WBS Mechanical and Instalation

By : Angga PT

Mechanical and
Instalation
Mekanisme
pembuatan
pektin

List
spesifikasi
alat

jadwal
maintance

Tata letak
pabrik

Emergency
system

pembuatan
kartu
prosedur
alat kerja

Survey
kebutuhan
alat

pegelompok
kan alat

pengukuran
luas area

pengadaan
safety tools

instalasi
alat
produksipek
tin

membuat
list
spesifikasi
alat

pembagian
waktu
maintace

pembagian
area pabrik

pembuatan
jalur
evakuasi

pembuatan
gambar
teknik
N
o

Uraian

Biaya tanah dan perataan

Biaya pembangunan pabrik

Peralatan Pabrik
a.

Tangki HCl

b.
Bak penampung cake
kulit

Satu
an

Jumlah

Harga / satuan

Harga Total

m2

19000

IDR
110,000.00

IDR
1,963,500,000.00

10000

IDR
2,500,000.00

IDR
25,000,000,000.0
0

IDR
12,432,950.00

IDR
12,432,950.00

IDR
4,000,000.00

IDR
12,000,000.00

IDR
10,325,500.00
IDR
11,000,000.00
IDR
12,325,000.00
IDR
10,555,000.00

IDR
10,325,500.00
IDR
11,000,000.00
IDR
12,325,000.00
IDR
10,555,000.00

m2

Biaya per gram

#DIV/0!
#DIV/0!
#DIV/0!

c.

Pompa HCl

d.

Pompa ekstraktor

e.

Pompa Filtrat

f.
Pompa produk bawah
Evaporator

Duras
i/
Tahun

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

g.
Pompa produk atas
Evaporator

IDR
10,080,000.00

IDR
10,080,000.00

h. Tangki produk atas


Evaporator

IDR
22,876,000.00

IDR
22,876,000.00

IDR
13,457,000.00
IDR
156,878,000.00
IDR
10,188,900.00

IDR
13,457,000.00
IDR
156,878,000.00
IDR
10,188,900.00

IDR
24,555,000.00

IDR
24,555,000.00

IDR
11,777,600.00
IDR
12,446,780.00
IDR
12,446,780.00

IDR
11,777,600.00
IDR
12,446,780.00
IDR
12,446,780.00

IDR
216,777,800.00

IDR
216,777,800.00

IDR
55,675,000.00
IDR
292,525,373.00
IDR
90,088,789.00
IDR
1,116,430,000.0
0
IDR
132,445,678.00
IDR
438,810,000.00
IDR
115,675,800.00
IDR
1,156,445,699.0
0
IDR
498,778,650.00
IDR
17,665,667.00
IDR
44,599,089.00
IDR
165,998,999.00
IDR
68,998,990.00
IDR
115,991,067.00
IDR
39,727,899.00
IDR
39,727,899.00
IDR
452,667,117.00

IDR
55,675,000.00
IDR
292,525,373.00
IDR
270,266,367.00

i.

Pompa cooler

j.

Tangki destilasi

k.

Pompa

l.
air

Tangki penampungan

m.

Pompa air instalasi

n.

Pompa

o.

Pompa filtrat

p. Tangki penampungan
produk

q.

Belt conveyor

r.

Shradder/ Crusher

s.

Screw Conveyor

t.

Tanki ekstraktor

u.

RDVF

v.

Evaporator

w. Kondensor

x.

Mixer

y.

Rotary Dryer

z.

Blower

aa. Cooler

bb. Kondensor

cc. Screening

dd. Sand Filter

ee. Penukar Kation

ff.

Penukar Anion

gg. Boiler

IDR
1,116,430,000.00
IDR
794,674,068.00
IDR
438,810,000.00
IDR
115,675,800.00
IDR
2,312,891,398.00
IDR
498,778,650.00
IDR
17,665,667.00
IDR
44,599,089.00
IDR
165,998,999.00
IDR
68,998,990.00
IDR
115,991,067.00
IDR
39,727,899.00
IDR
39,727,899.00
IDR
452,667,117.00

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

10
10
10
10
5
10
10
20
20
20
10
10
20
20
5
10
20
20
30

#DIV/0!
IDR
0.00060
IDR
0.01046
IDR
0.00269
IDR
0.01411
IDR
0.01738
IDR
0.05385
IDR
0.02236
IDR
0.01058
IDR
0.00279
IDR
0.04183
IDR
0.02406
IDR
0.00085
IDR
0.00108
IDR
0.00400
IDR
0.00666
IDR
0.00559
IDR
0.00096
IDR
0.00096
IDR
0.00728

hh. Deaerator

ii.

Clarifier

jj.

Bak Pengendapan

kk. Tangki NaOH

ll.

Tangki asam sulfat

Tangki Kaporit

mm.

nn. Kolam Aerasi

oo. Pompa

Total

IDR
22,799,879.00
IDR
453,778,967.00
IDR
7,600,000.00
IDR
2,546,700.00
IDR
3,580,000.00
IDR
2,560,000.00
IDR
22,765,000.00
IDR
5,500,000.00

IDR
22,799,879.00
IDR
453,778,967.00
IDR
7,600,000.00
IDR
2,546,700.00
IDR
3,580,000.00
IDR
2,560,000.00
IDR
22,765,000.00
IDR
33,000,000.00
Rp. 34913366240

20
20
30
30
30
30
30
5

IDR
0.00055
IDR
0.01094
IDR
0.00012
IDR
0.00004
IDR
0.00006
IDR
0.00004
IDR
0.00037
IDR
0.00186

You might also like