE 1 1/4"
GATE VALVE 1"
CHECK VALVE 2"
FLEXIBLE JOINT 2"
Y STAINER 2"
No.
JENIS
225
226
227
228
229
230
Y STAINER 1 1/4"
FLOAT VALVE 1"
FLOAT VALVE 2"
WLC, TERMASUK KABEL KONTROL
PRESSURE GAUGE
HEADER 3"
L.
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
BAHAN ELEKTRIKAL
Lampu Baret Persegi TL Bulat 20 W
Downlight PLE 14 w (E27)
Lampu Roset PLE 11 W (E27)
Armature 2 x 18 W (RM)
Armature 2 x 36 W (RM 300) ALML M2
Saklar Tunggal 10 A, 1 Phasa
Saklar Ganda 10 A, 1 Phasa
Saklar Hotel Tunggal 10 A, 1 Phasa
Saklar Hotel Ganda 10 A, 1 Phasa
Saklar Grid 4 Gang 10 A, 1 Phasa
Saklar Grid 6 Gang 10 A, 1 Phasa
Stop Kontak 16 A, 1 Phasa
Kabel NYY 4Cx10 Sqmm
Kabel NYY 4Cx6 Sqmm
Kabel NYM 3Cx2,5 Sqmm
Kabel NYA 1 x 4 mm
Kabel NYA 1Cx6 Sqmm
Conduit dia 20 mm (3/4")
Pipa Konduit dia 20 mm2 (3/4")
Kabel Tray 200 x 100 Sqmm
Kabel Tray 300 x 100 Sqmm
Kabel Ladder 300 x 100 Sqmm
Kabel Ladder 200 x 100 Sqmm
Tee 300 x 100 Sqmm
Elbow 300 x 100 Sqmm
Cross 300 x 100 Sqmm
Tee 200 x 100 Sqmm
Elbow 200 x 100 Sqmm
Cross 200 x 100 Sqmm
MCCB 100 A, 3 phasa
MCCB 50 A, 3 phasa
MCB 40 A, 3 phasa
No.
JENIS
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
MCB 32 A, 3 phasa
MCB 16 A, 1 phasa
MCB 10 A, 1 phasa
MCB 6 A, 1 phasa
Indicator Lamp
Fuse 4 A
Amper meter
Volt meter
Selector switch
Cosphi meter
CT 63 / 5A
Box Panel 600 x 500 x 250
Box Panel 1200 x800 x 400
Outlet Telephone
Kabel Stel K - 011 2 x 2 x 0,6 mm
Kabel Stel K - 011 10 x 2 x 0,6 mm
TB - T 10 pairs
Photo Electric Smoke Detector
Rate of Rise Heat Detector
Fixed Temperatur Heat Detector
Alarm Bell
Manual Push Button
MCFA 4 Zone
Anunciator
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
No.
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
JENIS
Kabel UTP Cat 6
Ceiling Speaker 3 w
Volume Kontrol
TB - TS. 10 pairs
Pre Recorder Evaluation
Compact Dist / MP3 Player
SM / FM Tuner
Emergency Microphone
Mixer Pre - Amplifier
Equalizer
Power Amplifier 1 x 240 w
Rack
MDF - SS 20 Pairs
Kabel NYMHY 3 x 2,5 mm2
SPLIT WALL 1 PK Wall mounted type
SPLIT WALL 2,5 PK Wall mounted type
SPLIT WALL 3 PK Wall cassette type
SPLIT WALL 4 PK Wall cassette type
SPLIT WALL 3/4 PK Wall mounted type
SPLIT WALL 5 PK Wall mounted type
HA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
JENIS
HA
OKER (MATAHARI)
EMPUL PLITUR
EMPUL HALUS.IMPRA (WOOD FILLER)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
JENIS
MINYAK PELUMAS
HA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
AYU DOLKEN 8 - 10 CM
USEN KAYU KAMPER FINISH MELAMIC 6x4 CM
LINT MULTIPLEKS LAPIS MEGATEAK FINISH MELAMIC 1,5/10 CM
IST MULTIPLEKS LAPIS MEGATEAK FINISH MELAMIC 1,5/4 CM
IST MULTIPLEKS LAPIS MEGATEAK FINISH MELAMIC 2/10 CM
Rp.
