Flow Clinker Flow Additive Flow Gypsum Flow Tailing Flow Fresh Feed
Flow Clinker Flow Additive Flow Gypsum Flow Tailing Flow Fresh Feed
Flow Clinker
Flow Additive
Flow Gypsum
Flow Tailing
Flow Fresh Feed
Total Sum
N
X clinker
X additive
X gypsum
MC clinker
MC additive
MC gypsum
T clinker
T additive
T gypsum
T tailing
T semen
T venting air
T reference
P dynamic(mmH2O)
P static (mmH2O)
Efficiency mill drive
149.1 ton/h
10.4 ton/h
4.9 ton/h
216.75 ton/h
164.5 ton/h
381.15 ton/h
6111.9 Kw
90.5 %
3%
6.5 %
0%
2.76 %
3.6 %
64.3 C
26.5 C
27 C
110 C
119 C
114.6 C
30 C
28.5 mmH2O
80.1 mmH2O
93 %
0.1764 ton/h
flow additive x MC additive
=
Total Kadar air
0.28704 ton/h
0.46344 ton/h
380.68656 ton/h
12840.74126494 kkal/TC
Qk
Qa
Duda
kkal/kg C
Pyroprocesing,ISBI
0.000 kkal/TC
0.187 kkal/kg C
-17.922 kkal/TC
Pyroprocesing,ISBI
Cpgypsum
Qgy
0.187 kkal/kg C
-7.239 kkal/TC
Qt
0.192 kkal/kg C
Pyroprocesing,ISBI
17125.914 kkal/TC
760 kkal/m2 h
5.20 m
17.60 m
((D/2)+L) x D x 3,14
=
329.826 m2
c. Water Evaporation
massa
Cp water (kalor jenis)
L (kalor laten)
Cp vapor (kalor jenis)
Temperature water
Temperature vapor
Temperatur reference
flow rate water injection
=
=
=
=
=
=
=
=
=
=
=
=
a
Cp(l)
Cp(g)
Pyroprocesing,ISBI
8742.729 kkal/TC
Qc
Pyroprocesing,ISBI
b
92.053
33.933
-0.039953
-0.008419
(S*k)/G
658.462 kkal/TC
3.893
1.003 kkal/kg K
542.180 kkal/kg
0.452 kkal/kg K
373 K
387.6 K
303.0
3430 l/h
3430 kg/h
3.430 ton/h
c
d
-0.000211 0.000001
0.000030 0.000000
Q evaporation
=
=
d. Venting air
Pressure dynamic(mbar) =
Pressure static (mbar) =
Koefisien Pitot Tube (k) =
Diameter duct
2.7949
7.8551
0.8470
1.2340 m
Velocity Gas
(k/s)*((2*9,8*d*Pd)^(1/2))
=
20.9075 m/s
Debit (Q)
V*A*3600
= 89971.3047 m3/h
Q*(273/(273+T)*((10336+Ps)/1033
=
63375.500 Nm3/h
= 1.166
Cpventing air
Qv
(Va x x Cp x T)/G
=
3935.269 kkal/TC
12850.741 kkal/TC
2545.263 kkal/TC
-17.992 kkal/TC
-0.007 kkal/TC
8742.729 kkal/TC
24120.734 kkal/TC
Cement heat
Radiation
Water evaporation
Venting air
Total
Q water
Q water
m
17125.914 kkal/TC
658.462 kkal/TC
6330.314 kkal/TC
3935.269 kkal/TC
28049.959 kkal/TC
= Q out -Q in
=
3929.225 kkal/TC
= ((m x Cp x T)+(m x L) +( m x Cpvapor x T))
= m{(Cp x T)+L+(Cpvapor x T)
= Qwater/{(Cp x T)+L+(Cpvapor x T)
=
6.3481554302 kg/TC
=
2416.657 kg/h
MC gypsum
MC additive
roprocesing,ISBI
roprocesing,ISBI
roprocesing,ISBI
roprocesing,ISBI
roprocesing,ISBI
thecementgrindingoffice.com
