Production Summary - Full Simulation: Loader (PRJ) CATERPILLAR 385C (Dec 2006)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Productivity

Production Summary - Full Simulation


Haulage System: Desmonte

Haul Cycle: [PRJ] Haul Cycle

Material: [PRJ] Waste Hard rock

Roster: [PRJ] 7 day Week - 12 Hour Shifts

Loader
Availability
Bucket Fill Factor
Average Bucket Load Volume
Average Payload
Operating Hours per Year
Average Operating Shifts per Year
Average Bucket Cycle Time
Production per Operating Hour
Production per Loader Operating Shift
Production per Year
Wait Time per Operating Hour

%
cu.metres
tonne
OpHr/Year
shifts/Year
min
tonne
tonne
tonne
min

Truck
Availability
Payload in Template
Operating Hours per Year
Average Payload
Production per Operating Hour
Production per Loader Operating Shift
Production per Year
Queue Time at Loader
Spot Time at loader
Average Loading Time
Average Travel Time
Spot Time at Dump
Average Dump Time
Average Cycle Time
Fleet Size
Average No. of Bucket Passes

%
tonne
OpHr/Year
tonne
tonne
tonne
tonne
min/ Cycle
min/ Cycle
min/ Cycle
min/ Cycle
min/ Cycle
min/ Cycle
min/ Cycle

[PRJ] CATERPILLAR 385C (Dec 2006)


90.00
0.83
2.88
4.87
4,847.83
Op. hrs factored by availability
493.00
Shifts factored by availability
0.58
176.90
1,740
Max. prod. based on 100% avail.
857,578 Avg. production factored by avail.
26.25
[PRJ] CATERPILLAR 773E Dual Slope Body
90.00
54.82
4,363.05
55.35
196.55
1,740
857,578
0.28
0.40
6.02
7.61
0.33
0.50
15.14
1
11.37

Haulage System
Production per Year
Discounted Capital Cost
Discounted Operating Cost
Discounted Average Cost
Excavation Target
Time to move Excavation Target
Loader Hrs to move Target
Total Truck Hrs to move Target
Total cost to move Target

tonne/Year
$/tonne
$/tonne
$/tonne
tonne
Days
Op. Hours.
Op. Hours.
$

857,578
1.97
1.72
3.69
797,192.00
339.53
4,506
4,056
2,939,216

Loading Methodology
Single Sided
Full Truck
Average for 150 Shifts

Productivity estimates allow for insufficient time at the end of the shift to complete another cycle.
Time for the first bucket pass coincides with the truck queuing and maneuvering times.
This simulation is based on data provided by the equipment manufacturer.
Equipment data should be checked to ensure it is valid for this site.

Page 1