Rp.
Rp.
Rp.
Rp.
JENIS
HA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
JENIS
EM PUTIH (FOX)
EM KUNING (AICA/AIBON)
ESI SIKU EX DN
ESI PROFIL DN SII
REKSTANG BESI DIA. 12 MM
ESI BATANG TARIK DIA. 16 MM
ESI IKATAN ANGIN BESI DIA. 16 MM
HA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
JENIS
ACA POLOS 5 MM
ACA RAYBAN 5 MM
ACA POLOS 8 MM
ACA RAYBAN 8 MM
ACA POLOS 10 MM
ACA TEMPERED 12 MM
AUN PINTU KACA TEMPERED 12 MM
HA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
KRUP GYPSUM 5 CM
KRUP GYPSUM 3 CM
AUD DAN MUR 12 MM
AUD DAN MUR 19 MM
AUD ANGKUR 22 MM
AUD ANGKUR 25 MM
AHAN SANITAIR
LOSET DUDUK LENGKAP ASSESORIES SEK. TOTO
LOSET JONGKOK TOTO
WASTAFEL LENGKAP ASSESORIES SEK. TOTO
RINOIR MUSLIM LENGKAP ASSESORIES SEK. TOTO
EKAT URINOIR LENGKAP ASSESORIES SEK. TOTO
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
JENIS
AK FIBREGLASS STANDAR
ET WASHER SEK. TOTO
AND SHOWER SEK. TOTO
RAN TEMBOK SEK. TOTO
RAN GANDA SEK. TOTO
RAN BEBEK SEK. TOTO
LOOR DRAIN SEK. TOTO
HA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
STAINER 1 1/4"
LOAT VALVE 1"
LOAT VALVE 2"
WLC, TERMASUK KABEL KONTROL
RESSURE GAUGE
AHAN ELEKTRIKAL
ampu Baret Persegi TL Bulat 20 W
ownlight PLE 14 w (E27)
ampu Roset PLE 11 W (E27)
rmature 2 x 18 W (RM)
rmature 2 x 36 W (RM 300) ALML M2
aklar Tunggal 10 A, 1 Phasa
aklar Ganda 10 A, 1 Phasa
aklar Hotel Tunggal 10 A, 1 Phasa
aklar Hotel Ganda 10 A, 1 Phasa
aklar Grid 4 Gang 10 A, 1 Phasa
aklar Grid 6 Gang 10 A, 1 Phasa
top Kontak 16 A, 1 Phasa
abel NYY 4Cx10 Sqmm
abel NYY 4Cx6 Sqmm
abel NYM 3Cx2,5 Sqmm
abel NYA 1 x 4 mm
abel NYA 1Cx6 Sqmm
onduit dia 20 mm (3/4")
ipa Konduit dia 20 mm2 (3/4")
abel Tray 200 x 100 Sqmm
abel Tray 300 x 100 Sqmm
abel Ladder 300 x 100 Sqmm
abel Ladder 200 x 100 Sqmm
ee 300 x 100 Sqmm
lbow 300 x 100 Sqmm
ross 300 x 100 Sqmm
ee 200 x 100 Sqmm
lbow 200 x 100 Sqmm
ross 200 x 100 Sqmm
MCCB 100 A, 3 phasa
MCCB 50 A, 3 phasa
MCB 40 A, 3 phasa
JENIS
HA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
MCB 32 A, 3 phasa
MCB 16 A, 1 phasa
MCB 10 A, 1 phasa
MCB 6 A, 1 phasa
MDF - TP 80 pairs
UB / Switch 24 ports
antch Panel HUB / Switch 8 ports
JENIS
HA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
eiling Speaker 3 w
re Recorder Evaluation
ompact Dist / MP3 Player
mergency Microphone
Mixer Pre - Amplifier
MDF - SS 20 Pairs
abel NYMHY 3 x 2,5 mm2
PLIT WALL 1 PK Wall mounted type
PLIT WALL 2,5 PK Wall mounted type
PLIT WALL 3 PK Wall cassette type
PLIT WALL 4 PK Wall cassette type
PLIT WALL 3/4 PK Wall mounted type
