WCT Berhad

INSPECTION CHECKLIST
Scope of Work :Earthworks

Filling To Form Formation Level


Project Title : COMMON ACCESS AND PERMANENT ROADS WITHIN THE RAPID SITE AT PENGERANG JOHOR.
Project Code : P20C1
Location :
Date of Inspection :
Time :
Item

Description of Work

Status
Pass

NCR No

Remarks

Fail

FILLING

- site clearing completed

- removal of topsoil as specified thickness

- earth material sampled, tested and approved prior to


filling (as per specification/ Work Quality Plan)

- cross-section survey of OGL before start filling

- install centre line and toe pegs/ limit of filling

- earth material from approved source

- others

DURING FILLING

- Filling in layers

- Compaction test in layers

- others

AFTER FILLING

- Check slope profile by survey/ slope measuring

- others

equipment as specified in the drawings

Comments : _______________________________________________________________________________________
_______________________________________________________________________________________

Checked By : _______________________________

Name :

Date : _________________

Acknowledged By : ___________________________
(Sub-Contractor's Representative)

Name :

Date : _________________

Acknowledged By : ___________________________
(Client / Consultant)

Name :

Date : _________________

(Project Manager / Site Engineer /


Site Supervisor / Authorised Personnel)

RAPID-P20C1-WCTB-QAC-IC-0023

REV : 0