Professional Documents
Culture Documents
Sindangan 2
Sindangan 2
UYs ADMINISTRATION
January 1 to August 31, 2015
NAME OF PROJECT
Length
Location
Appropriation
Source of Funds
Mode of
implementation
Date
Starte
d
Date
Complet
ed
8918 cont.
Takay
Aggreggates
3Feb14
28100.00%
Jan-15
Completed
8999(2)815
Admin.
4Apr14
30100.00%
Jan-15
Completed
9999(1)874
Takay
Aggreggates
1213Dec100.00%
Feb-15
14
Completed
Admin.
21Jan15
100.00%
Completed
Admin.
14Jul14
17100.00%
Apr-15
Completed
Admin.
29Nov13
6-Feb100.00%
15
Completed
% Accomp.
Remarks
SINDANGAN
1
Concreting of Barangay
Road National Highway to
Upper Laputay, Siare,
Sindangan
Construction of Water
Supply System at Sindangan
District Hospital
Proposed Concreting of
Barangay Road (100 mtrs) at
Brgy. Mawal, Sindangan,
Z.N.
Construction of Rain Catcher
@ Sindangan District
Hospital
Construction of Water
Supply System(DRILLING
WORKS) at Barangay Maras,
Sindangan, Z.N.
Electrification Project at Sitio
Balik-balik to Sitio Gupo,
Joaquin Macias, Sindangan,
Z.N.
1.03
km.
Siare
Sindangan
0.10
km.
Mawal
Sindangan
Maras
J. Macias
4,800,000.00
345,000.00
325,000.00
210,000.00
8918(1)815
3,550,000.00
8918(4)874
8999(6)874
241,418.75
8918(3)874
22Mar15
Concreting of Barangay
Road @ Disud
Concreting of Barangay
Road of 2,700 mtrs Critical
11
Section along Brgy Datagan,
Mun of Sindangan, ZN
Concreting of Barangay
12
Road @ Misok
219,717.00
Misok
360,000.00
8918(1)815
0.5
km
Goleo
1.00
km
Disud
2.70
1.8
km
km
Proposed Construction of
Isolation Room @ Sindangan
13
District Hospital, Mun of
Sindangan, ZN
Concreting of Barangay
14
Road @ Caluan
Misok
GF(01), FY 2015
9999(1) 215
AIP Ref# 80001-3
Datagan
Misok
Sindangan
km
Caluan
Admin.
Takay
Labor
22Jan15
14Jul14
16Mar15
100.00%
Completed
91.40%
Suspended
19.21%
Suspended
50.96%
Suspended/Concreting
FY 2015;GF(01)
9999(1) 874 AIP
Ref# 8000-1-3
Takay Labor,
Lumber
12May15
0.25%
Suspended/Base
Preparation
Takay
Lumber &
Aggreggates
9Jan15
13.51%
Suspended
Admin.
9Mar15
57.96%
Suspended
Takay Labor,
Lumber &
Aggregates
21Apr15
1.10%
Suspended/Base
Preparation
6,684,000.00
255,000.00
4919(9)213
20% 2014Health P/P/As
Concreting of Barangay
Road of 1000 mtrs along
15
Datu Tangkilan, Sindangan,
ZN
Concreting of Brgy Road of
1,000 mtrs Critical Section
16
along Brgy Lagag,
Municipality of Sindangan
Concreting of Farm to
17
Market Road @ Lapero
1.0
0.5
km
km
km
Rehabilitation/Improvement
18 of Bunk House at OPA,
Misok
Concreting of Barangay
19 Road along Calubian ProperDumalogdog
Concreting of Barangay
Road @Valles & Reluya
20
Compound, Barangay
Motibot
Conc of Brgy Road of
800mtrs from Junction of
Nat'l Highway Road of Brgy
21 Talinga going to (Motor)
Habal2x Park Site near
Dadan Family @ Brgy
Talinga
3,112,000.00
GF(01) FY 2015
9999(1) 874 AIP
Ref#8000-1-3
Takay Labor,
Lumber &
Aggregates
14Apr15
1.50%
Suspended
Lagag
3,945,000.00
8918(8)cont.
Reprog: SP Res
#109, s. 2015
Takay
Lumber &
Aggreggates
21Apr15
0.80%
Suspended
Lapero
Takay Labor,
Lumber &
Aggregates
16Mar15
8.94%
Suspended
30.00%
Suspended: PR of
Materials Process
Datu
Tangkilan
Misok
0.63
0.8
350,000.00
Admin.
km
Talinga
2,419,000.00
Takay
Lumber &
Aggregates
27Apr15
0.42%
Suspended/Base
Preparation
Takay
Lumber &
Aggregates
7May15
0.10%
Suspended/Base
Preparation
Takay
Lumber &
Aggregates
28Apr15
3.28%
Suspended/Base
Preparation
7x
36
Bato
56.00.07.01Takay labor
1,550,000.00
221399(969)(6)
NYS/Road Repair
On-Going
CY-2015
Completion of Two(2)23 Storey Barangay Hall at
Dumalogdog, Sindangan, ZN
Dumalogdog 1,225,000.00
Nato
2,126,988.00
Nato
1,371,487.00
26
27
28
29
Construction of Water
Supply System @ Brgy
Caluan
Const of One(1) Unit
3mx3mx5m Double Barrel &
One(1) Unit 3mx3mx5m
Single Barrel Reinf. Conc.
Box Culvert @ Brgy Mawal
Prop Const of One(1) Unit
(7mx27m) Three(3)
Classrooms School Bldg @
Lapero Nat'l High School,
Lapero
Concreting of Barangay
Road of 310 meters Critical
2.861 km
7x
27
0.31
GF(01), FY 2015
8999(4) 874
AIP Ref#8000-14
FY 2015, 20%
DF
AIP Ref#80001-97
FY 2015, 20%
DF
AIP Ref#80001-97
Takay labor
PR on Process
Admin.
Admin.
Takay
Caluan
1,580,000.00
FY 2015, 20%DF
8918(4) 874
AIP Ref#8000-17
Mawal
1,930,000.00
Takay
Lumber
1,275,000.00
9999(1) SB#1Appro
Ord.#15-01,
S=s.2015
Takay
Lumber &
Aggregates
1,072,000.00
20%DF-2015
8918(2B) 874
Takay
Lumber &
Aggregates
NYS/Mat'ls on process
Lapero NHS
Upper
Inuman
AIP Ref#8000-15
12 x
20
85.00
Benigno
Aquino
Poblacion
800,000.00
Takay labor,
Lumber &
Aggregates
1,160,000.00
GF(01), FY
2015
4919(4)213
Takay
Lumber &
Aggregates
NYS/Mat'ls on process