Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

AIR COOLER SERVICE:

GAS OR VAPOR COOLER

FOR A COST ESTIMATE, ENTER THE

LIQUID COOLER:
GAS OR VAPOR COOLER:
NON-STM CONDENSER:
STEAM CONDENSER:
MIXED SERVICE

REQUIRED INFORMATION BELOW:

SELECT

(OPTIONAL)

A TYPE OF
SERVICE

BARETUBE COEFFICIENT, 'U'


HEAT DUTY, MMBTU/HR
HOT FLUID INLET TEMP, F
HOT FLUID OUT TEMP, F
INLET AIR TEMPERATURE, F
DO YOU WISH TO SPECIFY
TUBE ROWS AND LENGTH?
TUBE ROWS (3-10) =
LENGTH (50' MAX) =
ESTIMATED
DIMENSIONS: WITH -

E-1802

ITEM NO.:

CE INDEX FOR EQUIPMENT


(1978's = 243)
DESIGN PRESSURE, PSIG
METALLURGY CODE

75.00
1.100
252.45
115.00
95.00
YES
6
30.0

'

ESTIMATED COST OF SPECIFIED


UNIT WITH SPECIFIED
METALLURGY:
$23,758
TOTAL OPERATING FAN HP
3
CALCULATED TUBE ROWS
6
BARE TUBE AREA, FT
291

30.0 ' TUBES (SPECIFIED), MINIMUM WIDTH IS:

1'

Recommended air cooler specifications for preliminary estimate are:


30.0' Tube Length X 1' Total Width, 6 Tube Rows, 1 Bay With 2 - 20 HP Motor Fans

Source for ISO 9000 Considerations: YUBA Bulletin 21 - Air Cooled Exchangers, 1980

(YUBA no longer offers air cooled exchangers or this bulletin. Metallurgy cost
factors are courtesy of Hudson Engineering, Inc., Houston, Texas.)
Z:\225_Process\Calculations\Equipment\Exchangers\Air Coolers\[E-1802 air cooler.xls]Fast AC Method, Ver. 2.2

DATE:

04/12/06

CONTRACT NO.: 00A2MY000003


UNIT/AREA:

BY: GW
PURPOSE:

Husky Oil (Madura) Ltd.

18 - Condensate Stabilization and Storage and Gas Recompression

PROJECT NAME:
LOCATION:

CLIENT:

Madura BD Field Gas Plant

Kambing Island, Indonesia


CHK'D.: GND

243
1320
316

SHEET NO.:

ESTIMATE SIZE OF COMPRESSOR AFTER COOLER

1 OF 1

You might also like