CEM417 - Group-Of-2 - Project No 2

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Group of 2 Assignment Jan-April2011

CEM417_group-of-2 -project no 2
1.0 Briefly explain the construction stages of highway project.
2.0 Explain how road/pavement deteriorations can be repaired. Provide pictures
and explain the right methods of pavement rehabilitation works.
3.0 List the types, functions and capabilities of stationary machines and moving
machine that are used at the construction sites.
4.0 Discuss the meaning of temporary work & permanent work in construction.
Provide examples for each term.
REPORT:
introduction
contents
conclusions
references

summary of topic; will be covered in TEST 2


Posted: March 8, 2011 in academician
0
TEMPORARY WORKS
-formwork
-scaffolding
-shoring
-trench support system
-underpining
PERMANENT WORKS
-rc technology
-precast concrete
-piling
-brick laying
LATEST TECHNOLOGY
IBS
GREEN BUILDING
GREEN CONSTRUCTION
SUSTAINABLE DEVELOPMENT in Infrastructure
maintenance works
restoration works

You might also like