Professional Documents
Culture Documents
Structural Consultant Fee Structure by ISSE
Structural Consultant Fee Structure by ISSE
D) Peer review
E) Proof checking
All the design data, assumptions, analysis, design and
drawings will be scrutinized in detail by the proof
consultant. If required main consultant can be called for
discussions and clarifications. Proof consultant may
suggest some improvements in the design / drawings.
Proof consultant will certify the design and drawing of
the main consultant after the necessary revisions in
design and drawings
1)
Appointment
15%
2)
25%
3)
Foundation
15%
4)
Super structure
40%
5)
Completion
5%
site.
ISSE JOURNAL
20
ISSE JOURNAL
21
4)
I)
II)
III)
IV)
V)
Industrial Structures
2)
3)
I)
Residential Buildings
1)
15.0
12.0
10.0
9.0
8.0
7.0
6.0
Up to 5000
25,000
50,000
1 Lac
2 Lac
5 Lac
Above 5 Lac
Extra for high
rise building & its
submission to high
rise committee
10
8
1L
Above 1L
As on 2011
Rs./hour
3000
1500
1000
750
500
5
4
12
Up to
50,000
Rs. 35,000/-
(PEB / Shed)
Rs./Sq.ft.
6
Normal
Rs./Sq.ft.
Percentage
of Total
Structural Cost
3%
2%
2%
2%
-
B. UP area
Sq.ft.
4.0
Rate
Rs./ sq.ft.
Minimum
Rs. 50,000/-
2% of
structural lost
Rs.50,000/-
Remark
Scope A
Scope A
Remark
Scope A
Rs. 25,000/-
Minimum
Remark
Minimum
ISSE JOURNAL
22
II)
coordination
For total
project
Rs. 4,000
Rs. 7,000
Out
Station
up to 150 KM
Rs. 750
per flat 2BHK
client.
site staff to
be paid by
Supervision
Rs. 6,000
Rs. 10,000
Distance
beyond 150 Km
Long
3% of
overall cost
7)
I)
Rs. 2,000
Within
MCGM
limit
6)
Rs. 3,500
II)
Principal Consultant
Structural Audit
Based on area
5)
I)
Minimum
Rs1,00,00/-
Minimum
Rs. 1,00,000/-
Minimum
Rs10,000/-
Scope B
Remark
Remark
Scope C
Visit fees
per person
per day
Remark
Scope B
ISSE JOURNAL
23
14)
13)
15% of
original fees
50% of
original
fees
Major
changes
In the layout
25% of
original fees
for every repetition
50% of fees
for each
repetition
or
Minor
changes
five
repetitions
Beyond
five
repetitions
Up to first
Proof Checking
(Residential & Commercial Building)
50% of main
consultant's fees
20% of main
consultant's fee
12)
or
Peer Review
(Residential & Commercial Building)
11)
Rs. 2/ per sq. ft.
Minimum
Rs. 1,00,000/-
Percentage
of Total
Structural Cost
2% of cost
Bridge Design:
10)
Minimum
Rs. 50,000/-
Minimum
Rs25,000/-
Minimum
Rs. 1,00,000/-
Percentage
of Total
Structural Cost
3% of cost
Marine Structures
9)
Remark
The structure
to be repeated
must be
exactly identical
except foundation
Remark
Scope E
Remark
Scope D
Remark
Scope A
Remark
Scope A