MATERIAL SPECIFICATIONS

L. T. SWITCHGEAR(ACBs & MCCBs & MCBs)

II

ELCB/MCB/MCCB/DB

III

SWITCHES

IV

L.T. CABLES(ARMOURED)

PVC INSULATED COPPER CONDUCTOR WIRES &


CABLES(NON ARMOURED)

VI

TELEPHONE CABLES

VII

TUBELIGHT/BULB/CFL LAMP

VIII

PVC CONDUIT PIPES

IX

CEILING FAN

LUGS

XI

GLANDS

XI

LIGHT FIXTURES

XII

TV WIRING

XIII

EXHAUST FAN

XIV

CAPACITOR BANK

XV

CAPACITOR RELAYS

XVI

PVC CONDUIT PIPES

: L&T/LEGRAND/SCHNIEDER.
: L&T/LEGRAND/SCHNIEDER.
: MK/LEGRAND/SALZER.
: KEI/RALLISON/RR CABLE.

: FINOLEX/SUNDEEP/RR CABLE.
: DELTON/ITL/FINOLEX.
: PHILIPS/OSRAM.
: PRECISION/CIRCLE ARK.
: CROMPTON/ORIENT.
: DOWELLS'/LOTUS.
: COMET/BRACO.
: PHILIPS/WIPRO/APPROVED BY ARCHITECT.
: FINOLEX/POLIPLAST.
: CROMPTON/KHAITAN.
: EPCOS/MEHER.
: SIEMENS/L&T/SCHNIEDER.
: PRECISION/DIAMOND.

Comparative Statement
NO
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII

1)
2)
3)
4)
5)
6)
7)

Comparative Statement
Discription
GENERAL WIRING
DISTRIBUTION BOARDS/PANELS
LIGHTING, UPS, AC & POWER WIRING & CABLING
TV WIRING
RACEWAYS/M.S. BOXES
ACCESSORIES FIXING
PROVISION OF TEMPORARY WIRING
CABLE TRAYS/PVC CONDUIT PIPES/RUBBER MATTING
PREPARATION OF AS BUILT IN DRAWING
CAPACITOR BANK
SECURITY SYSTEM WIRING
MUSIC SYSTEM
POWER EARTHING SYSTEM

Rate per SQ.FT


Note.:The rate only items cost is not to be included in the final amount.
The cost of the light fixtures should comprise of the basic rate given + the labour + the profit.
The cost of VAT & Service tax should be levied at actuals.
The cost of the power sanction, liasioning with power supply company is to be done separately & hence has been
included in the costing.
The cost of the fire alarm system & access control system is not included in the estimate. Only the wiring is
included in the costing.
The cost of the music system speakers, wiring & volume control switch is included in the estimate. The
cost of the amplifier & mike system is not included in the estimate.
The cost of the lan cabling is not included in the estimate. Only the raceway & conduit pipes required along with
the floor junction boxes is included in the estimate.

Remark
Market Industry

Alpha Electricals

161500

550000

416732

895050

1176894

14100

Bad

255950

349553.75

Ok

775200

414609

Good

14000

Bad

78800

10000

253000

134000

120179

81500

Bad

0
3223100

152051
2630018.75

Good

15% PM

7.5% PM

241732.5

Good

Bad

334750