Bill of Quantities/Materials

Item

Quantity

A. PRE CONSTRUCTION
1.) Mobilization / Demobilization
2.) Clearing and Grabbing
4.) Temfacil

Unit Cost
Labor

1 lot
1 lot
1 lot

Materials

Total
Unit Cost

Total Amount

PhP 50,000.00
PhP 50,000.00
PhP 50,000.00

PhP 50,000.00
PhP 50,000.00
PhP 50,000.00

PhP 50,000.00
PhP 50,000.00
PhP 50,000.00

B. CONSTRUCTION
1.) Civil Works / RC
a. Concrete
b. Gravel Bedding

112.44 cu.m.
9.60 cu.m.

250.00 /cu.m.
120.00 /cu.m.

4500.00 /cu.m.
1100.00 /cu.m.

PhP 4,750.00
PhP 1,220.00

PhP 534,068.63
PhP 11,715.05

5060.32 kg
2294.48 kg
13163.65 kg

5.00 /kg
5.00 /kg
5.00 /kg

35.00 /kg
35.00 /kg
35.00 /kg

PhP 40.00
PhP 40.00
PhP 40.00

PhP 202,412.88
PhP 91,779.20
PhP 526,545.90

3.) Formworks (Installation / Stripping/Shoring)

962.83 sq.m.

155.00 /sq.m.

990.00 /sq.m.

PhP 1,145.00

PhP 1,102,435.77

3.) Masonry Works


a. 6" CHB Laying
b. Stiffiner Column
c. Lintel Beam
d. Plastering

710.59 sq.m.
433.55 l.m.
417.99 l.m.
1421.17 sq.m.

100.00 /sq.m.
120.00 /l.m.
120.00 /l.m.
85.00 /sq.m.

250.00 /sq.m.
450.00 /l.m.
450.00 /l.m.
250.00 /sq.m.

PhP 350.00
PhP 570.00
PhP 570.00
PhP 335.00

PhP 248,704.75
PhP 247,123.50
PhP 238,254.59
PhP 476,091.95

1411.37 l.m.
2179.76 l.m.

300.00 /l.m.
300.00 /l.m.

450.00 /l.m.
450.00 /l.m.

PhP 750.00
PhP 750.00

PhP 1,058,529.00
PhP 1,634,817.00

2.) Rebar Reinforcement


a. 12mm Diameter DB
b. 16mm Diameter DB
c. 10mm Diameter DB

(Grade 40)
(Grade 40)
(Grade 40)

4.) Specialty Works


a. 1" x 1 1/2" Tobular Steel
b. 5/8" Square Bar

PhP 6,522,478.21

Sub-Total (A)

Staff / Attendance Fee and Safety Staff

1 lot

PhP 100,000.00

PhP 100,000.00

PhP 100,000.00
PhP 100,000.00

Sub-Total (B)

Indirect cost

PhP 652,247.82

Profit (10% of A)

PhP 652,247.82

Sub-Total (C)

TOTAL CONTRACT AMOUNT

PhP 7,274,726.03