Name: Jerome Daniel

Sponsor: Ministry of Community Development


Branch: Patna River Estate
Subject: Practical Assignment
Project : Give a cost of labour and material for wiring a
concrete house
Date:
Tuesday, August 05, 2014
Teacher: Evrith Richardson

Material
1 meter base
2 outdoor glands for cable
2 indoor glands
1 earth rod and clamp
10ft 16mm s/s green wire
6 clamps
1 pk and gypsum screws
1 8-10 circuit panel
5 20 amp s/p
1 15 amp s/p
2 30 amp s/p
2 rolls 2.5 ecc wire
1 roll 1.5 ecc
20 112v plugs
1 60 amp d/p breaker
2 40 amp d/p breaker
2 220 v plugs and covers
12 110 v switch and covers
30 2x4 pvc boxes
18 octagon boxes
3 GFCI plugs
Armoured cable
1 bundle conduit
4 dozen inch ends 12 collars
3 dozen ends 12 collars
Tape grery black brown green
Material cost:

Cost
300
50
40
90
12
30
50
550
200
40
80
1600
600
240
85
170
240
144
150
150
240
1800
300
180
150
32
$6811.00

Labor: $5000.00
8 days at $500 each
Laborer: 3 days at $325 each

Total cost

$11500.00