OREGON STATE UNIVERSITY CEM 383- Structures Ih
‘School of Civil and Construction Engineering
Recitation Assignment 4
Directions
In groups of 2 or 3 people, complete this assignment on this paper during the time allowed for recitation. Show
‘your work and box the final answers. You should check the answers with the instructor or TA before turning in
‘the assignment, so that you will likely get full credit. At
Problem 1.
The following bolted connections have (6) %" diameter bolts connecting a Hem Fir 2 x 12 toa Hem Fir glulam 3
1/8" x 15". The arrows represent a load applied to the side member. Find the reference design value of the bolt
for each connection athroughd. eee ape D: yard
| ec
000 o00
7
000 000
(a) (b)
ooo 000
ae 000 000‘OREGON STATE UNIVERSITY
CEM 383- Structures It
School of Civil and Construction Engineering
Problem 2.
Using Problem 1 connection (a), determine the geometry adjustment factor, C,. You will use the smallest
geometry factor when considering the end distance (NDS Table 11.5.1A) and the spacing between bolts (NDS
Table 11.5.18). The side member is Hem Fir 2x 12 and the main member is Hem Fir glulam 3 1/8” x15". Drawing
{is not to scale.
| _ actual Spa
e \ 2.25" *
oj 0 o-3# -?
000M . 3
3M” {i 4 \ 7OREGON STATE UNIVERSITY CEM 383- Structures It
School of Civil and Construction Engineering
Problem 3.
Using the connection configuration in Problem 2, determine the group action adjustment factor, C, following,
NDS 10.3.6
6 LBe¥ose \ Le
SA Ke
Em > Live hp
A le - y 2A a
Ee A
5 bot LEA
Ne ta),
aa
{x t oui
m A
lr, = 9.494 J MOS Eqn 7