Contractor:

Suadi Pan Kingdom


(SAPAC)

KINGDOM OF SAUDI ARABIA

Consaltant:
Ital Consult (SAB)

Ministry of Transport

PROJECT: CONVERSION OF JEDDEH- JIZAN INTO EXPRESSSWAY 43.263 KILOMETER LENGTH (PAR-I)

ITEM No : ______
SUMMARY OF AGGREGATE BASE COURSE
SL NO

LOCATION

LENGTH

AREA

AREA

RIGHT SIDE

LEFT SIDE

TOTAL QTY

1
2
3
4
5
6
7
8
9
10
DONE QUANTITY OF AGGREGETE BASE COURSE =

TOTAL UPTO DATE QTY

TOTAL UNPAID QTY

PAID QTY. UOTO IPC # 42

THIS MONTH QTY

RESIDENT ENGINEER

CONSULTANT

QUQNTITY SURVEYOR

PRJECT MANAGER

CONTRACTOR

QUQNTITY SURVEYOR

CONSULTANT

CONTRACTOR

Consaltant:
Ital Consult (SAB)

TER LENGTH (PAR-I)

REMARKS

CU.M

Of

Drg No.

Drg No.

Contractor:
Saudi Pan Kingdom
(SAPAC)

KINGDOM OF SAUDI ARABIA


Ministry of Transport

Consultant:
Consult (SAB

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

ITEM NO : 20301
SUMMARY OF Roadway Excavation
SL NO

LOCATION

TOTAL QTY

SUMMARY OF CUTTING -I RIGHT Side

544,946.82

SUMMARY OF CUTTING -I Left Side

422,663.99

Bridge 128+129.575

12,472.93

Bridge 172+600

16,750.00

Bridge 191+021

14,700.00

Additional Scope of Work for Section-1

17,725.91

DEDUCTION

-2873

1,026,386.65

QUANTITY =

PROJECT MANAGER

CONTRACTOR

QUANTITY SURVEYOR

RESIDENT ENGINE

CONSULTANT

QUANTITY SURVEYO

Consultant:
Consult (SAB)

Ital

ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

NO : 20301

Roadway Excavation
REMARKS

Cu.m

RESIDENT ENGINEER

QUANTITY SURVEYOR

Contractor:
Saudi Pan Kingdom
(SAPAC)

KINGDOM OF SAUDI ARABIA


Ministry of Transport

Consultant:
Consult (SAB

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

ITEM NO : 20601
SUMMARY OF Embankment
SL NO

LOCATION

TOTAL QTY

SUMMARY OF FILLING-I RIGHT Side

139,965.23

SUMMARY OF FILLING-I Left Side

Bridge 128+129.575

480,331.55

Bridge 141+000

700,000.00

Bridge 172+600

498,917.00

Bridge 191+021

266,082.65

Additional Scope of Work for Section-1

DEDUCTION

(26,386.65)

DEDUCTION

(13,847.00)

76,111.34

4,161.65

2,125,335.77

QUANTITY =

PROJECT MANAGER

CONTRACTOR

QUANTITY SURVEYOR

RESIDENT ENGINE

CONSULTANT

QUANTITY SURVEYO

Consultant:
Consult (SAB)

Ital

ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

NO : 20601

OF Embankment
REMARKS

Cu.m

RESIDENT ENGINEER

QUANTITY SURVEYOR

Contractor:
Saudi Pan Kingdom
(SAPAC)

KINGDOM OF SAUDI ARABIA


Ministry of Transport

Consultant:
Ital Consult (S

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

ITEM NO : 20601
SUMMARY OF Sub Grade
SL NO

LOCATION

TOTAL QTY

SUMMARY OF Sub Grade-I Right Side

124,887.07

SUMMARY OF Sub Grade-II Right Side

114,134.72

SUMMARY OF Sub Grade-I ( LEFT Side)

142,623.09

SUMMARY OF Sub Grade-11 ( LEFT Side)

130,711.65

SUMMARY OF Sub Grade-SIDE SLOPE ( LEFT Side)

89,723.70

SUMMARY OF Sub Grade-SIDE SLOPE ( RIGHT Side)

74,490.71

Bridge 128+129.575

22,655.02

Bridge 172+600

Bridge 191+021

31,279.39

10

Additional Scope of Work for Section-1

11,040.79

11

Box Culverts Deduction

(428.48)

741,117.66

QUANTITY =

PROJECT MANAGER

CONTRACTOR

QUANTITY SURVEYOR

RESIDENT ENGIN

CONSULTANT

QUANTITY SURVE

Consultant:
Ital Consult (SAB)
ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

