PHYSICAL PROGRESS REPORT/PERCENTAGE OF ACCOMPLISHMENT

For the Month of


Construction of Level II Brgy. Water System at Brgy. Cabangrayan

Name of Project:
Location:

ITEM N0.
I
II
III

DESCRIPTION
FORMWORKS AND
SCAFFOLDING
CONCRETE AND MASONRY
WORKS
PIPE LAYING AND FITTING
OF WORKS
TOTAL

QTY

UNIT

AMOUNT

WEIGHT
(% )

Planned
Actual
Planned
Actual
0.00
Planned
24.34
Actual
16.90

LOT

1.00

141,392.16

28.45

LOT

1.00

234,640.22

47.21

LOT

1.00

120,989.28
497,021.66

% PROGRESS (PLANNED)
PHYSICAL
% PROGRESS (ACTUAL)
% PROGRESS (PLANNED)
FINANCIAL
% PROGRESS (ACTUAL)

Physical
Target

100.00

PERIODIC
CUMULATIVE
PERIODIC
CUMULATIVE
PERIODIC
CUMULATIVE
PERIODIC
CUMULATIVE

AUGUST
1ST WEEK

2ND WEEK

14.22
10.16
###

14.22

14.22
14.22
16.90
16.90
14.22
14.22
16.90
16.90

52.05

28.45

14.22
6.744

84,017.23

3RD WEEK

75.66

4TH WEEK

10.16

23.60

2.34
19.25
11,648.81

14.22
28.45
2.34
19.25
14.22
28.45
2.34
19.25

Page 1

3.80 23.05
18,904.58

23.60
52.05
3.80
23.05
23.60
52.05
3.80
23.05

7TH WEEK

###
###
6.744
5.33
5.33
5.33
5.33
100,384.20
26,466.41

5.33
80.98
20.20
63.96
5.33
80.98
20.20
63.96

5.33
86.31
5.33
69.28
5.33
86.31
5.33
69.28

100.00

96.96

86.31SEPTEMBER 91.63
6TH WEEK

8.13
23.60 #
6.744
43.76

3.80
102,921.81

23.60
75.66
20.71
43.76
23.60
75.66
20.71
43.76

80.98

5TH WEEK

8TH WEEK

###

9TH WEEK

##

5.33

5.33

3.04

0.00

0.00

0.00

5.33
91.63
0.00
69.28
5.33
91.63
0.00
69.28

#
5.33
96.96
0.00
69.28
5.33
96.96
0.00
69.28

3.04
100.00
0.00
69.28
3.04
100.00
0.00
69.28