New Summary Earth Work
New Summary Earth Work
Consaltant:
Ital Consult (SAB)
Ministry of Transport
PROJECT: CONVERSION OF JEDDEH- JIZAN INTO EXPRESSSWAY 43.263 KILOMETER LENGTH (PAR-I)
ITEM No : ______
SUMMARY OF AGGREGATE BASE COURSE
SL NO
LOCATION
LENGTH
AREA
AREA
RIGHT SIDE
LEFT SIDE
TOTAL QTY
1
2
3
4
5
6
7
8
9
10
DONE QUANTITY OF AGGREGETE BASE COURSE =
RESIDENT ENGINEER
CONSULTANT
QUQNTITY SURVEYOR
PRJECT MANAGER
CONTRACTOR
QUQNTITY SURVEYOR
CONSULTANT
CONTRACTOR
Consaltant:
Ital Consult (SAB)
REMARKS
CU.M
Of
Drg No.
Drg No.
Contractor:
Saudi Pan Kingdom
(SAPAC)
Consultant:
Consult (SAB
ITEM NO : 20301
SUMMARY OF Roadway Excavation
SL NO
LOCATION
TOTAL QTY
544,946.82
422,663.99
Bridge 128+129.575
12,472.93
Bridge 172+600
16,750.00
Bridge 191+021
14,700.00
17,725.91
DEDUCTION
-2873
1,026,386.65
QUANTITY =
PROJECT MANAGER
CONTRACTOR
QUANTITY SURVEYOR
RESIDENT ENGINE
CONSULTANT
QUANTITY SURVEYO
Consultant:
Consult (SAB)
Ital
NO : 20301
Roadway Excavation
REMARKS
Cu.m
RESIDENT ENGINEER
QUANTITY SURVEYOR
Contractor:
Saudi Pan Kingdom
(SAPAC)
Consultant:
Consult (SAB
ITEM NO : 20601
SUMMARY OF Embankment
SL NO
LOCATION
TOTAL QTY
139,965.23
Bridge 128+129.575
480,331.55
Bridge 141+000
700,000.00
Bridge 172+600
498,917.00
Bridge 191+021
266,082.65
DEDUCTION
(26,386.65)
DEDUCTION
(13,847.00)
76,111.34
4,161.65
2,125,335.77
QUANTITY =
PROJECT MANAGER
CONTRACTOR
QUANTITY SURVEYOR
RESIDENT ENGINE
CONSULTANT
QUANTITY SURVEYO
Consultant:
Consult (SAB)
Ital
NO : 20601
OF Embankment
REMARKS
Cu.m
RESIDENT ENGINEER
QUANTITY SURVEYOR
Contractor:
Saudi Pan Kingdom
(SAPAC)
Consultant:
Ital Consult (S
ITEM NO : 20601
SUMMARY OF Sub Grade
SL NO
LOCATION
TOTAL QTY
124,887.07
114,134.72
142,623.09
130,711.65
89,723.70
74,490.71
Bridge 128+129.575
22,655.02
Bridge 172+600
Bridge 191+021
31,279.39
10
11,040.79
11
(428.48)
741,117.66
QUANTITY =
PROJECT MANAGER
CONTRACTOR
QUANTITY SURVEYOR
RESIDENT ENGIN
CONSULTANT
QUANTITY SURVE
Consultant:
Ital Consult (SAB)
ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3
NO : 20601
Y OF Sub Grade
REMARKS
###
###
###
###
###
###
###
###
###
###
Cu.m
B.B.C
B.W.C
###
###
###
B.W.C
RESIDENT ENGINEER
QUANTITY SURVEYOR
Contractor:
Saudi Pan Kingdom
(SAPAC)
Consultan
Ital Consul
ITEM NO : 3030101
SUMMARY OF AGGREGATE BASE COURSE GRADING
SL NO
LOCATION
TOTAL QTY
80,239.57
68,945.80
82,522.05
80,557.67
Bridge 128+129.575
21,027.35
Bridge 172+600
39,829.15
Bridge 191+021
46,715.79
7,646.14
(334.08)
427,149.44
QUANTITY =
PROJECT MANAGER
CONTRACTOR
QUANTITY SURVEYOR
RESIDENT EN
CONSULTANT
QUANTITY SU
CONTRACTOR
CONSULTANT
Consultant:
Ital Consult (SAB)
O : 3030101
Cu.m
###
###
RESIDENT ENGINEER
QUANTITY SURVEYOR
Contractor:
Saudi Pan Kingdom
(SAPAC)
Ministry of Transport
ITEM NO : 4020102
SUMMARY OF
SL NO
LOCATION
Bridge 128+129.575
Bridge 172+600
Bridge 191+021
QUANTITY =