Duda
Holder Bank
Carl L. Yaws
engineeringtoolbox.com
Carl L. Yaws
e
75.53794 J/mol K
0.000000 34.04152 J/mol K
Carl L. Yaws
(m x L) +( m x Cpvapor x T))/G
Ket. Alat
d*Pd)^(1/2))
*((10336+Ps)/10336)
kg/m3
Perry
^2)*10^(-6) + 0(T^3Pyroprocesing,ISBI
Data
149.1 ton/h
10.4 ton/h
4.9 ton/h
216.75 ton/h
164.4 ton/h
381.15 ton/h
6111.9 Kw
90.5 %
3%
6.5 %
0%
2.76 %
3.6 %
124.3 C
26.5 C
27 C
110 C
119 C
114.6 C
0C
28.5 mmH2O
80.1 mmH2O
93 %
Flow Clinker
Flow Additive
Flow Gypsum
Flow Tailing
Flow Fresh Feed
Total Sum
N
X clinker
X additive
X gypsum
MC clinker
MC additive
MC gypsum
T clinker
T additive
T gypsum
T tailing
T semen
T venting air
T reference
P dynamic(mmH2O)
P static (mmH2O)
Efficiency mill drive
Moisture Content
Gypsum = flow gypsum x MC gypsum
=
0.1764 t/h
Additive = Flow additive x MC additive
=
0.28704 t/h
Total =
0.46344 t/h
Flow semen
= Total sum - Total MC
=
380.68656 t/h
Heat In
x N x 860 kkal/h
G
12840.7412649399 kkal/TC
0.190 kkal/kg C
9244.5546387622 kkal/TC
0.187431 kkal/kg C
131.9465506023 kkal/TC
0.211 kkal/kg C
70.5969516022 kkal/TC
0.188 kkal/kg C
11791.3438670699 kkal/TC
1 kkal/kg C
massa air x 1 x(30-0) kkal/TC
380.68656
34079.1832729765 + massa air x 1 x (30-0)
380.68656
Heat Out
Cement heat (Qc)
Cp cement =
0.189 kkal/kg C
Qc =
22526.1345914515 kkal/TC
tion/Convection heat (Qr)
Heat transfer factor (k) =
760 kkal/m2 h
meter effective mill (D) =
5.20 m
Length of mill (L) =
17.60 m
Surface area (S) = ((D/2)+L) x D x 3,14
=
329.8256 m2
Q = (S*k)/G
=
Water Evaporation
Cp water , liq =
250667.456 kkal/TC
0.458 kkal/kg C
Venting air
Pressure dynamic(mbar) =
Pressure static (mbar) =
Koefisien Pitot Tube (k) =
Diameter duct =
2.79489525 mbar
7.85512665 mbar
0.8470
1.2340 m
1.166 kg/m3
ENERGY BALANCE
Clinker =
Gypsum =
Addtitive =
Total
149.1
4.9
10.9
164.9
4.7236
10.11296
Temperature (C)
Material
Temperature (C)
Material
124.3 Clinker
27 Gypsum
119 Cement
110 Tailing
119 H20(steam)
H20(liquid)
3453660.05146243
kkal/TC
Water Injection
Tailing =
216.75 t/h
t/h
t/h
t/h
t/h
Cp(kcal/kg C)
A*T^0
B*T^1
0.1742
0.207
0.1742
0.1742
0.4445
C*T^2
1.414E-04
1.414E-04
1.414E-04
1.414E-04
2.910E-05
-1.283E-007
-1.283E-007
-1.283E-007
-1.283E-007
6.887E-07
C)
H2O =
0.46344
Cp
D*T^3
Cp
E*T^4
5.074E-011
5.074E-011
5.074E-011
5.074E-011
-3.726E-11
0
0
0
0
6.472E-15
0.190
0.211
0.189
0.188
0.458
t/h
380.68656 t/h
Data
Flow Clinker
Flow Additive
