Problem #5, P 137: - Expando, Inc. Is Considering The Possibility of Building An Additional Factory
Problem #5, P 137: - Expando, Inc. Is Considering The Possibility of Building An Additional Factory
Problem #5, P 137: - Expando, Inc. Is Considering The Possibility of Building An Additional Factory
Build small
factory
Expando,
Inc.
Build large
factory
ALTERNATIVE
Build
small_high
demand =
$ 4.8M
$6M
Low demand
Build
(0.60)
small_low
demand =
$4M
High demand
Build
(0.40)
large_high
demand =
$ 2.6M
$5M
Low demand
Build
(0.60)
large_low
demand =
REVENU COST $1M
VALUE
E
High demand
(0.40)
$ 12 M
$6M
$6M
$ 10 M
$6M
$4 M
$ 14 M
$9M
$5 M
Expected Values
Computing for Expected Values
associated w/current decision
alternatives
Sample computation: Build small factory
Value of high demand alternative ($6M) x
High demand probability (0.4)
+
Value of low demand alternative ($4M) x
Low demand probability (0.6)
= $ 4.8 M