LIST OF COMPLETED PROJECTS UNDER GOV. ROBERTO Y.

UYs ADMINISTRATION
January 1 to August 31, 2015
NAME OF PROJECT

Length

Location

Appropriati
on

Source of
Funds

Mode of
implementat
ion

Date Started

Date
Completed

%
Accomp.

Remarks

RIZAL
1
2
3
4
5
6
7
8
9
1
0

Contruction of Covered Court at Barangay Sipaon,


Rizal
Construction of Covered Court at Brgy. South
Mapang, Rizal
Electrification Project (Service Drop wire) at
Rizalina, Rizal
Electrification Project (Service Drop wire) at
Sebaca, Rizal
Const of 2.4mx 1.5m x 5.77m Skew Type Single
Barrel Box Culvert along Sitio Batangan South
Mapang Brgy Road
Electrification Project(Single Phase-Lateral Line) at
Purok 1, Brgy North, North Mapang, Rizal, ZN
Electrification Project(Single Phase-Lateral Line) at
Purok 2, Brgy North, North Mapang, Rizal, ZN
Electrification Project(Single Phase-Lateral Line) at
Purok 3, Brgy North, North Mapang, Rizal, ZN
Concreting of Mabunao - Nangka Provincial Road,
Rizal
Construction of one (1) unit 2 Classroom Schl.
Building at La Esperanza, Rizal

14x30

m.

Sipaon

1,560,000.00

56.00.12.10.2/
9943-215

Takay Labor

15-Jul-14

9-Feb-15

100.00%

Completed

18x30

m.

South
Mapang

1,980,000.00

9943-215

Takay Labor

22-Jul-14

12-Feb-15

100.00%

Completed

Rizalina

95,230.00

Admin.

24-Jul-14

30-Jan-15

100.00%

Completed

Sebaca

50,183.00

Admin.

1-Aug-14

22-Dec-14

100.00%

Completed

Lm
.

South
Mapang

560,000.00

Takay Labor &


Lumber

9-Feb-15

6-Apr-15

100.00%

Completed

km
.
km
.
km
.
km
.

North
Mapang
North
Mapang
North
Mapang

293,506.00

Admin.

3-Aug-15

28-Aug-15

100.00%

Completed

425,449.00

Admin.

3-Aug-15

28-Aug-15

100.00%

Completed

462,491.50

Admin.

3-Aug-15

28-Aug-15

100.00%

Completed

5.77
0.296
0.727
1.011
3.00
7x18

m.

1 Proposed Construction of Two (2) Storey Barangay


1 Hall at Mitimos, Rizal, Z.N.
1 Prop Const of Multi-Purpose Covered Court @ Brgy
2 Nilabo, Rizal

20x30

m.

8918(2B) 251

Mabunao

12,000,000.0
0

8918(2B)251

Admin.

13-Feb-14

72.12%

On-going

La
Esperanza

850,000.00

8918(1)871

Takay Labor

23-Jun-14

81.21%

On-going

Mitimos

1,580,000.00

9999(1)874

Takay Labor,
Lumber &
Aggregates

24-Nov-14

64.23%

On-going

2,100,000.00

8918-874
Reprog: PDC
ExCom Res#5

Takay Labor,
Lumber &
Aggregates

18-Mar-15

29.32%

On-going

Nilabo

1 Const of One(1) Unit Two(2) Classrooms School


3 Building at Nangkaan Elem School, Nangkaan

Nangkaan

1 Construction of Water Supply System at San


4 Roque, Rizal

850,000.00

56.00.07.01,
3999 221
969(6)

Takay Labor &


Lumber

23-Mar-15

21.28%

Suspended

San Roque

1,450,000.00

8918(4)874

Admin.

Partial
Delivery/Sus
pended

Concreting of 223.0 meters Prov'l Road and the


1
Rehab. of Drainage Canal, Brgy. West Poblacion,
5
Rizal, Z.N.

0.22

km
.

West
Poblacion

1,600,000.00

8918(2B) 251

Admin.

NYS/Mat'ls
on process

1 Concreting of Brgy. Road of 70m along Juan Luna


6 St. Extension, Pob. East, Rizal, Z.N.

0.070

km
.

Pob. East

308,900.00

9999(1)874

Takay Labor,
Lumber &
Aggregates

NYS/Mat'ls
on process

30,060.00

416-(DOFMDFO)-01(A)PBGS-(G)

Admin.

NYS/Mat'ls on
process/
For
Implementatio
n

Takay Labor,
Lumber &
Aggregates

NYS/Mat'ls
on process

Takay Labor,
Lumber &
Aggregates

NYS/Mat'ls
on process

Admin.

NYS/Mat'ls
on process

Takay Labor &


Lumber

NYS/Mat'ls
on process

Takay Labor &


Aggregates

NYS/Mat'ls
on process

Takay Labor,
Lumber &
Aggregates

NYS/Mat'ls
on process

1
Extension of Pipeline @ Sipaon, Rizal, ZN
7

Sipaon

18x30

m.

Mitimos

2,150,000.00

8918-874
Reprog: PDC
ExCom Res#5

1.0

km

South
Mapang

4,413,000.00

20% DF-2015
AIP ref#
8000-1-5

15 x 20

South
Mapang

1,620,000.00

5x8

Rizal

500,000.00

2 Construction of Concrete Slab of Existing Covered


2 Court 15m x 30m @ Brgy Sipaon, Rizal, ZN

15 x 30

Sipaon

295,000.00

2 Concreting of Barangay Road of 1,000mtrs @ Brgy


3 Rizalina

1.000

km

Rizalina

2,595,000.00

1 Const of Multi-Purpose Covered Court @ Brgy


8 Mitimos
CY-2015
1 Concreting of Brgy. Road of 1,000m @Sitio
9 Batangan, South Mapang
2 Construction of Covered Court @ South Mapang
0 Elem School, South Mapang, Rizal, ZN
2
Construction of Tribal Hall @ Mun. of Rizal, ZN
1

PDRMMC FY2015 AIP


REF#9000-61/GF (01)
8918(8)cont.
Reprog:
SP Res # 109, s.
2015
9999(1) SB#1Appro
Ord.#15-01,
s.2015
8918(8)cont.
Reprog:
SP Res # 109, s.
2015

2
Repair of OPA Sub-Office (8m x 9m), Rizal, ZN
4

8x9

2 Const of 1-Unit Multi-Purpose Covered Court w/o


5 Stage @ Brgy South Mapang
2 Const of 1-Unit Stage with Two Comfort Rooms
6 outside the Covered Court, South Mapang

12.95 x
5.55

Rizal

95,000.00

South
Mapang

800,000.00

South
Mapang

604,000.00

56.00.01.01/19
99-200 -811
AIP Ref# 10001-1

Admin.

Takay Lumber &


Aggregates

FY 2015 9943215 AIP


Ref#9000-6-1

Admin.

NYS/Mat'ls
on process
Newly
Approved
POW
Newly
Approved
POW