Flow Gypsum
Flow Tailing
Flow Fresh Feed
Total Sum
N
X clinker
X additive
X gypsum
MC clinker
MC additive
MC gypsum
T clinker
T additive
T gypsum
T tailing
T semen
T venting air
T reference
P dynamic(mmH2O)
P static (mmH2O)
Efficiency mill drive
149.1 ton/h
10.4 ton/h
4.9 ton/h
216.75 ton/h
164.4 ton/h
381.15 ton/h
6111.9 Kw
90.5 %
3%
6.5 %
0%
2.76 %
3.6 %
124.3 C
26.5 C
27 C
110 C
119 C
114.6 C
0C
28.5 mmH2O
80.1 mmH2O
93 %
Moisture Content
Gypsum = flow gypsum x MC gypsum
=
0.1764 t/h
Additive = Flow additive x MC additive
=
0.28704 t/h
Total =
0.46344 t/h
=
463.44 kg/h
Flow semen
= Total sum - Total MC
=
380.68656 t/h
Heat In
x N x 860 kkal/h
Grinding heat (Qg) =
G
=
12840.7412649399 kkal/TC
Clinker heat (Qk)
Cp Clinker =
0.190 kkal/kg C
9244.5546387622 kkal/TC
Qk =
Additive heat (Qa)
Cp Additive =
0.187431 kkal/kg C
135.6916398625 kkal/TC
Qa =
Gypsum heat (Qgyp)
Cp gypsum =
0.211 kkal/kg C
Qgyp =
73.2333522845 kkal/TC
Cement tailing heat (Qt)
Cp tailing =
0.188 kkal/kg C
Qt =
11791.3438670699 kkal/TC
Water Injection
Cp water =
1 kkal/kg C
massa air =
Qw =
=
Total Heat In
X
X * 1 *(30-0)
kkal/TC
380.68656
30*X
380.68656
34085.564762919 +
30*X
380.68656
Heat Out
Cement heat (Qc)
Cp cement =
0.189 kkal/kg C
Qc =
22526.1345914515 kkal/TC
Radiation/Convection heat (Qr)
Heat transfer factor (k) =
760 kkal/m2 h
Diameter effective mill (D) =
5.20 m
Length of mill (L) =
17.60 m
Surface area (S) = ((D/2)+L) x D x 3,14
=
329.8256 m2
Q = (S*k)/G
=
658.4615332887 kkal/TC
Water Evaporation
Cp water , steam =
0.459 kkal/kg C
laten heat of evaporation =
539 kkal/kg
Q=
(m*Cp*T)+(m*(laten heat of evaporation))
380.68656
=
((X+ moisture content )*0,459*(124,3-0))+((
380.68656
= ((X + 463,44)*57,0147) +((X+463,44)*539))
380.68656
Venting air
Pressure dynamic(mbar) =
Pressure static (mbar) =
Koefisien Pitot Tube (k) =
Diameter duct =
2.79489525 mbar
7.85512665 mbar
0.8470
1.2340 m
1.166 kg/m3
0.2300 kkal/kg C
Qv = (Va x x Cp x T)/G
=
5155.5974074378
ENERGY BALANCE
Heat Input
Grinding heat
Clinker heat
Additive heat
Gypsum heat
Cement tailing heat
Water Injection
Total
Heat Output
Cement heat
Radiation
Water evaporation
Venting air
Total
Perhitungan Water Spray
Qin = Qout
(34085,565 + Qwater injection)= (21788,320+Qevaporation)
5745.371 = Q evaporation - Q water injection
12840.741
9244.555
135.692
73.233
11791.344
.........
34085.565
22526.135
658.462
.....
