RATES

ITEM NO

DESCRIPTION

EXCAVATION & EARTH WORK

CONCRETE WORK

UNIT

3,000.00

Lean concrete
Reinforced cement concrete 1:3:6[3/4"]
mixed concrete in the follows ;(3" thick)

Sqrs

12,500.00

Reinforced concrete
Reinforced cement concrete 1:2:4 [3/4"]
mixed concrete in the follows ;

Cube

44,500.00

Form work
Form work is measured as the net
contacts surface measurement between
concrete and form work. Form work
for columns and beams is given as
girth measurement

Sqrs

9,500.00

Reinforcement
Tor steel rod reinforcement including
bends, hooks, wire, distance blocks
and ordinery spaces

Cwt

13,000.00

Cube

22,000.00

RUBBLE WORK

ELECTRICAL INSTALLATION
Electrical installation
(condutes pipe,wire and labour for laying
only)

H
H.1
H.2

RATE

Cube

Random rubble masonry in cement and


sand 1:5 in wall foundation
D

QTY

Sum

BRICK WORK
9" thick brick wall in 1:5 cement and sand
mortar
6" thick brick wall in 1:5 cement and sand
mortar

Sqrs

24,000.00
20,000.00

CARPENTRY AND JOINERY


Timber doors;
Glazed windows;

Sq.ft.
Sq.ft

1,500.00
1,800.00

AMOUNT

RATES
I

PLUMBING

FINISHES

J.1
J.2
J.3

Smooth plastering in 1:1:5 cement lime


and sand mortar [internal]
Semi - rough plastering in 1:1:5 cement
lime and sand mortar [external]
Sofit plaster

J.4

Floor finishes-Tilling [without tiles, tile


grout and beadings] [a] Tilling area

J.5

Wall and door window painting /Polishing

Sum

Sqrs

7,500.00

Sqrs
Sqrs

7,000.00
7,700.00

Sqrs

GROUND FLOOR ROOF COVERING AND


ROOF PLUMBING
Roof covering with Asbastos sheet
roofing on necessary open rafter timber
frame work with all necessary GI hooks,
bolts, nuts, limpet and bitumestic washers
etc. rate shall include roof frame work,
timber ceiling sheet & necessary foil
insulation and necessary Roof Pollishing
and roof plumbing all necessary to
complete the work as per drawings and
specification.
In main roof
Sqrs

*Note:
Rates not included
1 Tiles(Provide by client)
2 Light fittings (Provide by client)
3 Toilet bathroom fittings (Provide by client)

105000.00