Construction Information Checklist
Information to be made available prior to Design Works:
1. Tower Crane

Location :
Footing Loads:
Tie-back Levels:
Penetration Sizes:
Lift Charts:

2. Mobile Cranes

Size:
Operating Weight:
Crane Path:
Outrigger Loads:
Back-propping Required:

3. Alimak

Location :
Loads:
Penetration Sizes:
Tie-back Levels:

4. Abnormal Loadings

Sub-Stations:
Plant Rooms:
Areas Servicing these rooms:

5. Loading Areas

Semi-trailer Loads:
Stacked Material Loads:

6. Precast Erection

Propping Penetrations:
Support Frames:
Spinning:

7. Back-propping

Propping Arrangement:
Number of Levels of Back-propping:

8. Concrete Boom

Location :
Loads:
Penetration Sizes:

Unit 7/ 25 Howleys Road, Notting Hill Vic 3168, Australia


T: 03 9543 6377 F: 03 9543 7279 Email: info@intraforcetech.com.au
ABN: 20 150 091 160 ACN: 150 091 160

2 August 17, 2015

Back-propping:
9. Loading Bays

Location :
Loads:
Back-propping:

10. Safety Screen

Location :
Loads:
Back-propping:

11. Deck Protection

Location :
Loads:
Back-propping:

12. Construction material Loads

Location :
Loads:
Back-propping:

13. Forklift

Location:
Size:
Operating Weight:
Path:
Back-propping Required:

14. Personnel Scissor/Boom Lift

Location:
Size:
Operating Weight:
Path:
Back-propping Required:

15. Crawler (Steel Roof)

Location:
Size:
Operating Weight:
Path:
Outrigger Loads:
Back-propping Required: