Load Box (Yeraly Mech)

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 4

Load Box Test (Mech.

Loco no.
Supervisor
Notch

Rack

Sch.

Date
Mechanic

LOP

FOP

BAP

1st
2nd
3rd
4th
5th
6th
7th
8th
NLV

HP

Volts

LCR

Amps

RPM

M/Brg.Temp.

Stb.
time
CC
Vacc.
TSC
Model

TRD

LOP at 80 C

OST

LOP at 92 C

>2.2 to 5.3 Kg/Cm


>2.0 to 5.0 Kg/Cm

H/E time

W/P

Cool time

H/E
Load

Signature of the supervisor


PTO

KENI Indicators
Left
Idle

Right
8th Notch

Idle

8th Notch

Cyl No.

Comp

Firing

Comp

Firing

Comp

Firing

Comp

Firing

1
2
3
4
5
6
7
8

Temperatures in C :
TSC Exh.
gas
Lt. Rad.
Water

In :
Out :

SAFC Air
inlet

In :
Out :

In :

Rt. Rad.
Water

In :

Out :

Location
Left
Con. rod
Brg.
Right
Temp.
Left
Cyl.head
Right
Temp.

LOC L/Oil
Fuel
Consumption
SFC

Out :

In :
Out :

Yearly Mech.

Load Box Register


From :__________ to: __________

You might also like