Professional Documents
Culture Documents
Contoh Soal Produksi Peralatan Mekanis (Direct Computation)
Contoh Soal Produksi Peralatan Mekanis (Direct Computation)
(DIRECT COMPUTATION)
1.
Penggusuran
P
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
KB
FK
J
F
R
Z
SF
D
KB x 60 x FK
x SF x D
J
J
Z
F R
Produksi Bulldozer
Produksi Batubara, (ton/jam)
Produksi Tanah,
(BCM/jam)
Kapasitas Blade,
(m3)
Faktor Koreksi
Jarak dorong,
(m)
Kecepatan Maju,
(m/menit)
Kecepatan Mundur, (m/menit)
Waktu tetap,
(menit)
Swell Factor
0,8 (tanah)
0,7 (batubara)
Density,
(ton/m3)
3
1,9 ton/m (tanah)
1,3 ton/m3 (batubara)
Contoh Perhitungan :
Diketahui :
KB = Kapasitas Blade
FK = faktor koreksi
= Eff x FB
J
= Jarak dorong
F
= Kecepatan Maju
R
= Kecepatan Mundur
Z
= Waktu tetap
SF = Swell Factor
D
Density
= 8,68 m3
= 0,85 x 0,85 = 0,7225
= 60 m
= 180 m/menit
= 231,67 m/menit
= 0,05 menit
= 0,8 (tanah)
= 0,7 (batubara)
= 1,9 ton/m3 (tanah)
= 1,3 ton/m3 (batubara)
Ditanya :
P
= Produksi Bulldozer ? (Produksi Batubara dan Produksi Tanah)
Jawab :
1) Produksi Batubara
8,68 m3 x 60 x 0,7225
x 0,7 x 1,3
60
60
P =
0,05
180 231,67
= 533,09 ton/jam
2)
b.
Produksi Tanah
8,68 m3 x 60 x 0,7225
x 0,8
60
60
P=
0,05
180 231,67
= 468,65 BCM/jam
Penggaruan (Ripping)
W x K x J x 60 x FK
x SF x D
J J
P=
Z
F R
P
K
W
FK
J
F
R
Z
SF
D
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Produksi Ripper
Produksi Batubara,
Produksi Tanah,
Kedalaman penggaruan,
Lebar Garuan (2 x K),
Faktor Koreksi
Eff. Kerja
Jarak dorong,
Kecepatan Maju,
Kecepatan Mundur,
Waktu tetap,
Swell Factor
0,8 (tanah)
0,7 (batubara)
Density,
1,9 ton/m3 (tanah)
1,3 ton/m3 (batubara)
Contoh Perhitungan :
Diketahui :
K
= Kedalaman penggaruan
W
= 2 x K = 2 x 0,3
FK = faktor koreksi
= Eff. Kerja
J
= Jarak dorong
F
= Kecepatan Maju
R
= Kecepatan Mundur
Z
= Waktu tetap
SF = Swell Factor
D
Density
(ton/jam)
(BCM/jam)
(m)
(m)
(m)
(m/menit)
(m/menit)
(menit)
(ton/m3)
= 0,3 m
= 0,6
= 0,83
= 30 m
= 180 m/menit
= 231,67 m/menit
= 0,05 menit
= 0,8 (tanah)
= 0,7 (batubara)
= 1,9 ton/m3 (tanah)
= 1,3 ton/m3 (batubara)
Ditanya :
P
= Produksi Ripper ? (Produksi Batubara dan Produksi Tanah)
Jawab :
1) Produksi Batubara
0,6 x 0,3 x 30 x 60 x 0,83
x 0,7 x 1,3
30
30
P =
0,05
180 231,67
= 706,18 ton/jam
2)
c.
Produksi Tanah
0,6 x 0,3 x 30 x 60 x 0,83
x 0,8
30
30
P =
0,05
180 231,67
= 620,82 BCM/jam
Kombinasi
1)
Produksi Batubara
Pd x Pr
P = Pd Pr
P = Produksi Kombinasi
Pd = Produksi Bulldozer
Pr = Produksi Ripper
533,09 x 706,18
P = 533,09 706,18
= 303,77 ton/jam
2)
Produksi Tanah
468,65 x 620,82
P = 468,65 620,82
= 267,05 BCM/jam
2.
EXCAVATOR
a. EXCAVATOR (Loading Over Burden di Front; Kapasitas 8 LCM)
P
=
=
=
=
=
KB
FK
KB x FK x 60
x SF x D
CT
Produksi Excavator
Produksi Batubara,
Produksi Tanah,
Kapasitas bucket,
Faktor Koreksi
(ton/jam)
(BCM/jam)
(m3)
CT
SF
D
=
=
=
=
=
=
=
Cycle time,
Swell Factor
0,8 (tanah)
0,7 (batubara)
Density,
1,9 ton/m3 (tanah)
1,3 ton/m3 (batubara)
Contoh Perhitungan :
Diketahui :
KB = Kapasitas bucket
FK
CT
SF
=
=
=
=
Faktor Koreksi
Eff x Fb = 0,85 x 0,9
Cycle time
Swell Factor
Density
(menit)
(ton/m3)
= 8 m3 (tanah)
= 4,4 m3 (batubara)
= 0,765
= 0,5 menit
= 0,8 (tanah)
= 0,7 (batubara)
= 1,9 ton/m3 (tanah)
= 1,3 ton/m3 (batubara)
Ditanya :
P
= Produksi Excavator (Pemuatan Overburden) ?
