Event Analysis Report: 4 X 210 MW Cstps Chandrapur
Event Analysis Report: 4 X 210 MW Cstps Chandrapur
Event Analysis Report: 4 X 210 MW Cstps Chandrapur
EVENT
ANALYSIS
1. Event No. 4
REPORT
UNIT NO. 3
Date 27.06.08
Oil Support
210 MW
A,B,C,D,E
Nil
3. Nature of Event :
TA set tripped on Turbine trip mechanically indication with abnormal sound at front
pedestal.
4. Observations :
TLR operated
Boiler tripped
Master trip relay 86 GT operated
Low forward power relay operated.
5. Analysis
MOP gear coupling found damaged and replaced by same.
Date 28/06/08
Date 28/06/08
Nil
General Manager-I