5155.597
28340.194
Tailing =
216.75 t/h
H2O =
Water Injection = X
Clinker =
Gypsum =
Addtitive =
Total
149.1 t/h
4.9 t/h
10.4 t/h
164.4 t/h
Cp(kcal/kg C)
A*T^0
B*T^1
C*T^2
D*T^3
124.3 Clinker
0.1742
1.414E-04 -1.283E-007 5.074E-011
27 Gypsum
0.207
1.414E-04 -1.283E-007 5.074E-011
119 Cement
0.1742
1.414E-04 -1.283E-007 5.074E-011
110 Tailing
0.1742
1.414E-04 -1.283E-007 5.074E-011
124.3 H20(steam)
0.4445
2.910E-05
6.887E-07 -3.726E-11
H20(liquid)
Temperature (C)
Material
3453660.051
0.078804989
kkal/TC
28515.351
5570.214
kkal/TC
kkal/TC
kkal/TC
kkal/TC
kkal/TC
kkal/TC
+ ...... kkal/TC
kkal/TC
kkal/TC
kkal/TC
kkal/TC
+.......kkal/TC
SUM
X
276217.0573 566.01471
X+
0.46344 t/h
Water Injection
380.68656 t/h
E*T^4
0
0
0
0
6.472E-15
Cp
Satuan
0.190 kkal/kg
0.211 kkal/kg
0.189 kkal/kg
0.188 kkal/kg
0.459 kkal/kg
1 kkal/kg
C
C
C
C
C
C
Data
149.1
10.4
4.9
216.75
164.4
381.15
6111.9
90.5
3
6.5
0
2.76
3.6
120
26.5
27
110
119
114.6
0
28.5
80.1
93
Flow Clinker
Flow Additive
Flow Gypsum
Flow Tailing
Flow Fresh Feed
Total Sum
N
X clinker
X additive
X gypsum
MC clinker
MC additive
MC gypsum
T clinker
T additive
T gypsum
T tailing
T semen
T venting air
T reference
P dynamic(mmH2O)
P static (mmH2O)
Efficiency mill drive
Moisture Content
Gypsum = flow gypsum x MC gypsum
=
0.1764
Additive = Flow additive x MC additive
=
0.28704
Total =
0.46344
=
463.44
Flow semen
= Total sum - Total MC
=
380.68656
Heat In
x N x 860 kkal/h
G
12840.7412649399
0.189
8902.0499589432
0.187431
135.6916398625
0.211
73.2333522845
0.188
11791.3438670699
1
X
X * 1 *(30-0)
380.68656
30*X
380.68656
33743.0600830999
Heat Out
Cement heat (Qc)
Cp cement =
0.189
Qc =
22526.1345914515
Radiation/Convection heat (Qr)
Heat transfer factor (k) =
760
Diameter effective mill (D) =
5.20
Length of mill (L) =
17.60
Surface area (S) = ((D/2)+L) x D x 3,14
=
329.8256
Q = (S*k)/G
=
658.4615332887
Water Evaporation
Cp water , steam =
0.458
laten heat of evaporation =
539
Q=
(m*Cp*T)+(m*(laten heat of evapora
=
=
Venting air
Pressure dynamic(mbar) =
Pressure static (mbar) =
Koefisien Pitot Tube (k) =
Diameter duct =
380.68656
((X+ moisture content )*0,459*
((X + 2227,6)*86,3033) +((
380.68656
2.79489525
7.85512665
0.8470
1.2340
1.166
Cpventing air =
0.2300
Qv = (Va x x Cp x T)/G
=
5155.5974074378
ENERGY BALANCE
Heat Input
Grinding heat
Clinker heat
Additive heat
Gypsum heat
Cement tailing heat
Water Injection
Total
Heat Output
Cement heat
Radiation
Water evaporation
Venting air
Total
Perhitungan Water Spray
