7.

0 PENGIRAAN KOS

Kos Bahan
BIL

BAHAN

HARGA SEUNIT

KUANTITI

HARGA (RM)

(RM)

Kabel 1.5mm2 , Merah

60.00/segelung

8.3 meter

4.98

Kabel 1.5mm2 , Hitam

60.00/segelung

1.2 meter

0.72

Kabel 1.5mm2 , Hijau

60.00/segelung

5.5 meter

3.30

Kabel 2.5mm2 , Merah

110.00/segelung

2 meter

2.20

Kabel 2.5mm2 , Hitam

110.00/segelung

2 meter

2.20

Kabel 2.5mm2 , Hijau

110.00/segelung

1.6 meter

1.76

Suis Dua Hala

8.50/unit

2 unit

17.00

Suis Antara (Intermediate)

22.00/unit

1 unit

22.00

Tapak Mentol (Pin)

2.20/unit

1 unit

2.20

10

Mentol

3.00/sebiji

1 biji

3.00

11

Base Lampu (Round Block)

2.80/unit

1 unit

2.80

12

Soket 13A

5.40/unit

2 unit

10.80

13

Tapak Suis (Suis perantaraan )

2.50/unit

1 unit

2.50

14

Tapak Suis (Dua hala)

2.00/unit

2 unit

4.00

15

Paku Wiring

12.00/sekotak

1 kotak

12.00

16

Timah (Klip Plumbum)

0.30/ sekeping

42 keping

12.60

JUMLAH

104.06

Kos Overhed

BIL
1
2

PERKARA

HARGA SEUNIT

Elektrik
Air

(RM)
0.30/jam
0.1/jam

KUANTITI

HARGA

6 jam
6 jam
JUMLAH

(RM)
1.80
0.60
2.40

Kos upah

KOS UPAH

= BILANGAN ORANG X MASA (Jam) X KADAR SEJAM


= 1 X 6 jam x RM5.00
= RM30.00

Secara rumusan, pengiraan kos bagi litar pendawaian permukaan ini adalah seperti
berikut:
Kos projek

= kos bahan + kos upah + kos overhed


= RM104.06 + RM 30.00 + RM 2.40
= RM 136.46