PLIT WALL 5 PK Wall mounted type
JENIS
HA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
SATUAN
88,200.00
103,800.00
103,800.00
119,600.00
103,800.00
119,600.00
103,800.00
119,600.00
103,800.00
119,600.00
103,800.00
119,600.00
103,800.00
119,600.00
103,800.00
88,200.00
135,200.00
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
1 orang/hari
190,000.00
248,800.00
250,100.00
247,000.00
247,500.00
243,500.00
232,200.00
221,500.00
140,000.00
130,000.00
500.00
420.00
2,500.00
7,900.00
6,000.00
3,600.00
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
bh
bh
bh
bh
bh
kg
HAR GA
SATUAN
1,100.00
1,000.00
3,800.00
2,400.00
62,000.00
1,240.00
4,000.00
5,000.00
675,000.00
700,000.00
710,000.00
715,000.00
730,000.00
750,000.00
780,000.00
430,000.00
kg
kg
kg
kg
zak
kg
kg
kg
m3
m3
m3
m3
m3
m3
m3
m'
47,500.00
11,700.00
14,000.00
28,500.00
62,500.00
32,000.00
9,600.00
8,500.00
40,000.00
12,500.00
15,000.00
17,100.00
4,000.00
6,000.00
6,900.00
2,500.00
75,000.00
17,500.00
17,500.00
35,000.00
4,500.00
24,000.00
ltr
kg
kg
kg
kg
bh
bh
bh
kg
bh
bh
kg
bks
bks
ltr
bks
kg
kg
kg
kg
ltr
ltr
HAR GA
SATUAN
42,700.00
45,000.00
400.00
15,000.00
17,500.00
47,000.00
19,200.00
50,000.00
58,000.00
41,000.00
44,700.00
10,000.00
4,500.00
4,500.00
3,000.00
28,000.00
10,000.00
40,000.00
44,000.00
kg
kg
lbr
ltr
ltr
kg
kg
kg
kg
kg
kg
ltr
ltr
ltr
ltr
ltr
kg
kg
kg
1,200,000.00
2,750,000.00
2,900,000.00
2,750,000.00
2,900,000.00
1,550,000.00
3,500,000.00
3,800,000.00
5,200,000.00
5,600,000.00
7,200,000.00
7,600,000.00
17,500.00
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
btg
21,500.00
95,000.00
22,500.00
15,000.00
30,000.00
btg
m'
m'
m'
m'
HAR GA
SATUAN
10,000.00
45,000.00
m'
m2
62,100.00
84,200.00
64,000.00
97,000.00
146,000.00
146,000.00
121,000.00
98,000.00
110,000.00
90,000.00
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
60,000.00
70,000.00
30,000.00
12,000.00
35,000.00
43,000.00
lbr
lbr
lbr
m'
m'
zak
74,500.00
76,000.00
76,000.00
84,000.00
195,000.00
6,500.00
17,000.00
18,500.00
7,500.00
m2
m2
m2
m2
m2
Bh
Bh
Bh
bh
HAR GA
SATUAN
60,000.00
8,500.00
10,000.00
12,000.00
14,000.00
16,500.00
23,000.00
30,000.00
40,000.00
50,000.00
70,000.00
6,000.00
20,000.00
25,000.00
bh
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
tube
kg
kg
9,800.00
9,800.00
12,500.00
12,700.00
12,600.00
20,000.00
90,000.00
75,000.00
33,600.00
44,400.00
56,400.00
115,000.00
6,000.00
8,000.00
7,000.00
5,000.00
37,500.00
32,500.00
15,000.00
17,800.00
19,600.00
105,000.00
110,000.00
kg
kg
kg
kg
kg
bh
set
set
m2
m2
m2
m2
m'
m'
