Earthquake Geotechnical Engineering

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

LI

amax = 0.184x100.32M

Ha
3
depth (m) t (kn/m )
FC (%)
0
17.5
1.5
17.5
3
18
4.5
18
6
18.5
7.5
18.5
9
18.5

rd

SPT (N)
15
15
5
3
20
20
20

0
5
4
8
18
20
22

1
0.982
0.964
0.946
0.928
0.91
0.892

v'
0
26.25
53.25
80.25
108
135.75
163.5

0
26.25
53.25
70.25
83
95.75
108.5

Depth vs CSR
0.25
0.2

C
S
R

0.15
0.1
0.05
0
1

5
depth (m)

10

LIQUIFACTION ANALYSIS OF LAYERED SOIL


amax = 0.184x100.32MD-0.8 =2.3685 m/s2= 0.241g , where M=8, D= 65km
Hammer efficiency in SPT= 50%, GWL = 3.5m
max (n/mm)

cyc (N/mm2)

N60

CSR

N corrected due to v'

0
0
0
0
6.2123775 4.038045375 0.15383 4.166667
12.371253 8.04131445 0.151011 3.333333
18.2958765 11.89231973 0.169286 6.666667
24.153984 15.7000896 0.189158
15
29.7713325 19.35136613 0.202103 16.66667
35.147922 22.8461493 0.210564 18.33333

0
8.2535866823
4.6359372784
8.0724281651
16.7097835854
17.2861377961
17.8626207676

CRR vs Depth
0.3
0.25
0.2
C
R
R

0.15
0.1
0.05

10

0
1

5
Depth

10

Ncor due to FC
0
11.5450591695
4.6385567598
8.072428166
21.2025938676
21.7789480783
22.3554310498

CRR

FOS
0
--0.129096 0.839214
0.084066 0.556691
0.105062 0.620622
0.221447 1.170699
0.229717 1.136631
0.238603 1.133164

FOS vs Depth
1.4
1.2
1
F
O
S

0.8
0.6
0.4
0.2

10

0
1

5
Depth

Depth

Column O

10