2 ENMAS GB POWER SYSTEMS PROJECTS LIMITED
. EPC DIVISION cB
ENMAS TRANSMITTAL - CLIENT/CONSULTANT
Transmittal No. EN14/H04C/0038 Date : 18/11/2015
[Project i x2.8 MW WASTE HEAT RECOVERY POWER GENERATION PROJECT for Mis. ONE ECO ENERGY,
[South Korea
|To IMs. Hyosung Corporation [Kind Atin: Wr KIOUGK PARK
|__|Seoul, Korea Project Manager
\Cc Jos MAKEN in, Korea ‘KIM, SUNG IL, President
[Dear Sirs,
fe are submitting the following Drawings / Documents for your review as indicated below.
[SiNo| Drawing/Document No. [Rev] Drawing/Document Title | Category of | Submitted] No of | Remarks
submission | ‘through | Copies
fi ere ores 207 Ri }avOOT oRawnnG OF TuRBO | NFORAIATION Era 7
ENERATOR BUILDING & ACC
fb} —enrerzronocanar Fb FOADOATAFORGUCT SUPPORT [RFORWATION Fai 7
kindly acknowledge the receipt of the above Drawings / Documents, and send baok yout.
lcomments/approval within 7 days from the date of submission oats COR any »
f 4 aa
lseeciac wove: Arr ki Dak Pork @ (Hyosune
ISUNG) €
Pew LD 4 x
For ENWAS GB POWER SYSTENS PROJECTS LMITED | Relnowedaementvan” "TaN 7
Mis.Hyosung Corporation
‘Seoul, Korea
Received hard copies __Nos. each ofthe above Inccated
Drgs Docs,
Gopinath
Lead Engineer Date Signature, Name & Company Sea!
FORMNO:4fea rome] alters i =
=m [on [om s ts coor
‘oman 8 (0) NaNO ‘o0) sao :
“SIvASaUita 40 “SON
Ou ® aWESHOSA 3a SuOddAS Aaod TWI0L
sloddns’ aaa St MOTE G3ANOIONT VAva_aVOT|
(90) ANaHOn
“WASUddd Hid SiNOdANS anos TwA04|
‘unlodans wad si MOvaa dauVolONt Viva avor|
Y
@
ae
Nt
“9
COhruRay
HYOSUNG
<
&
@
Aslesha (Ayilyam) nakshatra (Star) born baby names, Baby names start with De (डी), Du (डू), De (डे), Do (डो), குழந்தை பெயர்கள் ஆரம்பிக்கும் எழுத்து டி, டு, டே, டோ ஆயில்யம் நக்ஷத்திரத்தில் பிறந்த குழந்தை பெயர்கள் _