Deliverables for Each Phase

Phases
Reservoir Engineering

Deliverables
1. Reservoir Engineering
Reservoir Data
Well Test Data
Reserves Estimation
Production Forecast
2. Reservoir Simulation
Model Set-Up
STOIIP value
Sensitivity Analysis
3. Reservoir management
Reservoir Management
Reservoir Surveillance

Drilling Engineering

1. Rig Selection
2. Well Trajectories
3. Casing Design
4. Bit Selection
5. Drilling Fluids System
6. Casing Cementation
7. Potential Drilling Hazards
8. Time and Cost Estimates
9. Drilling Optimization
10. New Drilling Technology Consideration

Production
Technology

1.
2.
3.
4.
5.
6.

Design Philosophy
Well Completion Plan
Wellhead and Christmas Tree Design
Inflow/Outflow Performance Predictions
Artificial Lift Selection
Possible Production Problems

Facilities Engineering

1.
2.
3.
4.
5.
6.
7.
8.

Design Basis and Philosophy


Concept Selection
Pipeline Sizing
Host Tie-In Facilities
Surface Facilities, Equipment
Platform Utilities and Service Facilities
Operation and Maintenance Philosophy
Abandonment

Economics

1.
2.
3.
4.
5.
6.
7.
8.

Fiscal Term
Economic Assumptions
Development Options and scenarios
Results
Net cash flow profile
Revenue Split
Sensitivity Analysis
Conclusion and Recommendation

HSE/Sustainable
Development

1.
2.
3.
4.
5.
6.
7.

HSE Management System and Leadership


Safety and Risk Management
Occupational Health Management
Quality Management
Environmental Management
Abandonment Options
Consideration of Sustainable Development Option