Management Associate

MONTHLY PROGRESS REPORT

REPORT NO.
NAME :

08

PERIOD COVERED July 10, 2015

Muhammad Saqib Raza Rabbani

DESIGNATION:

Management Associate

P. NO. :

APP. BATCH:

1931

19

TO Aug.14, 2015

DATE: Aug.17, 2015


.
.

TO : TRAINING MANAGER
THRU :

SECTION / DEPT: Equipment Maintenance

/ __________.
UM Equipment

During the above mentioned period, I was in Equipment Urea/DAP and involved in following
jobs.

Urea Plant:

Globe Valve installation in the Reactor (UR-211) sample point flushing line.
Power brushing and insulation removal as per CUI requirement of UH-421.
Arrangement of thickness monitoring of different points on URL/URG lines in Urea Wet
as per Inspection requirement.
Cantilever Scaffolding erection at URL/URG lines as per inspection requirement.
Misc. Scaffolding erection and removal jobs.
Misc. Leakage rectification Jobs at Urea Plant.

DAP Plant:

Replacement of Bags of bag house against High P problem.


Misc. IDs opening and box up of De-dusting Circuit.
Misc. IDs opening and box up of Dryer Exhaust Gases Circuit.

Self study:

Study of Area General Course of Urea Plant.


Study of Drawing of Heat Exchanger UH-311.
Study of Drawing of Heat Exchanger AH-911.
Study of Drawing of Cooler (UH-132) after the hydrogen Convertor in CO2 Area.
Study of Drawing of High Pressure Carbamate Condenser UH-241.
Study of Krebs Painting Specifications.
Study of Krebs Thermal Insulation Specifications.
Study of IMS working procedure and bar charts of misc. equipment.
Study of different corrosion types at Urea Plant.
Study of P&I Diagrams of Urea Plant.
Study of piping specification of Urea Plant.
Study of Drawing of Urea Reactor (UR-211).
Study of Stop Series 5,6,7,8.

Study of API-650 and API-653 for tank repairs.

Study of ASME Sec. VIII, Div. 1 & 2 for Pressure Vessels.

SAP:

Use of various T-Codes (e.g MMBE,MM03,CV04N,IW31,IW38,IW21,IW28)for


efficient working.
Preparation of different heat exchangers data sheets for TA-16.