Open Access Charges PDF

You might also like

Download as pdf
Download as pdf
You are on page 1of 2
UPERC Approved Rates for Transmission & wh and distribution licensee at ARR for Fy-2015-16 1 charges for open actess customer “Transmission Charges(RSMWH) | For distribution Heensse m3 ‘Open access customers connected at | 1723 |132ky voltage level ‘Open access customers connected | 129.2 above 132k¢ voltage level “Transmission loses Inespectve ofthe voliage evelsat | 359% which the consumers are connected with | te gi ‘Wheeling charges for (Connocid a Tk 600 PVVNLIMVVNLPUVWNLIDVVNL | Conieted above TT 288.0 in vMWH ‘Wheeling losses for ‘Conese a Tk PVVNLMVVNLIPuVVNLDVVNL. | Connected at above TIky int Wheeling charges or Keio in| Connected at 11k € 308 RsMWH ___ [Connected at above Tk 316. ‘Wheeling losses for Keo in®% | Connected at ITkv 3% ‘Connecied at above 11K 9% Whesling charges for NPCL in| Connected at 1Tkv 107 RMWH ~ | Connected at above TT 155, ‘Wheeling Tosses for NPCL in % | Consieted at ITkv 155% Connected above 11 146% UPERC Approved Rates for Cross Subsidy surcharges, Additional surcharge and other charges for open necess customer. (for Fy-2015-16) {items Category | Connected | Rate(Re/Mwh) voltage level ‘Gross subsidy surcharge for TVA | Connecid | 1660 PVVNLMVVNLPuVVNL/DVYNI in RwMwh | supply [at liky | ‘Connesid | 1030 above ky HV-2 [Connected | 530 supply. at 11kv ‘Connected | 230 above ky TV | Connecisd | 680 supply | above 13 ky TV-4 | Connecisd 440 supply |at ky ‘Connesid | $30 | above kv. ‘Gross subsidy surcharge for Kesco in RUMwh HV-1_ | Connected [1130 supply [at 11ky ‘Connosied | 880 | above kv FV2 | Connecied /300 supply [at ky ‘Connect | 750 at above kv ‘Gross subsidy surcharge for NPCL in RSMwh | Hon'ble commission may review from time to time. ‘Additional surcharge for Nit PVVNLIMVVNL/PuVVNL/DVVNL/Kesco/NPCL in RSMwh Other charge for nr PVVNL/MVVNL/PuVVNL/DVVNLiKesco/NPCL in RSMwh 5

You might also like