Download as pdf
Download as pdf
You are on page 1of 1
B ASsesey = PE SCUARE OR CRCULAR ROLES TAROUGH THE FLOOR SHALER GR EQUAL TO YOM WL BE FIELD LOCATED AND PERFORMED mI TE FEL. 12> WE SQUARE Of CROUAR HOLES THROUGH THE RLOCR, BODER THAN Toten, SHALL BE MOICATED ON THE CONTRACTOR CRANES AND SHALL BE PROTECTED AND ROWFORCED MH CHE TOP PLATE FOED WH WELDING. TO THC GROOMED PLATE OR GRATING. |S MDI A HOLE OR OOING tS REGUNED TROUGH THE PLATFORM FLOOR, IT SHALL BE FORESEEN THAT PANELS MAT SURROUND IT MLL GE MOEPOXOEMT “aD PIECES. mh TS MANHER ISASSEMELY OF THE FLOOR FOR MANTENANCE CAN BE CARRIED OUT. A> FOR MR ADAASTHRIC OF MSTALLED PRESAGRICKTED HAORAL WHERE (T WTERFERES WAL PPES O PIPING SUPPORTS SHALL BC PERFORSED WTAE FL. WF TIS NECESSARY TO ALD NEW WERDR. POSTS, THAT ARE REQUIRED TO SUPPORT THE MANDRAL THESE WAL BC DONE TO ROALACE THE OMS 18 PROWOE 3 cm SIMS FOR EAD PLATE MOMENT CONMECTION AS REGURED FO ALLOW TOLERANCE. = THE TOLERANCES OF ASSEMELY WL GE GEM BY THE COMM HOM TEIB-E2 MD 1755-62 7 RL ME Mi AESSTANGE BELTS WL ASIN ASD, AL COWECTON SHALL BE TOATEMED acess TO THE TOROUE BECATE CM THE TABLE DCE c= TORR CONOHTIN OF om WORRICATED BOUTS, D> TGKTENMG TORE SHALL BE APVLED OH THE HUT, NEVER OH THE SCREW HEAD C= USE CALRRATED PRECISION TOOLS TO MEASURE TORGUE Te POCATE ToRS. > BeFone OF IME ASSENELY, IT MLL AE YERFED THAT ALL COMMECTONS ARE CLEANED AND FREE FROM STRANGE MATERIALS AS OR, RUST AD, ETC THe GENT IS RECURED, TF SHOULD BE MADE TH RAGS AMD SOLVENTS. CAREFULLY TO NOT REMOVE. THE PART OR GALYANUZATION. 9 FOF BCLTED MOMENT CORECTIONS, TOYTEMING OF SUCH CONNECTOR SHALL GE BY DRECT TENSION MOKCATOR

You might also like