Record Reference: Project Name: Client: Consultant: Contractor: Project Manager: Ir No: Rev No

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 4

METHOD STATEMENT SUBMITTAL

Record Reference:
Project Details:
Project Name:
Shamkha South Infrastructure Works Lot 3
Client
:
Musanada
Consultant
:
Contractor :
CSCEC-JV-ARC
Project Manager:
IR NO
:
Rev No
:
Discipline:

Roads

Electrical

Water

Drainage

Irrigation

Telecommunication Others

INSTALLATION OF NEW 48V DC SYSTEM


Contents :
1. Purpose
2. Scope
3. Legislation and Code of Practice
4. References
5. Definitions
6. Resources
6.1 Material
6.2 Sub Contractors
6.3 Shop Drawing
6.4 Tools and Equipments
6.5 Human Resources
7. Safety
8. Construction Method
8.1 Prior Activities
8.2 Procedures
9. Construction Program
10. Inspection and Testing
11. Related Forms
12. Attachments
Contractor Signature :
Discipline
Engineer:
The Engineer:
A- Approved
Comments:

QA/QC

B- Approved with Comments

HSE

MEP

C-Revise and Resubmit

D- Rejected

Distribution:
Page 1 of 8

Musanada

Engineer

Contractor

Page 2 of 8

Date : Feb 2012

Mott MacDonald
PARSONS

3
Others

Construction Manager:

Page 3 of 8

Page 4 of 8

You might also like