m'
m'
m2
roll
kg
kg
kg
m'
m'
HAR GA
SATUAN
150,000.00
3,000.00
8,000.00
7,500.00
16,500.00
6,500.00
85,000.00
75,000.00
85,000.00
506,000.00
m'
m'
m'
m'
m'
m'
m'
m'
m'
m2
75,000.00
85,000.00
120,000.00
180,000.00
145,000.00
105,000.00
205,000.00
850,000.00
2,500,000.00
m2
m2
m2
m2
m2
m2
m2
m2
unit
18,000.00
15,000.00
300.00
100.00
5,000.00
7,500.00
10,000.00
12,500.00
kg
kg
bh
bh
bh
bh
bh
bh
1,600,000.00
350,000.00
1,200,000.00
1,450,000.00
725,000.00
900,000.00
150,000.00
set
bh
bh
bh
bh
bh
bh
HAR GA
SATUAN
250,000.00
110,000.00
250,000.00
170,000.00
175,000.00
275,000.00
150,000.00
160,000.00
150,000.00
275,000.00
bh
set
set
set
set
set
bh
bh
bh
set
200,000.00
40,000.00
475,000.00
15,000.00
12,000.00
30,000.00
30,000.00
15,000.00
45,000.00
350,000.00
180,000.00
600,000.00
125,000.00
bh
bh
bh
bh
bh
bh
bh
set
set
set
set
set
set
24,000.00
32,000.00
40,000.00
52,000.00
65,000.00
80,000.00
950,000.00
800,000.00
420,000.00
280,000.00
1,100,000.00
320,000.00
780,000.00
m'
m'
m'
m'
m'
m'
bh
bh
bh
bh
bh
bh
bh
HAR GA
SATUAN
290,000.00
250,000.00
420,000.00
760,000.00
95,000.00
1,200,000.00
bh
bh
bh
bh
bh
bh
190,000.00
115,000.00
54,000.00
320,000.00
520,000.00
20,000.00
30,000.00
22,000.00
40,000.00
220,000.00
320,000.00
23,000.00
67,000.00
42,000.00
11,000.00
4,000.00
7,200.00
2,200.00
2,200.00
140,000.00
210,000.00
160,000.00
130,000.00
280,000.00
240,000.00
340,000.00
240,000.00
190,000.00
280,000.00
680,000.00
660,000.00
440,000.00
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
bh
bh
bh
bh
bh
bh
bh
bh
bh
HAR GA
SATUAN
420,000.00
56,000.00
56,000.00
56,000.00
65,000.00
22,000.00
200,000.00
220,000.00
85,000.00
1,400,000.00
80,000.00
900,000.00
3,200,000.00
30,000.00
2,700.00
5,200.00
620,000.00
580,000.00
310,000.00
270,000.00
240,000.00
340,000.00
26,800,000.00
8,500,000.00
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
unit
unit
bh
m'
m'
unit
bh
bh
bh
bh
bh
unit
unit
106,000.00
16,000.00
210,000.00
780,000.00
1,100,000.00
45,500,000.00
8,400.00
680,000.00
11,000.00
4,000.00
880,000.00
85,000.00
640,000.00
490,000.00
1,800,000.00
m'
m'
m'
bh
bh
bh
bh
bh
m'
m'
bh
bh
bh
bh
bh
HAR GA
SATUAN
5,000.00
65,000.00
125,000.00
700,000.00
4,050,000.00
2,948,000.00
3,344,000.00
685,500.00
10,383,600.00
1,679,300.00
5,060,000.00
8,402,200.00
950,000.00
13,900.00
3,008,200.00
9,234,900.00
13,283,300.00
16,929,700.00
2,473,400.00
16,929,700.00
m'
bh
bh
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
m'
unit
unit
unit
unit
unit
unit
SPESIFIKASI MATERIAL/BA
No.
JENIS MATERIAL
A.