Qin = Qout
(42100,364 + Qwater injection)= (21788,320+Qevaporation)
ton/h
ton/h
ton/h
ton/h
ton/h
ton/h
Kw
%
%
%
%
%
%
C
C
C
C
C
C
C
mmH2O
mmH2O
%
Clinker =
Gypsum =
Addtitive =
Total
t/h
additive
t/h
t/h
kg/h
t/h
Temperature (C)
Temperature (C)
120
27
119
110
120
kkal/TC
kkal/kg C
kkal/TC
kkal/kg C
kkal/TC
kkal/kg C
kkal/TC
kkal/kg C
kkal/TC
kkal/kg C
kkal/TC
30*X
380.68656
kkal/kg C
kkal/TC
kkal/m2 h
m
m
m2
kkal/TC
kkal/kg C
kkal/kg
(m*(laten heat of evaporation))
kkal/TC
28515.351
5227.709
380.68656
moisture content )*0,459*(182,63-0))+((X + moisture content)*539)
380.68656
)*86,3033) +((X+2227,6)*539))
380.68656
mbar
mbar
m
T) x ((10336 + Ps)/10336)
kg/m3
T) x ((10336 + Pd)/10336)
kg/m3
Pd)^(1/2))
m/s
m2
m3/h
10336+Ps)/10336)
m3/h
kg/m3
kkal/kg C
12840.741 kkal/TC
8902.050 kkal/TC
135.692 kkal/TC
73.233 kkal/TC
11791.344 kkal/TC
......... kkal/TC
33743.060 + ...... kkal/TC
22526.135 kkal/TC
658.462 kkal/TC
..... kkal/TC
5155.597 kkal/TC
28340.194 +.......kkal/TC
poration)
Q water injection
6,3033) +((X+2227,6)*539))-(30X)
380.68656
49,27 + 539X + 1200676,4-30X
380.68656
92925,67
kg/h
563.9413873664
H2O =
Water Injection
Tailing =
216.75 t/h
149.1 t/h
4.9 t/h
10.9 t/h
164.9 t/h
Material
Cp(kcal/kg C)
Material
Clinker
Gypsum
Cement
Tailing
H20(steam)
H20(liquid)
A*T^0
B*T^1
C*T^2
D*T^3
E*T^4
0.1742
1.414E-04 -1.283E-007 5.074E-011
0
0.207
1.414E-04 -1.283E-007 5.074E-011
0
0.1742
1.414E-04 -1.283E-007 5.074E-011
0
0.1742
1.414E-04 -1.283E-007 5.074E-011
0
0.4445
2.910E-05
6.887E-07 -3.726E-11 6.472E-15
1
3444875.282
0.078804989
54.94138737
SUM
X
275256.1966 563.941387
0.46344 t/h
Water Injection
380.68656 t/h
Cp
Satuan
Cp
Satuan
0.189 kkal/kg
0.211 kkal/kg
0.189 kkal/kg
0.188 kkal/kg
0.458 kkal/kg
1 kkal/kg
C
C
C
C
C
C
Data
149.1
10.4
4.9
216.75
164.4
381.15
6111.9
90.5
3
6.5
0
2.76
3.6
124.3
26.5
27
110
119
114.6
0
28.5
80.1
93
Flow Clinker
Flow Additive
Flow Gypsum
Flow Tailing
Flow Fresh Feed
Total Sum
N
X clinker
X additive
X gypsum
MC clinker
MC additive
MC gypsum
T clinker
T additive
T gypsum
T tailing
T semen
T venting air
T reference
P dynamic(mmH2O)
P static (mmH2O)
Efficiency mill drive
Moisture Content
Gypsum = flow gypsum x MC gypsum
=
0.1764
Additive = Flow additive x MC additive
=
0.28704
Total =
0.46344
=
463.44
Flow semen
= Total sum - Total MC
=
380.68656
Heat In
x N x 860 kkal/h
G
12840.7412649399
0.190
9244.5546387622
0.187431
135.6916398625
0.211
73.2333522845
0.188
11791.3438670699
1
X
X * 1 *(30-0)
380.68656
30*X
380.68656