NO : 20601

Y OF Sub Grade
REMARKS
###
###
###
###
###
###
###
###
###
###

Agg. Base Course

Cu.m
B.B.C
B.W.C

###

###
###
B.W.C
RESIDENT ENGINEER

QUANTITY SURVEYOR

Contractor:
Saudi Pan Kingdom
(SAPAC)

Consultan
Ital Consul

KINGDOM OF SAUDI ARABIA


Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

ITEM NO : 3030101
SUMMARY OF AGGREGATE BASE COURSE GRADING
SL NO

LOCATION

TOTAL QTY

SUMMARY OF AGGREGATE BASE COURSE GRADING - I Right Side

80,239.57

SUMMARY OF AGGREGATE BASE COURSE GRADING - II Right Side

68,945.80

SUMMARY OF AGGREGATE BASE COURSE GRADING - I ( LEFT Side)

82,522.05

SUMMARY OF AGGREGATE BASE COURSE GRADING - II ( LEFT Side)

80,557.67

Bridge 128+129.575

21,027.35

Bridge 172+600

39,829.15

Bridge 191+021

46,715.79

Additional Scope of Work for Section-1

7,646.14

Box Culverts Deduction

(334.08)

427,149.44

QUANTITY =

PROJECT MANAGER

CONTRACTOR

QUANTITY SURVEYOR

RESIDENT EN

CONSULTANT

QUANTITY SU

CONTRACTOR

CONSULTANT

Consultant:
Ital Consult (SAB)

ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

O : 3030101

TE BASE COURSE GRADING


REMARKS
###
###
###
###
###
###
###
###

Cu.m

###

###

RESIDENT ENGINEER

QUANTITY SURVEYOR

KINGDOM OF SAUDI ARABIA

Contractor:
Saudi Pan Kingdom
(SAPAC)

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH)

ITEM NO : 4020102
SUMMARY OF
SL NO

Bituminous Prime Coat - Grade MC-I

LOCATION

SUMMARY OF Bituminous Prime Coat - Grade MC-I Right Side

SUMMARY OF MC - 01 ( LEFT Side)

Bridge 128+129.575

Bridge 172+600

Bridge 191+021

Additional Scope of Work for Section-1

Box Culverts Deduction

QUANTITY =

PROJECT MANAGER

CONTRACTOR

QUANTITY SURVEYOR

CONSULTANT

CONTRACTOR

CONSULTANT

Consultant:
Ital Consult (SAB)

ZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

M NO : 4020102

minous Prime Coat - Grade MC-I


TOTAL QTY

REMARKS

465,703.90

###

551,300.43

###

71,777.96

###

119,105.66

###

147,367.49

###

25,079.90

###

1,210.87

1,381,546.21

Sq.m

###

###

RESIDENT ENGINEER

QUANTITY SURVEYOR

Contractor:
Saudi Pan Kingdom
(SAPAC)

KINGDOM OF SAUDI ARABIA


Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH)

ITEM NO : 4050176
SUMMARY OF Bituminous Base Course ,Grade
SL NO

LOCATION

SUMMARY OF Bituminous Base Course ,Grade -l Right Side

SUMMARY OF Bituminous Base Course ,Grade -ll Right Side

SUMMARY OF BBC - 01 ( LEFT Side)

SUMMARY OF BBC - 02 ( LEFT Side)

Bridge 128+129.575

Bridge 172+600

Bridge 191+021

Additional Scope of Work for Section-1

Box Culverts Deduction

QUANTITY =

PROJECT MANAGER

CONTRACTOR

QUANTITY SURVEYOR

CONSULTANT

Consultant:
Ital Consult (SAB)

DAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

ITEM NO : 4050176

OF Bituminous Base Course ,Grade


TOTAL QTY

REMARKS

46,133.39

###

45,406.88

###

54,382.51

###

53,518.75

###

13,045.36

###

26,489.19

###

26,016.82

###

4,962.13

###

44.98

270,000.00

Cu.m

###
###

CONTRACTOR
RESIDENT ENGINEER

QUANTITY SURVEYOR

Contractor:
Saudi Pan Kingdom
(SAPAC)

KINGDOM OF SAUDI ARABIA


Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PAR

ITEM NO : 4050376
SUMMARY OF Bitumin Wearing Course, Grade
SL NO

LOCATION

SUMMARY OF Bitumin Wearing Course, Grade Right Side

SUMMARY OF BWC ( LEFT Side)