BAHAN AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA
1
PASIR URUG
2
PASIR PASANG
3
PASIR BETON
4
BATU PECAH 1-2 CM
5
BATU PECAH MESIN 2/3
6
BATU PECAH MESIN 3/5
7
BATU PECAH 5-7 CM
Err:509 Err:509
8
BATU BELAH UNTUK PONDASI
Err:509 Err:509
9
BATU ANDESIT
10
BATU TEMPEL HITAM
11
BATA MERAH BAKAR KEAS I
12
BATA MERAH BAKAR KELAS II
13
BATA CONBLOCK 40x20x10 CM
Err:509 Err:509
14
BATA RINGAN RINGAN T. 10 CM
15
BATA RINGAN RINGAN T. 6 CM
16
MURTAR UTAMA MU.380 ( PASANGAN )
17
MURTAR UTAMA MU.301 (PLESTERAN )
18
MURTAR UTAMA MU.350 ( ACIAN )
20
GROUTING NAD MU 408
21
SEMEN PC (TIGA RODA - 50 KG/ZAK)
22
SEMEN WARNA (DUA GUNUNG)
23
SEMEN WARNA (MITZUBISHI)
24
BETON READY MIX K-175
25
BETON READY MIX K-225
SPESIFIKASI
Lokal
Lokal
Lokal
Lokal, Memenuhi PUBI 82 dan Pera
Lokal, Memenuhi PUBI 82 dan Pera
Lokal, Memenuhi PUBI 82 dan Pera
Lokal, Memenuhi PUBI 82 dan Pera
Lokal, Memenuhi PUBI 82 dan Pera
Lokal, Memenuhi PUBI 82 dan Pera
Lokal, Memenuhi PUBI 82 dan Pera
Lokal, Produksi Palimanan
Lokal, Produksi Palimanan
Lokal, Pres Mesin uk. 20 x 10 x 5 cm
Lokal, Manual, uk. 20 x 10 x 5 cm
Merk : Celcon
Merk : Celcon
Merk : Celcon
Merk : Mortar Utama
Merk : Mortar Utama
Merk : Mortar Utama
Merk : Mortar Utama
Merk ; tiga Roda
Merk : Dua Gunung
Merk : Dua Gunung
Produksi : Betamix
Produksi : Betamix
No.
JENIS MATERIAL
26
27
28
29
30
31
B.
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
SPESIFIKASI
Produksi
Produksi
Produksi
Produksi
Produksi
Produksi
: Betamix
: Betamix
: Betamix
: Betamix
: Betamix
: JHS/ WIKA
Merk : ICI
Merk : Sanlex
Merk : Vinilex
Merk : Pentalite
Merk : ICI
Merk : Lokal
Merk : Lokal
Merk : Lokal
Merk : Danaglos
Merk : Lokal
Merk : Lokal
Merk : Matahari
Merk : Kucing
Merk : Kucing
Merk : Penta
Merk : Kucing
Merk : Kucing
Merk : Kucing
Merk : Kucing
Merk : Danagloss
Merk : Danagloss
Merk : Kucing
No.
JENIS MATERIAL
SPESIFIKASI
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
Merk : Kucing
Merk : Kucing
Merk : Kucing
Merk : Kucing
Merk : Pamatex
Merk : Gentong
Merk : Avian
Merk : Decolux
Merk : Avian
Merk : Decolux
Merk : Gentong
Merk : Pertamina
Merk : Pertamina
Merk : Pertamina
Merk : Pertamina
Lokal
Merk : No Drop
Merk : aqua Prof
C.
73
74
75
76
77
78
79
80
81
82
83
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
: Albasiah
: Maranti
: Maranti
: Mahoni
: Mahoni
: Terentang
: Borneo Super
: Borneo Super
: Banjar
: Banjar
: Kamper Oven
No.
JENIS MATERIAL
84
85
86
87
88
89
90
91
92
D.
93
94
95
96
97
98
99
100
101
102
E.
103
104
105
106
107
108
F.
SPESIFIKASI
Lokal : Kamper Oven
Lokal : Kayu Hutan
Lokal : Kayu Hutan
Lokal : Kamper
Kayu Kamper
Kayu Kamper
Kayu Kamper
Kayu Kamper
Merk : Star wall
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Formika
No.
JENIS MATERIAL
SPESIFIKASI
109
110
111
112
113
114
115
116
117
Merk : Roman
Merk : Roman
Merk : Roman
Merk : Roman
Merk : Granito (Salsa)
Merk : Roman
Merk : Granito
Merk : Roman
Merk : Roman
G.
