5.0 Installation of RC Pipe Culverts
5.0 Installation of RC Pipe Culverts
INSPECTION CHECKLIST
Scope of Work : Installation of RC Pipe Culverts
Project Title : COMMON ACCESS AND PERMANENT ROADS WITHIN THE RAPID SITE AT PENGERANG JOHOR
Description of Work
1
a
b
c
FOUNDATION
-
5
a
b
c
4
a
b
c
d
e
Remarks
- drawing approved
- layout/setting of structure
- others
3
a
b
c
d
e
f
NCR No
BEFORE INSTALLATION
2
a
b
c
d
Status
Pass
Fail
- concrete grade, ..
- sample test ( mm)
- others
Comments : _________________________________________________________________________________________________
_________________________________________________________________________________________________
________________________________________________________________________________________________
Checked By : _______________________________
(Project Manager / Site Engineer /
Site Supervisor / Authorised Personnel)
Name :
Date : _______________
Acknowledged By : ___________________________
(Sub-Contractor's Representative)
Name :
Date : _______________
Acknowledged By : ___________________________
(Client / Consultant)
Name :
Date : _______________
RAPID-P20C1-WCTB-QAC-IC-0005
REV : 0