Bridge 128+129.575

Bridge 172+600

Bridge 191+021

Additional Scope of Work for Section-1

Quantities

PROJECT MANAGER

CONTRACTOR

QUANTITY SURVEYOR

CONSULTANT

Consultant:
Ital Consult (SAB)

AH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

ITEM NO : 4050376

F Bitumin Wearing Course, Grade


TOTAL QTY

REMARKS

22,526.10

###

26,522.57

###

2,638.09

###

7,820.22

###

6,237.09

###

1,255.93

###

67,000.00

Cu.m

###
###

RESIDENT ENGINEER

QUANTITY SURVEYOR

Contractor:
Saudi Pan Kingdom
(SAPAC)

KINGDOM OF SAUDI ARABIA


Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PA

ITEM NO : 9030301

SUMMARY OF Retroreflectorized Thermoplastic White Traffic Line


SL NO

LOCATION

SUMMARY OF Retroreflectorized Thermoplastic White Traffic Lines Right Side

SUMMARY OF White Line ( LEFT Side)

Bridge 128+129.575

Bridge 172+600

Bridge 191+021
Additional Scope of Work for Section-1

DONE QUANTITY OF White Line =

PROJECT MANAGER

CONTRACTOR

QUANTITY SURVEYOR

CONSULTANT

Consultant:
Ital Consult (SAB)

H - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

ITEM NO : 9030301

ectorized Thermoplastic White Traffic Lines


TOTAL QTY

REMARKS

3,645.00
4,331.25
12,884.25
15,957.00
20,263.00
201.92

57,282.421

Sq.m

RESIDENT ENGINEER

QUANTITY SURVEYOR

Contractor:
Saudi Pan Kingdom
(SAPAC)

KINGDOM OF SAUDI ARABIA


Ministry of Transport

Consultan
Ital Consult

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

ITEM NO : 9030302
SUMMARY OF Retroreflectorized Thermoplastic Yellow Traffic Lines
SL NO

LOCATION

TOTAL QTY

SUMMARY OF Retroreflectorized Thermoplastic Yellow Traffic Lines Right side

14,580.00

SUMMARY OF Yellow Line ( LEFT Side)

17,325.00

Bridge 128+129.575

Bridge 172+600

16,999.00

Bridge 191+021

4,124.82

Additional Scope of Work for Section-1

2,357.17

5,982.46

61,368.45

DONE QUANTITY OF Yellow Line =

PROJECT MANAGER

CONTRACTOR

QUANTITY SURVEYOR

RESIDENT ENGIN

CONSULTANT

QUANTITY SURVE

Consultant:
Ital Consult (SAB)

N ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

NO : 9030302

ed Thermoplastic Yellow Traffic Lines


REMARKS

Sq.m

RESIDENT ENGINEER

QUANTITY SURVEYOR

Contractor:
Saudi Pan Kingdom
(SAPAC)

KINGDOM OF SAUDI ARABIA


Ministry of Transport

Consultan
Ital Consult

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

ITEM NO : 9030701
SUMMARY OF SUMMARY OF Cat Eyes
SL NO

LOCATION

TOTAL QTY

SUMMARY OF Cat Eyes (Right Side)

SUMMARY OF Cat Eyes ( LEFT Side)

9,646

Bridge 128+129.575

1,708

Bridge 172+600

2,916

Bridge 191+021

2,732

Additional Scope of Work for Section-1

8121

377

25,500

DONE QUANTITY OF Cat Eyes =

PROJECT MANAGER

CONTRACTOR

QUANTITY SURVEYOR

RESIDENT ENGIN

CONSULTANT

QUANTITY SURVE

Consultant:
Ital Consult (SAB)

N ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

NO : 9030701

SUMMARY OF Cat Eyes


REMARKS

No.

RESIDENT ENGINEER

QUANTITY SURVEYOR

Summary of Section-1 Quantities

SL NO

Description

Cutting

17,725.91

5.00

Embankment

4,161.65

7.00

SubGrade

11,040.79

12.00

A.B.C

7,646.14

43.00

Mc-1

25,079.90

1.00

B.B.C

4,962.13

214.00

B.W.C

1,255.93

429.00

White line

201.92

20.00

Yellow line

2,357.17

20.00

10

Cat Eyes

376.92

22.00

Total Ammount

QTY

Unit

of Section-1 Quantities

Ammount
88,629.55
29,131.55
132,489.48
328,784.02
25,079.90
1,061,895.82
538,793.97
4,038.40
47,143.40
8,292.24

2,264,278.33