118
119
120
121
122
123
124
125
126
127
128
129
130
131
Merk : Lokal
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Tube
Merk : Fox
Merk : AICA
No.
JENIS MATERIAL
SPESIFIKASI
G.
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
Merk : G-Seal
Merk : G-Seal
No.
JENIS MATERIAL
SPESIFIKASI
161
162
163
164
Merk : YKK
Merk : YKK
Merk : YKK
Lokal
H.
165
166
167
168
169
170
171
172
173
BAHAN KACA
KACA POLOS 5 MM
KACA RAYBAN 5 MM
KACA POLOS 8 MM
KACA RAYBAN 8 MM
KACA POLOS 10 MM
KACA ES 5 MM
KACA ES 8 MM
KACA TEMPERED 12 MM
DAUN PINTU KACA TEMPERED 12 MM
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
No.
JENIS MATERIAL
SPESIFIKASI
I.
174
175
176
177
178
179
180
181
J.
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
BAHAN SANITAIR
CLOSET DUDUK LENGKAP ASSESORIES SEK. TOTO
CLOSET JONGKOK TOTO
WASTAFEL LENGKAP ASSESORIES SEK. TOTO
URINOIR MUSLIM LENGKAP ASSESORIES SEK. TOTO
SEKAT URINOIR LENGKAP ASSESORIES SEK. TOTO
KITCHEN ZINK
TEMPAT SABUN STAINLESS
BAK FIBREGLASS STANDAR
JET WASHER SEK. TOTO
HAND SHOWER SEK. TOTO
KRAN TEMBOK SEK. TOTO
KRAN GANDA SEK. TOTO
KRAN BEBEK SEK. TOTO
FLOOR DRAIN SEK. TOTO
CLEAN OUT 4"
ROOF DRAIN STAINLESS
KACA CERMIN (DIBOVLE) DI ATAS WASTAFEL 66X100 (T.5 MM)
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : Asahimas
K.
199
Merk : Dekson
No.
JENIS MATERIAL
SPESIFIKASI
200
201
202
203
204
205
206
207
208
209
210
211
Merk : ALFA
Merk : Dekson
Merk : Unilon
Merk : Unilon
Merk : Unilon
Merk : Unilon
Merk : ALFA
Merk : ALFA
Merk : ALFA
Merk : Dekson
Merk : Dekson
Merk : ALFA
K.
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
BAHAN PIPA
PIPA GSP MEDIUM 1/2 "
PIPA GSP MEDIUM 3/4 "
PIPA GSP MEDIUM 1 "
PIPA GSP MEDIUM 1 1/4 "
PIPA GSP MEDIUM 1 1/2"
PIPA GSP MEDIUM 2"
GATE VALVE 2"
GATE VALVE 1 1/2"
GATE VALVE 1 1/4"
GATE VALVE 1"
CHECK VALVE 2"
FLEXIBLE JOINT 2"
Y STAINER 2"
Y STAINER 1 1/4"
FLOAT VALVE 1"
FLOAT VALVE 2"
WLC, TERMASUK KABEL KONTROL
No.
JENIS MATERIAL
SPESIFIKASI
229
230
PRESSURE GAUGE
HEADER 3"
L.
231
232
233
234
235
236
237
238
239
BAHAN ELEKTRIKAL
Lampu Baret Persegi TL Bulat 20 W
Downlight PLE 14 w (E27)
Lampu Roset PLE 11 W (E27)
Armature 2 x 18 W (RM)
Armature 2 x 36 W (RM 300) ALML M2
Saklar Tunggal 10 A, 1 Phasa
Saklar Ganda 10 A, 1 Phasa
Saklar Hotel Tunggal 10 A, 1 Phasa
Saklar Hotel Ganda 10 A, 1 Phasa
Merk : Philips
Merk : Philips
Merk : Philips
Merk : Philips
Merk : Philips
Merk : Broco
Merk : Broco
Merk : Broco
Merk : Broco
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
Merk : Broco
Merk : Broco
Merk : Broco
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Merk : Clipsal
Merk : Clipsal
Merk : Tray Tek
Merk : Tray Tek
Merk : Tray Tek
Merk : Tray Tek
Merk : Clipsal
Merk : Clipsal
Merk : Clipsal
No.
