Sharktank Product Info Rubric

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

SIMPSON STEM - SHARK TANK

INFORMATION RUBRIC

PRODUCT

DIRECTIONS: Your groups product information will be graded based on the following
rubric. Read it carefully and use it as a guide as your group creates the list of information
on your product.
Category
Prototype
Parts

Not Present 0
Points
You did not
include a list of
parts and
technology for
your prototype.

Production
Parts

You did not


include a list of
parts and
technology for
your saleable
product.

Source
Formatting

You did not


include any
source
information.

Product
Prices

You did not


compute prices
for either your

Forming 12
points
You included
one of the
following for
your prototype:
a list of parts, a
list of required
technology,
prices/availabilit
y for parts and
technology.
You included
one of the
following for
your saleable
product: a list of
parts, a list of
required
technology,
prices/availabilit
y for parts and
technology.
You included
source
information for
one source, but
you did not
include
complete URLs
OR you used
more than one
of Google,
Bing, or
Wikipedia as
your sources
without specific
URLs.
You computed a
price for either
your prototype

Emerging 18
Points
You included
two of the
following for
your prototype:
a list of parts, a
list of required
technology,
prices/availabilit
y for parts and
technology.
You included
two of the
following for
your saleable
product: a list of
parts, a list of
required
technology,
prices/availabilit
y for parts and
technology.
You included
source
information for
two to three
sources, but
you did not
include
complete URLs
OR you used
Google,
Bing, or
Wikipedia as
one source
without a
specific URL.
You computed
prices for your
prototype and

Proficient 25
Points
You included a
list of parts, a
list of required
technology, and
prices/availabilit
y for parts and
technology for
your prototype.

You included a
list of parts, a
list of required
technology, and
prices/availabilit
y for parts and
technology for
your saleable
product.

You included
accurate source
information with
specific URLs
for four or more
total sources.

You computed
prices for your
prototype and

prototype or
your saleable
product.

or your saleable
product.

your saleable
product, but the
prices were the
same but
shouldnt have
been OR the
prices were
unreasonable.

your saleable
product, the
prices were
different, and
your prices
were
reasonable.

You might also like