Professional Documents
Culture Documents
NHDP Nov 2014 Gujarat
NHDP Nov 2014 Gujarat
Sr.
No.
Phase
Total Length
Completed
Length
Balance
Remark
Phase-I
602
602
GQ (NH-8)
Phase-II
637.5
637.5
E-W Corridor
Phase-III
532.7
458.6
74.1
Phase-IV
470
470
476
73.5
Phase-V
549.5
Phase-VI
(Out of total
473.00 Km in Guj.
State)
261.10
Phase-VII
260
260
56.16
2216.02
1151.64
261.10
Port Connect.
56.16
3367.66