PROJECT MANAGER
CONTRACTOR
QUANTITY SURVEYOR
CONSULTANT
CONTRACTOR
CONSULTANT
Consultant:
Ital Consult (SAB)
M NO : 4020102
REMARKS
465,703.90
###
551,300.43
###
71,777.96
###
119,105.66
###
147,367.49
###
25,079.90
###
1,210.87
1,381,546.21
Sq.m
###
###
RESIDENT ENGINEER
QUANTITY SURVEYOR
Contractor:
Saudi Pan Kingdom
(SAPAC)
ITEM NO : 4050176
SUMMARY OF Bituminous Base Course ,Grade
SL NO
LOCATION
Bridge 128+129.575
Bridge 172+600
Bridge 191+021
QUANTITY =
PROJECT MANAGER
CONTRACTOR
QUANTITY SURVEYOR
CONSULTANT
Consultant:
Ital Consult (SAB)
ITEM NO : 4050176
REMARKS
46,133.39
###
45,406.88
###
54,382.51
###
53,518.75
###
13,045.36
###
26,489.19
###
26,016.82
###
4,962.13
###
44.98
270,000.00
Cu.m
###
###
CONTRACTOR
RESIDENT ENGINEER
QUANTITY SURVEYOR
Contractor:
Saudi Pan Kingdom
(SAPAC)
ITEM NO : 4050376
SUMMARY OF Bitumin Wearing Course, Grade
SL NO
LOCATION
Bridge 128+129.575
Bridge 172+600
Bridge 191+021
Quantities
PROJECT MANAGER
CONTRACTOR
QUANTITY SURVEYOR
CONSULTANT
Consultant:
Ital Consult (SAB)
ITEM NO : 4050376
REMARKS
22,526.10
###
26,522.57
###
2,638.09
###
7,820.22
###
6,237.09
###
1,255.93
###
67,000.00
Cu.m
###
###
RESIDENT ENGINEER
QUANTITY SURVEYOR
Contractor:
Saudi Pan Kingdom
(SAPAC)
ITEM NO : 9030301
LOCATION
Bridge 128+129.575
Bridge 172+600
Bridge 191+021
Additional Scope of Work for Section-1
PROJECT MANAGER
CONTRACTOR
QUANTITY SURVEYOR
CONSULTANT
Consultant:
Ital Consult (SAB)
ITEM NO : 9030301
REMARKS
3,645.00
4,331.25
12,884.25
15,957.00
20,263.00
201.92
57,282.421
Sq.m
RESIDENT ENGINEER
QUANTITY SURVEYOR
Contractor:
Saudi Pan Kingdom
(SAPAC)
Consultan
Ital Consult
ITEM NO : 9030302
SUMMARY OF Retroreflectorized Thermoplastic Yellow Traffic Lines
SL NO
LOCATION
TOTAL QTY
14,580.00
17,325.00
Bridge 128+129.575
Bridge 172+600
16,999.00
Bridge 191+021
4,124.82
2,357.17
5,982.46
61,368.45
PROJECT MANAGER
CONTRACTOR
QUANTITY SURVEYOR
RESIDENT ENGIN
CONSULTANT
QUANTITY SURVE
Consultant:
Ital Consult (SAB)
NO : 9030302
Sq.m
RESIDENT ENGINEER
QUANTITY SURVEYOR
Contractor:
Saudi Pan Kingdom
(SAPAC)
Consultan
Ital Consult
ITEM NO : 9030701
SUMMARY OF SUMMARY OF Cat Eyes
SL NO
LOCATION
TOTAL QTY
9,646
Bridge 128+129.575
1,708
Bridge 172+600
2,916
Bridge 191+021
2,732
8121
377
25,500
PROJECT MANAGER
CONTRACTOR
QUANTITY SURVEYOR
RESIDENT ENGIN
CONSULTANT
QUANTITY SURVE
Consultant:
Ital Consult (SAB)
NO : 9030701
No.
RESIDENT ENGINEER
QUANTITY SURVEYOR
SL NO
Description
Cutting
17,725.91
5.00
Embankment
4,161.65
7.00
SubGrade
11,040.79
12.00
A.B.C
7,646.14
43.00
Mc-1
25,079.90
1.00
B.B.C
4,962.13
214.00
B.W.C
1,255.93
429.00
White line
201.92
20.00
Yellow line
2,357.17
20.00
10
Cat Eyes
376.92
22.00
Total Ammount
QTY
Unit
of Section-1 Quantities
Ammount
88,629.55
29,131.55
132,489.48
328,784.02
25,079.90
1,061,895.82
538,793.97
4,038.40
47,143.40
8,292.24
2,264,278.33