JENIS MATERIAL
SPESIFIKASI
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
Merk : Clipsal
Merk : Clipsal
Merk : Clipsal
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Mitsubishi/Panasonic
Merk : Mitsubishi/Panasonic
Merk : Mitsubishi/Panasonic
Merk : Mitsubishi/Panasonic
Merk : Mitsubishi/Panasonic
Merk : Mitsubishi/Panasonic
Merk : TATA
Merk : TATA
Merk : TATA
Merk : Panasonic
Merk : Supreme
Merk : Supreme
Merk : Panasonic
Merk : Simplex
Merk : Simplex
Merk : Simplex
Merk : Simplex
Merk : Simplex
Merk : Panasonic
286
Anunciator
Merk : Panasonic
No.
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
JENIS MATERIAL
Kabel NYY 4Cx25 Sqmm
Kabel NYA 1Cx16 Sqmm
Kabel NYFGBY 4Cx50 Sqmm
TB - TP 20 pairs
MDF - TP 80 pairs
PABX 6 / 36
Kabel Stel - K 20 x 2 x 0,6 mm2
Lampu Indicator
Kabel NYM 3 x 2,5 mm
Kabel NYA 2 x 1,5 mm
MDF - Fa 40 pairs
Outlet Data
HUB / Switch 24 ports
Pantch Panel HUB / Switch 8 ports
Rack 8U
Kabel UTP Cat 6
Ceiling Speaker 3 w
Volume Kontrol
TB - TS. 10 pairs
Pre Recorder Evaluation
Compact Dist / MP3 Player
SM / FM Tuner
Emergency Microphone
Mixer Pre - Amplifier
Equalizer
Power Amplifier 1 x 240 w
Rack
MDF - SS 20 Pairs
Kabel NYMHY 3 x 2,5 mm2
SPLIT WALL 1 PK Wall mounted type
SPLIT WALL 2,5 PK Wall mounted type
SPESIFIKASI
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Supreme
Merk : Panasonic
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Supreme
Merk : TOA
Merk : TOA
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Supreme
Merk : DAIKIN
Merk : DAIKIN
No.
318
319
320
321
JENIS MATERIAL
SPLIT WALL 3 PK Wall cassette type
SPLIT WALL 4 PK Wall cassette type
SPLIT WALL 3/4 PK Wall mounted type
SPLIT WALL 5 PK Wall mounted type
SPESIFIKASI
Merk :
Merk :
Merk :
Merk :
DAIKIN
DAIKIN
DAIKIN
DAIKIN
SPESIFIKASI MATERIAL/BAHAN
SPESIFIKASI TEKNIS/MERK
SPESIFIKASI TEKNIS/MERK
Produksi
Produksi
Produksi
Produksi
Produksi
Produksi
: Betamix
: Betamix
: Betamix
: Betamix
: Betamix
: JHS/ WIKA
Merk : ICI
Merk : Sanlex
Merk : Vinilex
Merk : Pentalite
Merk : ICI
Merk : Lokal
Merk : Lokal
Merk : Lokal
Merk : Danaglos
Merk : Lokal
Merk : Lokal
Merk : Matahari
Merk : Kucing
Merk : Kucing
Merk : Penta
Merk : Kucing
Merk : Kucing
Merk : Kucing
Merk : Kucing
Merk : Danagloss
Merk : Danagloss
Merk : Kucing
SPESIFIKASI TEKNIS/MERK
Merk : Kucing
Merk : Kucing
Merk : Kucing
Merk : Kucing
Merk : Pamatex
Merk : Gentong
Merk : Avian
Merk : Decolux
Merk : Avian
Merk : Decolux
Merk : Gentong
Merk : Pertamina
Merk : Pertamina
Merk : Pertamina
Merk : Pertamina
Merk : No Drop
Merk : aqua Prof
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
: Albasiah
: Maranti
: Maranti
: Mahoni
: Mahoni
: Terentang
: Borneo Super
: Borneo Super
: Banjar
: Banjar
: Kamper Oven
SPESIFIKASI TEKNIS/MERK
Lokal : Kamper Oven
Lokal : Kayu Hutan
Lokal : Kayu Hutan
Lokal : Kamper
Kayu Kamper
Kayu Kamper
Kayu Kamper
Kayu Kamper
Merk : Star wall
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Knauf
Merk : Formika