Jawab :
P=
8 x 0,765 x 60
x 0,8
0,5
= 587,52 BCM/jam
b. EXCAVATOR (Loading Batubara di Front; Kapasitas 4,4 LCM)
P=
P
KB
FK
CT
SF
D
KB x FK x 60
x SF x D
CT
=
=
=
=
=
=
=
=
=
=
=
=
Produksi Excavator
Produksi Batubara,
Produksi Tanah,
Kapasitas bucket,
Faktor Koreksi
Cycle time,
Swell Factor
0,8 (tanah)
0,7 (batubara)
Density,
1,9 ton/m3 (tanah)
1,3 ton/m3 (batubara)
(ton/jam)
(BCM/jam)
(m3)
(menit)
(ton/m3)
Contoh Perhitungan :
Diketahui :
KB = Kapasitas bucket
FK
CT
SF
=
=
=
=
Faktor Koreksi
Eff x Fb = 0,85 x 0,9
Cycle time
Swell Factor
Density
= 8 m3 (tanah)
= 4,4 m3 (batubara)
= 0,765
= 0,5 menit
= 0,8 (tanah)
= 0,7 (batubara)
= 1,9 ton/m3 (tanah)
= 1,3 ton/m3 (batubara)
Ditanya :
P
= Produksi Excavator (Pemuatan Batubara) ?
Jawab :
P=
4,4 x 0,765 x 60
x 0,7 x 1,3
0,5
= 367,57 BCM/jam
3.
P =
P
n
kb
fb
Eff
SF
CT
n x kb x fb x Eff x 60
x SF
CT
= Produksi dump truck
= Produksi Batubara,
= Produksi Tanah,
= frekwensi pengisian
= Kapasitas bucket excavator,
= faktor bucket exavator
= Efisiensi Kerja
= Swell factor
= Cycle time dump truck,
(ton/jam)
(BCM/jam)
(m3)
(menit)
Contoh Perthitungan :
Diketahui :
kb
= Kapasitas bucket excavator = 8 m3
fb
= faktor bucket exavator
= 0,9
n
= frekwensi pengisian dump truck
= kapasitas dump truck / kapasitas real excavator
(dimana, kapasitas real excavator = kb x fb = 8 x 0,9 = 7,2 m3)
= 35 / 7,2 5 kali
Eff = Efisiensi Kerja
= 0,85
SF = Swell factor
= 0,8
CT = Cycle time dump truck
= 12,6
Dimana :
CT Excavator
waktu muat
waktu dumping
waktu angkut (2 km; 25 km/jam)
Total CT (ke penimbunan)
= 0,5 menit
= 5 x 0,5 = 2,5 menit
= 0,5 menit
= 4,8 menit
= (4,8 x 2) + 2,5 + 0,5
= 12,6 menit
Ditanya :
P
= Produksi dump truck (produksi tanah) ?
Jawab :
P
5 x 8 x 0,9 x 0,85 x 60
x 0,8
12,6
= 116,57 BCM/jam
DUMP TRUCK (Hauling Batubara ke ROM; Kapasitas 20 LCM)
Pengangkutan batubara dari front penambangan menggunakan dump truck
kapasitas 20 LCM yang dimuat oleh Excavator kapasitas 4,4 LCM. Jarak Angkut
diasumsikan 2 km dari dari front Penambangan Blok Cinta dan Blok Berlian dan
kecepatan diasumsikan 25 km/jam, sedangkan untuk front penambangan area
Prospek II dan Prospek III diasumsikan jarak 5 km dengan kecepatan rata-rata
40 km/jam.
Pengangkutan Batubara dari Block Cinta dan Blok Berlian
P =
P
n
kb
fb
Eff
SF
D
CT
n x kb x fb x Eff x 60
x SF x D
CT
= Produksi dump truck
= Produksi Batubara,
= Produksi Tanah,
= frekwensi pengisian
= Kapasitas bucket excavator,
= faktor bucket exavator
= Efisiensi Kerja
= Swell factor
= Density material,
= Cycle time dump truck,
(ton/jam)
(BCM/jam)
(m3)
(ton/m3)
(menit)
Contoh Perthitungan :
Diketahui :
kb
= Kapasitas bucket excavator = 4,4 m3
fb
= faktor bucket exavator
= 0,9
n
= frekwensi pengisian dump truck
= kapasitas dump truck / kapasitas real excavator
(dimana, kapasitas real excavator = kb x fb = 4,4 x 0,9 = 3,96 m3)
= 20 / 3,96 6 kali
Eff = Efisiensi Kerja
= 0,85
SF = Swell factor
= 0,8
CT = Cycle time dump truck
= 13,1
D
= Density material
= 1,3 ton/m3
Dimana :
6
waktu muat
waktu dumping
waktu angkut (2 km; 25 km/jam)
Total CT (ke penimbunan)
Ditanya :
P
= Produksi dump truck (produksi batubara) ?
Jawab :
P
= 84,18 ton/jam
4.
P=
KB x FK x 60
x SF x D
CT
P
KB
FK
CT
SF
D
=
=
=
=
=
=
Produksi Loader,
Kapasitas bucket,
Faktor Koreksi
Cycle time,
Swell Factor
Density,
Contoh Perhitungan :
Diketahui :
KB = Kapasitas bucket
FK = Faktor Koreksi
= Eff x Fb
CT = Cycle time
SF = Swell Factor
D
= Density
(BCM/jam)
(m3)
(menit)
(ton/m3)
= 3,5 m3
= 0,85 x 0,85 = 0,7225
= 0,5 menit
= 0,7
=1,3 ton/m3
Ditanya :
P
= Produksi Loading Batubara ?
7
Jawab :
P=
3,5 x 0,7225 x 60
x 0,7 x 1,3
0,5
= 276,14 BCM/jam