34085.564762919
Heat Out
Cement heat (Qc)
Cp cement =
0.189
Qc =
22526.1345914515
Radiation/Convection heat (Qr)
Heat transfer factor (k) =
760
Diameter effective mill (D) =
5.20
Length of mill (L) =
17.60
Surface area (S) = ((D/2)+L) x D x 3,14
=
329.8256
Q = (S*k)/G
=
658.4615332887
Water Evaporation
Cp water , steam =
0.459
laten heat of evaporation =
539
Q=
(m*Cp*T)+(m*(laten heat of evapora
380.68656
((X+ moisture content )*0,459
Venting air
Pressure dynamic(mbar) =
Pressure static (mbar) =
Koefisien Pitot Tube (k) =
Diameter duct =
2.79489525
7.85512665
0.8470
1.2340
1.166
Cpventing air =
0.2300
Qv = (Va x x Cp x T)/G
=
5155.5974074378
ENERGY BALANCE
Heat Input
Grinding heat
Clinker heat
Additive heat
Gypsum heat
Cement tailing heat
Water Injection
Total
Heat Output
Cement heat
Radiation
Water evaporation
Venting air
Total
Perhitungan Water Spray
Qin = Qout
(34085,565 + Qwater injection)= (21788,320+Qevaporation)
ton/h
ton/h
ton/h
ton/h
ton/h
ton/h
Kw
%
%
%
%
%
%
C
C
C
C
C
C
C
mmH2O
mmH2O
%
Clinker =
Gypsum =
Addtitive =
Total
t/h
additive
t/h
t/h
kg/h
t/h
Temperature (C)
Temperature (C)
124.3
27
119
110
124.3
kkal/TC
kkal/kg C
kkal/TC
kkal/kg C
kkal/TC
kkal/kg C
kkal/TC
kkal/kg C
kkal/TC
kkal/kg C
kkal/TC
30*X
380.68656
kkal/kg C
kkal/TC
kkal/m2 h
m
m
m2
kkal/TC
kkal/kg C
kkal/kg
(m*(laten heat of evaporation))
kkal/TC
28515.351
5570.214
380.68656
moisture content )*0,459*(124,3-0))+((X + moisture content)*539)
380.68656
0147) +((X+463,44)*539))
380.68656
mbar
mbar
m
T) x ((10336 + Ps)/10336)
kg/m3
T) x ((10336 + Pd)/10336)
kg/m3
Pd)^(1/2))
m/s
m2
m3/h
10336+Ps)/10336)
m3/h
kg/m3
kkal/kg C
12840.741 kkal/TC
9244.555 kkal/TC
135.692 kkal/TC
73.233 kkal/TC
11791.344 kkal/TC
......... kkal/TC
34085.565 + ...... kkal/TC
22526.135 kkal/TC
658.462 kkal/TC
..... kkal/TC
5155.597 kkal/TC
28340.194 +.......kkal/TC
poration)
Q water injection
0147) +((X+463,44)*539))-(30*X)
380.68656
2,8973 + 539X + 249794,16-30X
380.68656
6217,057
kg/h
566.0147101708
Tailing =
216.75 t/h
H2O =
Water Injection = X
149.1 t/h
4.9 t/h
10.4 t/h
164.4 t/h
Material
Cp(kcal/kg C)
X+
Material
Clinker
Gypsum
Cement
Tailing
H20(steam)
H20(liquid)
A*T^0
B*T^1
C*T^2
D*T^3
E*T^4
0.1742
1.414E-04 -1.283E-007 5.074E-011
0
0.207
1.414E-04 -1.283E-007 5.074E-011
0
0.1742
1.414E-04 -1.283E-007 5.074E-011
0
0.1742
1.414E-04 -1.283E-007 5.074E-011
0
0.4445
2.910E-05
6.887E-07 -3.726E-11 6.472E-15
1
3453660.051
0.078804989
57.01471017
SUM
X
276217.0573 566.01471
0.46344 t/h
