ER clips on PSC sleepers require greasing to prevent corrosion. The circular provides instructions on greasing ER clips during through fastening renewal, distressing operations, and annually in corrosion-prone areas or every two years in other areas. Progress on greasing ER clips should be reported monthly to the Chief Engineer in the PCDO/MCDO.
ER clips on PSC sleepers require greasing to prevent corrosion. The circular provides instructions on greasing ER clips during through fastening renewal, distressing operations, and annually in corrosion-prone areas or every two years in other areas. Progress on greasing ER clips should be reported monthly to the Chief Engineer in the PCDO/MCDO.
ER clips on PSC sleepers require greasing to prevent corrosion. The circular provides instructions on greasing ER clips during through fastening renewal, distressing operations, and annually in corrosion-prone areas or every two years in other areas. Progress on greasing ER clips should be reported monthly to the Chief Engineer in the PCDO/MCDO.
************* In amplification of Para 1411(5)(b) of IRPWM 1986, following additional instructions are issued in regard to greasing of ER clips. In service Greasing of ER clips shall be carried out 1) During through fastening renewal 2) During distressing operations and 3) At a frequency of once in a year in corrosion prone areas and once in two years in other areas. Progress of greasing of ERC may be given in the monthly PCDO/MCDO to Chief Engineer. Sd /(P.RAJAMONI) Chief Track Engineer. For CHIEF ENGINEER SOUTHERN RAILWAY No.W.506/14/Circulars Headquarters Office, Works Branch, Chennai-3. Dated: 23.01.2002.