SPESIFIKASI TEKNIS/MERK
Merk : Roman
Merk : Roman
Merk : Roman
Merk : Roman
Merk : Granito (Salsa)
Merk : Roman
Merk : Granito
Merk : Roman
Merk : Roman
Merk : Lokal
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Wavin
Merk : Tube
Merk : Fox
Merk : AICA
SPESIFIKASI TEKNIS/MERK
SPESIFIKASI TEKNIS/MERK
Merk : YKK
Merk : YKK
Merk : YKK
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
Merk : Asahimas
SPESIFIKASI TEKNIS/MERK
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : TOTO
Merk : Asahimas
Merk : Dekson
SPESIFIKASI TEKNIS/MERK
Merk : ALFA
Merk : Dekson
Merk : Unilon
Merk : Unilon
Merk : Unilon
Merk : Unilon
Merk : ALFA
Merk : ALFA
Merk : ALFA
Merk : Dekson
Merk : Dekson
Merk : ALFA
SPESIFIKASI TEKNIS/MERK
Produksi : Bakrie Pipe Industri
Produksi : Bakrie Pipe Industri
Merk : Philips
Merk : Philips
Merk : Philips
Merk : Philips
Merk : Philips
Merk : Broco
Merk : Broco
Merk : Broco
Merk : Broco
Merk : Broco
Merk : Broco
Merk : Broco
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Merk : Clipsal
Merk : Clipsal
Merk : Tray Tek
Merk : Tray Tek
Merk : Tray Tek
Merk : Tray Tek
Merk : Clipsal
Merk : Clipsal
Merk : Clipsal
SPESIFIKASI TEKNIS/MERK
Merk : Clipsal
Merk : Clipsal
Merk : Clipsal
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Merlin Gerin (MG)
Merk : Mitsubishi/Panasonic
Merk : Mitsubishi/Panasonic
Merk : Mitsubishi/Panasonic
Merk : Mitsubishi/Panasonic
Merk : Mitsubishi/Panasonic
Merk : Mitsubishi/Panasonic
Merk : TATA
Merk : TATA
Merk : TATA
Merk : Panasonic
Merk : Supreme
Merk : Supreme
Merk : Panasonic
Merk : Simplex
Merk : Simplex
Merk : Simplex
Merk : Simplex
Merk : Simplex
Merk : Panasonic
Merk : Panasonic
SPESIFIKASI TEKNIS/MERK
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Supreme
Merk : Panasonic
Pruduksi : Supreme/Kabel Metal
Pruduksi : Supreme/Kabel Metal
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Supreme
Merk : TOA
Merk : TOA
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Panasonic
Merk : Supreme
Merk : DAIKIN
Merk : DAIKIN
SPESIFIKASI TEKNIS/MERK
Merk :
Merk :
Merk :
Merk :
DAIKIN
DAIKIN
DAIKIN
DAIKIN
HAN
SATUAN
SATUAN
Kualitas Baik
Kualitas Baik
Kualitas Baik
Sesuai Standar SNI
SATUAN
Kualiatas Baik
Kualitas baik, Sesuai standar SNI
Kualitas baik, Sesuai standar SNI
SATUAN
Kualiatas Baik, Lurus, Potongan Somel, Untuk Pintu
SATUAN
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
Kualitas Baik, Standar SNI
SATUAN
SATUAN
Kualitas Baik, Sesuai standar SNI
Kualitas Baik, Sesuai standar SNI
Kualitas Baik, Sesuai standar SNI
SATUAN
Kualiatas Baik
SATUAN
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik
Kualiatas Baik
SATUAN
Sesuai Standar SNI
Sesuai Standar SNI
SATUAN
Sesuai Standar SNI
Sesuai Standar SNI
Sesuai Standar SNI
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
SATUAN
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
SATUAN
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
Kualiatas Baik, Baru
#REF!
#REF!