GENERAL:
The waterproofing work shall be carried out by Contractors who have
experience in doing waterproofing work and shall give a guarantee on a
stamped paper for good performance of the waterproof treatment for a
minimum of ten years period and shall, at their own cost, rectify the
defects, if any, found during the guarantee period.
Surface preparation:
Concrete and masonry surface:
Any cracks in the surface (other than hair cracks) shall be cut to V-shape,
cleaned and filled with cement mortar 1:2 or with bitumen conforming to
IS:702 as directed by the Engineer.
All fungus growth, if any, moss, dust shall be removed by wire brushing.
Masonry drain mouth shall be widened to two and a half times the
diameter of the drain and rounded with cement mortar.
When a pipe passes through RCC slab a cement concrete fillet shall be
built around the pipe and waterproofing taken over the fillet.