MD4-4
Block:
Item :
Consultant :
SPCC
Contractor :
HANG DAI
Ordinal
Pile No.
Length
(m)
Depth
(m)
Underground
(m)
GL
(m)
Actual pile
head level
(m)
H
(m)
Effective
Pile Length
(m)
Jacking
Load (T)
95PB
610
22.50
29.60
7.10
-0.60
-7.70
-8.60
0.90
21.60
480.0
95PB
611
22.50
29.50
7.00
-0.60
-7.60
-8.60
1.00
21.50
480.0
95PB
612
22.50
29.50
7.00
-0.70
-7.70
-8.60
0.90
21.60
480.0
95PB
602
22.50
29.70
7.20
-0.50
-7.70
-8.60
0.90
21.60
480.0
95PB
601
22.50
30.30
7.80
-0.50
-8.30
-8.60
0.30
22.20
480.0
95PB
600
22.50
30.20
7.70
-0.50
-8.20
-8.60
0.40
22.10
480.0
95PB
599
22.50
30.15
7.65
-0.40
-8.05
-8.60
0.55
21.95
480.0
95PB
598
22.50
30.40
7.90
-0.40
-8.30
-8.60
0.30
22.20
480.0
95PB
622
22.50
29.60
7.10
-0.60
-7.70
-8.60
0.90
21.60
480.0
10
95PB
621
22.50
29.50
7.00
-0.60
-7.60
-8.60
1.00
21.50
480.0
11
95PB
620
22.50
29.50
7.00
-0.60
-7.60
-8.60
1.00
21.50
480.0
Page 1
Date
Ln 1 38mm,
ln 2 8mm
Ln 1 60mm,
ln 2 7mm
Ln 1 70mm,
ln 2 8mm
Ln 1 40mm,
ln 2 8mm
Ln 1 36mm,
ln 2 5mm
Ln 1 40mm,
ln 2 9mm
Ln 1 38mm,
ln 2 21mm,ln 3
7mm
Ln 1 32mm,
ln 2 6mm
Ln 1 38mm,
ln 2 8mm
Ln 1 40mm,
ln 2 9mm
Ln 1 50mm,
ln 2 8mm
19/09/15
Sheet1
MD4-4
Block:
Item :
Consultant :
SPCC
Contractor :
HANG DAI
Ordinal
Pile No.
Length
(m)
Depth
(m)
Underground
(m)
GL
(m)
Actual pile
head level
(m)
H
(m)
Effective
Pile Length
(m)
Jacking
Load (T)
12
95PB
919
22.50
29.80
7.30
-0.50
-7.80
-8.60
0.80
21.70
480.0
13
95PB
618
22.50
29.90
7.40
-0.50
-7.90
-8.60
0.70
21.80
480.0
14
95PB
617
22.50
29.90
7.40
-0.50
-7.90
-8.60
0.70
21.80
480.0
15
95PB
616
22.50
29.70
7.20
-0.50
-7.70
-8.60
0.90
21.60
480.0
16
95PB
615
22.50
29.70
7.20
-0.50
-7.70
-8.60
0.90
21.60
480.0
17
95PB
605
22.50
29.80
7.30
-0.40
-7.70
-8.60
0.90
21.60
480.0
18
95PB
606
22.50
30.00
7.50
-0.40
-7.90
-8.60
0.70
21.80
480.0
19
95PB
607
22.50
30.00
7.50
-0.40
-7.90
-8.60
0.70
21.80
480.0
20
95PB
608
22.50
30.10
7.60
-0.30
-7.90
-8.60
0.70
21.80
480.0
21
95PB
609
22.50
29.80
7.30
-0.30
-7.60
-8.60
1.00
21.50
480.0
22
95PB
585
22.50
30.10
7.60
-0.50
-8.10
-8.60
0.50
22.00
480.0
Page 2
Date
Ln 1 20mm,
ln 2 7mm
Ln 1 20mm,
ln 2 9mm
Ln 1 30mm,
ln 2 7mm
Ln 1 30mm,
ln 2 7mm
Ln 1 40mm,
ln 2 8mm
Ln 1 30mm,
ln 2 9mm
Ln 1 50mm,
ln 2 8mm
Ln 1 40mm,
ln 2 8mm
Ln 1 30mm,
ln 2 8mm
Ln 1 30mm,
ln 2 8mm
Ln 1 37mm,
ln 2 8mm
21/9/2015
Sheet1
MD4-4
Block:
Item :
Consultant :
SPCC
Contractor :
HANG DAI
Ordinal
Pile No.
