A HYUNDAI SARULLA GEOTHERMAL POWER PROJECT
WORK NAME : PILE WORK WPS NO. | N/A
LOCATION : SIL POWER PLANT_OEC # 34 DWG NO. : N/A
NO. ITEM WELDER NO. WELD DATE VISUAL REMARK
i PHC PILE - 33 T-PILE-0006/12 21/04/2015, OK
2 PHC PILE - 22 T-PILE-0006/12 22/04/2015 OK
3 PHC PILE - 11. T-PILE-0006/12, 22/04/2015, OK
4 PHC PILE - 21 T-PILE-0006/12 23/04/2015, OK
5 PHC PILE - 31 T-PILE-0008/12 23/04/2015 OK
6 PHC PILE - 32 T-PILE-0005/12, 23/04/2015 OK
7 PHC PILE - 10 T-PILE-0005/12, 23/04/2015 OK
8 PHC PILE - 29 T-PILE-0008/12_ 23/04/2015 OK
E PHC PILE - 30 T-PILE-0008/12 23/04/2015 OK
REMARK
NO. CHECK ITEMS
1_| Any surface crack shall be not in the weld
2_ | There is no undercut on surface which is greater than 1/32 in. (0.8 mm) deep.
3_| Lack of fusion shall be not on the surface.
4_ [There is no incomplete penetration on the surface
SUB-
HDEC
CONTRACTOR | (Quality Control Engineer)
OWNER (If required)
Name: [ware fl E ~ Le
TAKASH | WAGANUMA
sep ota
Lie Fy
28 APR 20
Date: 25 Mil tas | 1B- AP@- rose
TAHYUNDAI SARULLA GEOTHERMAL POWER PROJECT
WORK NAME : PILE WORK WPS NO. : N/A
|LOCATION ; SIL POWER _OEC #34 DWG NO. : N/A
NO. ITEM WELDER NO. WELD DATE VISUAL REMARK
1 PHC PILE - 28 T-PILE 0008/12 24/04/2015 OK
2 PHC PILE - 08 T-PILE 0008/12 24/04/2015 OK
3 PHC PILE - 18 T-PILE 0005/12 24/04/2015 OK
REMARK ;
NO. CHECK ITEMS
1_| Any surface crack shall be not in the weld
2_| There is no undercut on surface which is greater than 1/32 in. (0.8 mm) deep.
3 _| Lack of fusion shall be not on the surface.
7 [Tiers b ng incomplete penetnten on te palace
SUB- HDEC ‘.
CONTRACTOR | (Quality Control Engincer) OWNER (itrequired)
Name: luce Eee akasnr MEAUIAA
an: | of lo— WAP
Date: og me we | og App reff 2? APR 201kAAHYUNDAI SARULLA GEOTHERMAL POWER PROJECT
WORK NAME : PILE WORK WPS NO, ; N/A
LOCATION : SIL POWER PLANT_OEC # 34 DWG NO. : N/A
NO. (TEM. WELDER NO. WELD DATE VISUAL REMARK
1 PHC PILE - 23 T-PILE-0006/12 25/04/2015 OK
2 [PHC PILE - 25 T-PILE-0006/12 25/04/2015 OK
3 PHC PILE - 07 T-PILE-0008/12, 25/04/2015 OK
4 PHC PILE - 06 T-PILE-0008/12. (25/04/2015 OK
5 | PHC PILE - 17 T-PILE-0006/12 25/04/2015 OK
6 PHC PILE - 26. T-PILE-0003/12 25/04/2015 OK
REMARK
NO. CHECK ITEMS
1_| Any surface crack shall be not in the weld
2_| There is no undercut on surface which is greater than 1/32 in. (0.8 mm) deep.
‘3 _| Lack of fusion shall be not on the surface.
4 | There is no incomplete penetration on the surface
SUB- HDEC
CONTRACTOR | (Quality Control Engincor)
OWNER (If required)
TAkASH | NAGANU MA
Name: | oito fh E fb
Sign: Kel ko Ll
Life Pk
Date: les Ame wis | t-app- wil 23 APR 20/8
IA HYUNDAI SARULLA GEOTHERMAL POWER PROJECT
WORK WANE PLE WORK WESNO_WA
LOCATION: Si POWER PLANT _OECH 34 DWGNO. WA
No. TEM | __ WELDER NO. WELD DATE ViSUAL REMARK
|_| PHEPLE=12 | T-Ple-o0oart2 27042015 OK
[PHC PILE 05 _|T-Pie 0008772 27/04015 OK
3_[ PHC BLE-07 | T-Fle-0008712 270472015; OK
(CPAP tae o005r Hara: ‘OK
—
I :
REMARK
NO. CHEGKTTENS
7 _ [Any surace srack shall be notin the weld
2 | Thereis no undercut on surface whieh is greater than 1182 n (0.8 mm) deo.
3 | Lackoffusion shall be not on the suface
4 | There is no incomplete penatraton on the surtace
ue conre967OR) soca oe enim OWNER requ)
iene wary BL + WAGGA MA
oni At E Vie a
Date Zribarts Apna hlpheae