P&I check Completion status

Boiler side
Sl
no
1.

Equipment
ID Fan A

2.

ID Fan - B

3.

FD fan A

4.

FD fan B

5.

PA fan A

6.

PA fan B

7.

SAPH A

8.

SAPH- B

9.

PAPH A

10.

PAPH - B

11.

13.

HFO / LDO
system
Boiler MFT &
page position
Mill - A

14.

Mill - B

15.

Mill - C

16.

Mill - D

17.

Mill - E

18.

Mill - F

19.

Mill - G

20.

Mill - H

21.

Mill - J

22.

Mill - K

12.

Planned

Actual

Reason for delay

P&I check Completion status


TG side
Sl
no
1.

Equipment
CW pump-A

2.

CW pump-B

3.

CW pump-C

4.

ACW pump-A

5.

ACW pump-B

6.

ACW pump-C

7.

SGECW pump-A

8.

SGECW pump-B

9.
10.

TGECW pump-A

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.

TGECW pump-B
TGECW pump-C
CEP-A
CEP-B
CEP-C
Cond. Vacuum
pump -1
Cond. Vacuum
pump -2
MDBFP-C
TDBFP-A
TDBFP-B
Main Turbine
Protection
Seal Oil System

Planned

Actual

Reason for delay

22.
23.

Primary Water
System
Control Fluid
System