Professional Documents
Culture Documents
3.0 Foundation Analysis For SBR Tank: Mat Foundation Will Be Adopted For The Base
3.0 Foundation Analysis For SBR Tank: Mat Foundation Will Be Adopted For The Base
All
dimension
shown on
drawi
drawings
are in
millim
millimeters
SHAPE OF WALLS
Shape 1
Shape 2
400
2000
3000
4700
EARTH
400
300
3000
4700
2000
300
Shape 3
700
700
Wall type 1, 4, 5, 6
700
Wall type 3
Shape 5
Wall type 8
Shape 6
400
3000
4700
5000
300
700
wall type 2
..
DISTANCE TO CENTROID.
Wall 1
x = 0.75 + (
.
y = 22.15 + (
) = 15.7m
.
4700
3.1
) = 22.38m
x 5 = 2.75m2
Wall 2
x = 3.95m
y = 19.5m
Wall 3
x = 15.7m
y = 11.8m
Wall 4
x = 15.7m
y = 0.75 + (0.7 x 2/3) = 1.22m
Wall 5
x = 0.75 + (0.7 x 2/3) = 1.22m
y = 6.45m
Wall 6
x = 0.75 + (0.7 x 2/3) = 1.22m
y = 17.15m
Wall 7
x = 6.45 + (0.7/3) = 6.68m
y = 6.45m
Wall 8
x = 6.68m
y = 17.15m
Wall 9
x =29.95 + 5 (0.7 x 2/3) = 30.42m
y = 6.45m
Wall 10
x = 30.42m
y = 17.15m
Base footing
x=
.
.
= 15.33m
y=
= 11.8m
Base area = 30.65 x 23.6 = 708.02m2.
Items
Wall 1
Wall 2
Wall 3
Wall 4
Wall 5
Wall 6
Wall 7
Wall 8
Wall 9
Wall 10
Base footing
2.75
2.90
2.75
2.75
2.75
2.75
2.75
2.75
2.75
2.75
708.02
733.67
15.7
3.95
15.7
15.7
1.22
1.22
6.68
6.68
30.42
30.42
15.33
22.38
19.5
11.38
1.22
6.45
17.15
6.45
17.15
6.45
17.15
11.8
Ax
Ay
43.18
3.56
43.18
43.18
3.35
3.35
18.38
18.38
83.65
83.65
10850.33
11194.15
61.55
17.55
32.53
3.35
17.74
47.16
17.74
47.16
17.74
47.16
8354.58
8668.9
=
.
.
.
.
= 15.26m
= 11.81m
..
Note: 10.3KN/m3
sewage unit weight
18KN/m2
soil unit weight
= 23.1m
22.8m
Figure 3.4
23.1 x 10 x4.7 x 10.3 = 11182.71KN
Cp4
Cp 6&8
Cp7
=
=
=
Cp3
x = 18.55m
y = 17.15m
Cp4
x = 3.95m
y =6.45m
Cp5
x = 18.55m
y =6.45m
Cp6
x = 15.325m
y = 23.225m
Cp7
x = 0.375m
y = 11.8m
Cp8
x = 15.325m
y = 0.375m
Table 3.2
Items
Wall 1
Wall 2
Wall 3
Wall 4
Wall 5
Wall 6
Wall 7
Wall 8
Wall 9
Wall 10
Base footing
Other loads
CP1
Cp2
CP3
CP4
CP5
CP6
CP7
CP8
Loading P
(KN)
1973.40
108.00
2063.00
1973.40
660.00
660.00
690.00
690.00
690.00
690.00
13020.12
180.84
386.25
1112.40
11182.71
2420.50
11182.71
1158.57
866.70
1158.57
52867.17
x (m)
15.7
3.95
15.7
15.7
1.22
1.22
6.68
6.68
30.42
30.42
15.33
15.33
3.95
3.95
18.55
3.95
18.55
15.325
0.375
15.325
Centroid
= 15.44m
x =
y=
= 11.72m
y (m)
22.38
19.35
11.83
1.22
6.45
17.15
6.45
17.15
6.45
17.15
11.8
11.8
20.9
15.75
17.15
6.45
6.45
23.225
11.8
0.375
Px
30982.4
426.6
32389.1
30982.4
803.0
803.0
4611.50
4611.50
20987.50
20987.50
199533.34
2771.37
1525.69
4393.98
207439.27
9560.98
207439.27
17755.09
325.01
17755.09
816083.54
Py
44171.3
2089.8
24405.3
2401.0
4257.0
11319.0
4450.50
11833.50
4450.50
11833.50
153637.42
2133.91
8072.63
17520.30
191783.48
15612.23
72128.48
26907.79
10227.06
434.46
619669.08