Length
(m)
Depth
(m)
Underground
(m)
GL
(m)
Actual pile
head level
(m)
H
(m)
Effective
Pile Length
(m)
Jacking
Load (T)
Date
23
95PB
584
22.50
30.10
7.60
-0.50
-8.10
-8.60
0.50
22.00
480.0
Ln 1 41mm,
ln 2 7mm
24
95PB
595
22.50
29.80
7.30
-0.40
-7.70
-8.60
0.90
21.60
480.0
Ln 1 25mm,
ln 2 13mm,ln 5mm
25
95PB
596
22.50
29.80
7.30
-0.50
-7.80
-8.60
0.80
21.70
480.0
26
95PB
597
22.50
29.70
7.20
-0.50
-7.70
-8.60
0.90
21.60
480.0
27
95PB
626
22.50
29.70
7.20
-0.50
-7.70
-8.60
0.90
21.60
480.0
28
95PB
627
22.50
29.80
7.30
-0.40
-7.70
-8.60
0.90
21.60
480.0
29
95PB
628
22.50
29.80
7.30
-0.40
-7.70
-8.60
0.90
21.60
480.0
30
95PB
629
22.50
29.90
7.40
-0.40
-7.80
-8.60
0.80
21.70
480.0
31
95PB
630
22.50
29.90
7.40
-0.40
-7.80
-8.60
0.80
21.70
480.0
32
95PB
632
22.50
29.80
7.30
-0.40
-7.70
-8.60
0.90
21.60
480.0
33
95PB
633
22.50
29.90
7.40
-0.40
-7.80
-8.60
0.80
21.70
480.0
Page 3
Ln 1 30mm,
ln 2 8mm
Ln 1 32mm,
ln 2 8mm
Ln 1 36mm,
ln 2 8mm
Ln 1 38mm,
ln 2 9mm,ln 3
6mm
Ln 1 52mm,
ln 2 9mm
Ln 1 32mm,
ln 2 9mm
Ln 1 28mm,
ln 2 7mm
Ln 1 30mm,
ln 2 8mm
Ln 1 31mm,
ln 2 9mm
22/09/2015
Sheet1
MD4-4
Block:
Item :
Consultant :
SPCC
Contractor :
HANG DAI
Ordinal
Pile No.
Length
(m)
Depth
(m)
Underground
(m)
GL
(m)
Actual pile
head level
(m)
H
(m)
Effective
Pile Length
(m)
Jacking
Load (T)
34
95PB
623
22.50
29.80
7.30
-0.50
-7.80
-8.60
0.80
21.70
480.0
35
95PB
574
22.50
29.90
7.40
-0.40
-7.80
-8.60
0.80
21.70
480.0
36
95PB
575
22.50
30.00
7.50
-0.40
-7.90
-8.60
0.70
21.80
480.0
37
95PB
577
22.50
29.90
7.40
-0.50
-7.90
-8.60
0.70
21.80
480.0
38
95PB
578
22.50
29.80
7.30
-0.50
-7.80
-8.60
0.80
21.70
480.0
39
95PB
579
22.50
29.80
7.30
-0.50
-7.80
-8.60
0.80
21.70
480.0
40
95PB
580
22.50
29.90
7.40
-0.40
-7.80
-8.60
0.80
21.70
480.0
41
95PB
581
22.50
29.90
7.40
-0.40
-7.80
-8.60
0.80
21.70
480.0
42
95PB
591
22.50
29.70
7.20
-0.60
-7.80
-8.60
0.80
21.70
480.0
43
95PB
590
22.50
29.60
7.10
-0.60
-7.70
-8.60
0.90
21.60
480.0
44
95PB
589
22.50
29.90
7.40
-0.50
-7.90
-8.60
0.70
21.80
480.0
45
95PB
588
22.50
29.80
7.30
-0.50
-7.80
-8.60
0.80
21.70
480.0
Page 4
Date
Ln 1 40mm,
ln 2 8mm
Ln 1 31mm,
ln 2 8mm
Ln 1 30mm,
ln 2 7mm
Ln 1 22mm,
ln 2 8mm
Ln 1 32mm,
ln 2 8mm
Ln 1 30mm,
ln 2 8mm
Ln 1 30mm,
ln 2 8mm
Ln 1 39mm,
ln 2 8mm
Ln 1 35mm,
ln 2 9mm
Ln 1 30mm,
ln 2 9mm
Ln 1 45mm,
ln 2 7mm
Ln 1 24mm,
ln 2 5mm
23/09/15
Sheet1
MD4-4
Block:
Item :
Consultant :
SPCC
Contractor :
HANG DAI
Ordinal
Pile No.
