/ __________.
UM Equipment
During the above mentioned period, I was in Equipment Urea/DAP and involved in following
jobs.
Urea Plant:
Globe Valve installation in the Reactor (UR-211) sample point flushing line.
Power brushing and insulation removal as per CUI requirement of UH-421.
Arrangement of thickness monitoring of different points on URL/URG lines in Urea Wet
as per Inspection requirement.
Cantilever Scaffolding erection at URL/URG lines as per inspection requirement.
Misc. Scaffolding erection and removal jobs.
Misc. Leakage rectification Jobs at Urea Plant.
DAP Plant:
Self study:
SAP: