Professional Documents
Culture Documents
A-18 Acceptance Item 310
A-18 Acceptance Item 310
A-18 Acceptance Item 310
In consideration of the satisfactory completion of Item 310 at the following locations / lot
nos. ______________, this certificate was issued as pre-requisite to open the said section(s) to
traffic, if necessary.
Submitted by:
Materials Engineer
Contractor
Checked by:
Materials Engineer
DPWH
Approved by:
Project Engineer
DPWH
A-18