Professional Documents
Culture Documents
Buk
Buk
12.72
3.75
0.05
0.75
152.4
152.4
Total
Timbunan pasir
Kerb tipe A1nh
Kolom beton bertulang termasuk bekisting
Pasangan batu
Plesteran
Pipa suling-suling
Siaran
12.72
3.75
0.05
0.75
96.9264
428.625
525.5514
96.9264
152.4
152.4
152.4
152.4
12.72
0.3 36.2857143 138.466286
12.72
0.5
152.4
969.264
3.75
0.7
152.4
400.05
1.5
0.3
152.4
68.58
0.5
0.5
152.4
38.1
Total
1475.994
1.65
152.4
251.46
0.5
152.4
Total
251.46
dipasang tiap jarak 2 m,
152.4
242.316
12.72
152.4 1938.528
m3
T.06
24142.25
12687993
m3
T.14c
134295
13016731
m
m3
m3
P.02d
B.15
P.01
163622.8 24936115
2557556 354135280
487712.5 719860724
m2
m2
45311.64
m
m2
P.16
P.03
11394065
11718 2839458.89
35565.2 68944136