Length
(m)
Depth
(m)
Underground
(m)
GL
(m)
Actual pile
head level
(m)
H
(m)
Effective
Pile Length
(m)
Jacking
Load (T)
46
95PB
587
22.50
29.80
7.30
-0.50
-7.80
-8.60
0.80
21.70
480.0
47
95PB
586
22.50
29.70
7.20
-0.50
-7.70
-8.60
0.90
21.60
480.0
48
95PB
573
22.50
29.70
7.20
-0.40
-7.60
-8.60
1.00
21.50
480.0
49
95PB
563
22.50
30.00
7.50
-0.45
-7.95
-8.60
0.65
21.85
480.0
50
95PB
564
22.50
30.00
7.50
-0.40
-7.90
-8.60
0.70
21.80
480.0
51
95PB
565
22.50
30.00
7.50
-0.50
-8.00
-8.60
0.60
21.90
480.0
52
95PB
566
22.50
29.90
7.40
-0.45
-7.85
-8.60
0.75
21.75
480.0
53
95PB
567
22.50
29.70
7.20
-0.50
-7.70
-8.60
0.90
21.60
480.0
54
95PB
568
22.50
29.80
7.30
-0.55
-7.85
-8.60
0.75
21.75
480.0
55
95PB
569
22.50
29.70
7.20
-0.60
-7.80
-8.60
0.80
21.70
480.0
56
95PB
561
22.50
29.90
7.40
-0.50
-7.90
-8.60
0.70
21.80
480.0
57
95PB
560
22.50
29.90
7.40
-0.50
-7.90
-8.60
0.70
21.80
480.0
Page 5
Date
Ln 1 20mm,
ln 2 7mm
Ln 1 18mm,
ln 2 3mm
Ln 1 18mm,
ln 2 6mm
Ln 1 30mm,
ln 2 7mm
Ln 1 24mm,
ln 2 9mm
Ln 1 27mm,
ln 2 6mm
Ln 1 40mm,
ln 2 9mm
Ln 1 30mm,
ln 2 7mm
Ln 1 32mm,
ln 2 8mm
Ln 1 39mm,
ln 2 9mm
Ln 1 29mm,
ln 2 8mm
Ln 1 30mm,
ln 2 7mm
24/09/15
Sheet1
MD4-4
Block:
Item :
Consultant :
SPCC
Contractor :
HANG DAI
Ordinal
Pile No.
Length
(m)
Depth
(m)
Underground
(m)
GL
(m)
Actual pile
head level
(m)
H
(m)
Effective
Pile Length
(m)
Jacking
Load (T)
58
95PB
559
22.50
29.90
7.40
-0.60
-8.00
-8.60
0.60
21.90
480.0
59
95PB
558
22.50
29.80
7.30
-0.50
-7.80
-8.60
0.80
21.70
480.0
60
95PB
557
22.50
29.90
7.40
-0.50
-7.90
-8.60
0.70
21.80
480.0
61
95PB
556
22.50
29.80
7.30
-0.50
-7.80
-8.60
0.80
21.70
480.0
62
95PB
555
22.50
30.30
7.80
-0.40
-8.20
-8.60
0.40
22.10
480.0
63
95PB
554
22.50
30.30
7.80
-0.40
-8.20
-8.60
0.40
22.10
480.0
64
95PB
553
22.50
30.30
7.80
-0.40
-8.20
-8.60
0.40
22.10
480.0
65
95PB
552
22.50
30.30
7.80
-0.30
-8.10
-8.60
0.50
22.00
480.0
66
95PB
551
22.50
30.40
7.90
-0.40
-8.30
-8.60
0.30
22.20
480.0
67
5PB
520
25.50
30.60
5.10
-0.50
-5.60
-5.80
0.20
25.30
480.0
68
5PB
518
25.50
30.70
5.20
-0.40
-5.60
-5.80
0.20
25.30
480.0
69
5PB
519
25.50
30.70
5.20
-0.45
-5.65
-5.80
0.15
25.35
480.0
Page 6
Date
Ln 1 20mm,
ln 2 6mm
Ln 1 20mm,
ln 2 7mm
Ln 1 35mm,
ln 2 7mm
Ln 1 30mm,
ln 2 7mm
Ln 1 21mm,
ln 2 6mm
Ln 1 30mm,
ln 2 9mm
Ln 1 25mm,
ln 2 7mm
Ln 1 29mm,
ln 2 8mm
Ln 1 30mm,
ln 2 7mm
Ln 1 24mm,
ln 2 7mm
Ln 1 28mm,
ln 2 7mm
Ln 1 25mm,
ln 2 7mm
,25/9/2015
Sheet1
MD4-4
Block:
Item :
Consultant :
SPCC
Contractor :
HANG DAI
Ordinal
Pile No.
