UPERC Approved Rates for Transmission & wh
and distribution licensee at ARR for Fy-2015-16
1 charges for open actess customer
“Transmission Charges(RSMWH) | For distribution Heensse m3
‘Open access customers connected at | 1723
|132ky voltage level
‘Open access customers connected | 129.2
above 132k¢ voltage level
“Transmission loses Inespectve ofthe voliage evelsat | 359%
which the consumers are connected with
| te gi
‘Wheeling charges for (Connocid a Tk 600
PVVNLIMVVNLPUVWNLIDVVNL | Conieted above TT 288.0
in vMWH
‘Wheeling losses for ‘Conese a Tk
PVVNLMVVNLIPuVVNLDVVNL. | Connected at above TIky
int
Wheeling charges or Keio in| Connected at 11k € 308
RsMWH ___ [Connected at above Tk 316.
‘Wheeling losses for Keo in®% | Connected at ITkv 3%
‘Connecied at above 11K 9%
Whesling charges for NPCL in| Connected at 1Tkv 107
RMWH ~ | Connected at above TT 155,
‘Wheeling Tosses for NPCL in % | Consieted at ITkv 155%
Connected above 11 146%UPERC Approved Rates for Cross Subsidy surcharges, Additional surcharge and
other charges for open necess customer. (for Fy-2015-16)
{items Category | Connected | Rate(Re/Mwh)
voltage
level
‘Gross subsidy surcharge for TVA | Connecid | 1660
PVVNLMVVNLPuVVNL/DVYNI in RwMwh | supply [at liky |
‘Connesid | 1030
above
ky
HV-2 [Connected | 530
supply. at 11kv
‘Connected | 230
above
ky
TV | Connecisd | 680
supply | above
13 ky
TV-4 | Connecisd 440
supply |at ky
‘Connesid | $30
| above
kv.
‘Gross subsidy surcharge for Kesco in RUMwh HV-1_ | Connected [1130
supply [at 11ky
‘Connosied | 880
| above
kv
FV2 | Connecied /300
supply [at ky
‘Connect | 750
at above
kv
‘Gross subsidy surcharge for NPCL in RSMwh | Hon'ble commission may review
from time to time.
‘Additional surcharge for Nit
PVVNLIMVVNL/PuVVNL/DVVNL/Kesco/NPCL
in RSMwh
Other charge for nr
PVVNL/MVVNL/PuVVNL/DVVNLiKesco/NPCL
in RSMwh 5