Exploration OF Hydrocarbons
Exploration OF Hydrocarbons
OF
HYDROCARBONS
Module No 3
DRILLING OPERATIONS
WELL PROFILE
FIGURE 3.2:
SHOWS A
TYPICAL
DRILLING/
CASING
PROGRAM
PHASE- B
PHASE- C
H X d/10
(METRIC)
0.052 X H X d
(API)
CONNECTING
KELLY WITH
JOINT
PICKING
UP JOINT
STABBING THE
ADDED JOINT
INTO TOP OF
DRILL PIPE
JOINT
ADDED
AND
READY
TO MAKE
HOLE
POOH
KELLY IN
THE RAT
HOLE
SURFACE CASING
1. PREVENT COLLAPSE OF THE
BOREHOLE
2. PROTECT GROUNDWATER
SUPPLIES
3. CONDUCT PRODUCED FLUIDS TO
SURFACE
4. SUPPORT SURFACE PRESSURE CONTROL
EQUIPMENT
CASING ACCESSORIES
CENTRALIZERS
HAVE A BOWEDSPRING
ARRANGEMENT,
TO KEEP THE
CASING
CENTERED IN
THE HOLE
FLOAT COLLAR
IS DESIGNED TO
SERVE AS A
RECEPTACLE
FOR CEMENT
PLUGS, AND TO
KEEP THE
DRILLING MUD
IN THE HOLE
FROM
ENTERING THE
CASING
SCRATCHERS
STRIP OFF THE
WALL CAKE
FORMED BY
DRILLING MUD
FOR BETTER
CEMENT
BONDING
THE GUIDE
SHOE HELPS
GUIDE THE
CASING PAST
SMALL
LEDGES OR
DEBRIS IN
THE HOLE
CEMENTING OF
SURFACE CASING
DISPLACEMENT
FLUID
TOP PLUG
CEMENT SLURRY
BOTTOM PLUG
FLOAT COLLAR
CENTRALIZER
GUIDE SHOE
TRIPPING IN
1. RUN IN HOLE WITH NEW BHA ON DRILL PIPES,
WITH ALWAYS SMALL OUTER DIAMETER (OD)
THAN CASING ID.
2. WHILE TRIPPING IN DRILLER CAREFULLY
OBSERVES THE METAL DISPLACEMENT OF
DRILLING MUD.
3. DRILLER FILL THE DRILL STRING AFTER FEW
STANDS TO KEEP THE HOLE IN BALANCE
CONDITIONS .
WILL
FINALLY
END
ON
MUD LOGGING
FIGURE3.5.1.1:
SHOWS
DIFFERENT
PARAMETERS
MONITERED
BY MUD
LOGGING
UNIT
ELECTRIC LOGGING
(WIRELINE LOGGING)
THE IMPORTANCE OF
CORING
1. PROVIDES RELATIVELY UNDAMAGED SAMPLE
OF SUBSURFACE ROCKS.
2. PROVIDES RELATIVELY TRUE PICTURE OF
FORMATION POROSITY & PERMEABLITY.
3. PROVIDES RELATIVELY TRUE FEATURES OF
FORMATIONS.
CONVENTIONAL CORING
CIRCULATING
THROUGH INNER
BARREL BEFORE
CORING
CONVENTIONAL CORING
CIRCULATING
THROUGH OUTER
BARREL DURING
CORING
SIDEWALL CORING
WHY WE NEED SIDE WALL
CORING?
BULLETS BEFORE
FIRING
BULLETS
WITH
SAMPLE
AFTER FIRING
A-SET PACKER
ABOVE
TEST ZONE, TO
E- CIRCULATE TO
SEAL OFF HOLE
CSHUT
IN
WELL
AT
B- OPEN TEST
D-RELESE PACKER
RECOVERED
ANNULUS
TEST VALVE AND
VALVE ANDMONITOR
FLOW PRESSURE
AND EQUALIZE
FLUIDS OUT OF
FOR FIXEDBUILD UP HYDROSTATIC
HOLE
PERIOD
PRESSURE
WELL COMPLETION
1. SETTING PRODUCTION CASING
2. PERFORATION.
2. INSTALLING A PRODUCTION WELL HEAD
GUN IN
HOLE TO A
DEPTH OPPOSITE
THE PRODUCING
ZONE
PERFORATING
THE SHAPED
CHARGES ARE
FIRED
PERFORATING GUNS
ARE AVAILABLE IN
SEVERAL SIZES
ALLOW RESERVIOR
FLUIDS TO FLOW
IN WELL
CHRISTMAS TREE
SPECIAL DRILLING
OPERATIONS
1.
2.
DIRECTIONAL DRILLING
HORIZONTAL DRILLING
3.
4.
FISHING
STUCK PIPE
DIRECTIONAL DRILLING
DIRECTIONAL
ENGINEERING
S Well
Slant
Well
Kick-off
Point
End of Buildup
Tangent
Section
Horizontal
Displacement
Total
Vertical
Depth
(TVD) Kick-off
Point
(KOP)
Target
Zone
End of Buildup
Target Zone
Tangent
Section
Drop off
Zone
Horizontal
DIRECTIONAL
DRILLING
TOOLS
A WHIPSTOCK
GIVING
DIRECTION TO
BIT
MUD MOTOR
DEFLECTED
WITH BENT SUB
MUD
MOTORS
THE DRILLING
FLUIDS THROUGH
THE TURBINE
BLADES SPINS THE
ROTORS, SHAFT
AND BIT
DEVIATION SURVEY
TOOLS
SINGLE SHOT
MAGNETIC
TOOL
HORIZONTAL DRILLING
IN A DOGLEG, DRILL
STRING TENSIONS
FORCES THE PIPE TO
RUB AGAINST ONE SIDE
OF THE HOLE.
EVENTUALLY, THE PIPE
MAY WEAR A SLOT (THE
KEY SEAT) INTO THE
WALL OF THE HOLE.
DIFFERENTIAL STICKING
FISHING TOOLS
AN
OVERSHOT
GRIPS THE
OUTSIDE OF A
FISH FOR
REMOVAL
FROM THE
HOLE
A SPEAR
GRIPS THE INSIDE
OF THE FISH
MILLS