Ryan fielding

Producing a works order

DESIGN

PRODUCTIO
N CONTROL

CAM
MANAGE

PURCHASIN
G AND
MARKETING

WORKSH
OP

Reference:Https://learn2.open.ac.uk/pluginfile.php/1490902/mod_resource/content/1/ebook_fw15_managersgoodstudyguide_e3i1_n97807
49213879_l3.pdf#page=286

We were assigned a works order to produce and had to get all the required things in place, in order to get the component to
be machined.
The management of this was similar to Fayols as my version of the diagram shows Design drew the drawing and a works
order is ordered by marketing and raised by purchasing. From there our manager decided to have a program written by CAM.
The manager of CAM coordinated with his staff to complete this task and passed the works order onto production control.
Who checked that all the required items were there. This includes drawing from design, works order from purchasing and
program from CAM. Then a route is added and it is ready for machining.

Ryan fielding

Producing a works order

Colleague response; I agree with the diagram mostly but think there are also more links in-between the boxes and not just a
full circle.