Length
(m)
Depth
(m)
Underground
(m)
GL
(m)
Actual pile
head level
(m)
H
(m)
Effective
Pile Length
(m)
Jacking
Load (T)
70
5PB
516
25.50
30.60
5.10
-0.50
-5.60
-5.80
0.20
25.30
480.0
71
5PB
517
25.50
30.50
5.00
-0.40
-5.40
-5.80
0.40
25.10
480.0
72
6PB
525
25.00
30.30
5.30
-0.55
-5.85
-6.00
0.15
24.85
480.0
73
6PB
526
25.00
30.30
5.30
-0.40
-5.70
-6.00
0.30
24.70
480.0
74
6PB
523
25.00
30.30
5.30
-0.60
-5.90
-6.00
0.10
24.90
480.0
75
6PB
521
25.00
30.30
5.30
-0.50
-5.80
-6.00
0.20
24.80
480.0
76
6PB
522
25.00
30.30
5.30
-0.55
-5.85
-6.00
0.15
24.85
480.0
77
6PB
527
25.00
30.30
5.30
-0.50
-5.80
-6.00
0.20
24.80
480.0
78
6PB
528
25.00
30.50
5.50
-0.50
-6.00
-6.00
0.00
25.00
480.0
79
6PB
530
25.00
30.20
5.20
-0.60
-5.80
-6.00
0.20
24.80
480.0
80
6PB
529
25.00
30.20
5.20
-0.40
-5.60
-6.00
0.40
24.60
480.0
81
6PB
531
25.00
30.20
5.20
-0.60
-5.80
-6.00
0.20
24.80
480.0
Page 7
Date
Ln 1 30mm,
ln 2 7mm
Ln 1 25mm,
ln 2 7mm
Ln 1 19mm,
ln 2 6mm
Ln 1 35mm,
ln 2 7mm
Ln 1 32mm,
ln 2 5mm
Ln 1 23mm,
ln 2 7mm
Ln 1 30mm,
ln 2 8mm
Ln 1 31mm,
ln 2 9mm
Ln 1 30mm,
ln 2 9mm
Ln 1 36mm,
ln 2 8mm
Ln 1 30mm,
ln 2 7mm
Ln 1 38mm,
ln 2 7mm
,26/9/2015
Sheet1
MD4-4
Block:
Item :
Consultant :
SPCC
Contractor :
HANG DAI
Ordinal
Pile No.
Length
(m)
Depth
(m)
Underground
(m)
GL
(m)
Actual pile
head level
(m)
H
(m)
Effective
Pile Length
(m)
Jacking
Load (T)
82
6PB
532
25.00
30.10
5.10
-0.40
-5.50
-6.00
0.50
24.50
480.0
83
6PB
538
25.00
30.20
5.20
-0.45
-5.65
-6.00
0.35
24.65
480.0
84
6PB
539
25.00
30.10
5.10
-0.40
-5.50
-6.00
0.50
24.50
480.0
85
6PB
537
25.00
30.20
5.20
-0.50
-5.70
-6.00
0.30
24.70
480.0
Page 8
Date
Ln 1 40mm,
ln 2 8mm
Ln 1 28mm,
ln 2 7mm
Ln 1 28mm,
ln 2 9mm
Ln 1 37mm,
ln 2 7mm