2 Pipe, Sched.80 (thickness:5.

54mm) with more than 3mm deep


grinding damage (above 10m elevation) was being ground to
remove the grinding damage. The test Package number is B90-R-528.
If not noticed, this pipe portion was made so thin, that will give danger
during testing and operation. This violates SAES-W-011 para.18.6 which
stated Damage or deformation to the base metal or welds including
dimensional changes, caused by external forces (intentional or
accidental) requires special repair and inspection procedures to be
submitted to Saudi Aramco Inspection and if necessary forwarded to CSD
for review and approval prior to undertaking the repairs. Also Sched.Q
para.7.5.7.

Saudi Aramco: Company General Use