basement level compliances (as applicable, particularly on the matter of
setbacks from property lines);
open and covered parking compliances (including public transportation
connectivities);
percentage of site occupancy (PSO) and allowable maximum building
footprint (AMBF), including clear indications of the total open space within lot (TOSL) and the unpaved surface area (USA) that shall assist in surface water flow retardation (to prevent accelerated/ flash flooding) and percolation into the aquifer;