Di Electrical Test

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

Test Procedure:

HV high voltage test: LV winding connected together and earthed. HV


winding connected together and given Following HV Supply for 1 minute.
LV high Voltage test: HV winding connected together and earthed. LV winding
connected together and given Following HV Supply for 1 minute.
433V Winding =3KV High Voltage
11KV Winding =28KV High Voltage
22KV Winding =50KV High Voltage
33KV Winding =70KV High Voltage.

(11) Di electrical Test:


Test Purpose:

To check the ability of main insulation to earth and between winding


To checks the insulation property between Primary to earth, Secondary to
earth and between Primary & Secondary.

Test Instruments:

3 Phase Variable Voltage & Frequency Source.


Auto Transformer.

Test Procedure:

The following Dielectric tests are performed in order to meet the transformer
insulation strength expectations.
Switching impulse test: to confirm the insulation of the transformer terminals
and windings to the earthed parts and other windings, and to confirm the
insulation strength in the windings and through the windings.
Lightning impulse test : to confirm the transformer insulation strength in
case of a lightning hitting the connection terminals
Separate source AC withstand voltage test: to confirm the insulation
strength of the transformer line and neutral connection terminals and the
connected windings to the earthed parts and other windings.
Induced AC voltage test (short duration ACSD and long duration ACLD ) : to
confirm the insulation strength of the transformer connection terminals and the
connected windings to the earthed parts and other windings, both between the
phases and through the winding.
Partial discharge measurement: to confirm the partial discharge below a
determined level property of the transformer insulation structure under
operating conditions.