Water Injection
380.68656 t/h
Cp
Satuan
Cp
Satuan
0.190 kkal/kg
0.211 kkal/kg
0.189 kkal/kg
0.188 kkal/kg
0.459 kkal/kg
1 kkal/kg
C
C
C
C
C
C
Data
149.1
10.4
4.9
216.75
164.4
381.15
6111.9
90.5
3
6.5
0
2.76
3.6
124.3
26.5
27
110
119
114.6
0
28.5
80.1
93
Flow Clinker
Flow Additive
Flow Gypsum
Flow Tailing
Flow Fresh Feed
Total Sum
N
X clinker
X additive
X gypsum
MC clinker
MC additive
MC gypsum
T clinker
T additive
T gypsum
T tailing
T semen
T venting air
T reference
P dynamic(mmH2O)
P static (mmH2O)
Efficiency mill drive
Moisture Content
Gypsum = flow gypsum x MC gypsum
=
0.1764
Additive = Flow additive x MC additive
=
0.28704
Total =
0.46344
=
463.44
Flow semen
= Total sum - Total MC
=
380.68656
Heat In
x N x 860 kkal/h
G
12840.7412649399
0.190
9244.5546387622
0.187431
135.6916398625
0.211
73.2333522845
0.188
11791.3438670699
1
X
X * 1 *(30-0)
380.68656
30*X
380.68656
34085.564762919
Heat Out
Cement heat (Qc)
Cp cement =
0.189
Qc =
22526.1345914515
Radiation/Convection heat (Qr)
Heat transfer factor (k) =
760
Diameter effective mill (D) =
5.20
Length of mill (L) =
17.60
Surface area (S) = ((D/2)+L) x D x 3,14
=
329.8256
Q = (S*k)/G
=
658.4615332887
Water Evaporation
Cp water , steam =
0.459
laten heat of evaporation =
539
Q=
(m*Cp*T)+(m*(laten heat of evapora
380.68656
((X+ moisture content )*0,459
Venting air
Pressure dynamic(mbar) =
Pressure static (mbar) =
Koefisien Pitot Tube (k) =
Diameter duct =
2.79489525
7.85512665
0.8470
1.2340
1.166
Cpventing air =
0.2300
Qv = (Va x x Cp x T)/G
=
5155.5974074378
ENERGY BALANCE
Heat Input
Grinding heat
Clinker heat
Additive heat
Gypsum heat
Cement tailing heat
Water Injection
Total
Heat Output
Cement heat
Radiation
Water evaporation
Venting air
Total
Perhitungan Water Spray
Qin = Qout
(34085,565 + Qwater injection)= (21788,320+Qevaporation)
ton/h
ton/h
ton/h
ton/h
ton/h
ton/h
Kw
%
%
%
%
%
%
C
C
C
C
C
C
C
mmH2O
mmH2O
%
Clinker =
Gypsum =
Addtitive =
Total
t/h
additive
t/h
t/h
kg/h
t/h
Temperature (C)
Temperature (C)
124.3
27
119
110
124.3
kkal/TC
kkal/kg C
kkal/TC
kkal/kg C
kkal/TC
kkal/kg C
kkal/TC
kkal/kg C
kkal/TC
kkal/kg C
kkal/TC
30*X
380.68656
kkal/kg C
kkal/TC
kkal/m2 h
m
m
m2
kkal/TC
kkal/kg C
kkal/kg
(m*(laten heat of evaporation))
kkal/TC
28515.351
5570.214
380.68656
moisture content )*0,459*(124,3-0))+((X + moisture content)*539)
380.68656
0147) +((X+463,44)*539))
380.68656
mbar
mbar
m
T) x ((10336 + Ps)/10336)
kg/m3
T) x ((10336 + Pd)/10336)
kg/m3
Pd)^(1/2))
m/s
m2
m3/h
10336+Ps)/10336)
m3/h
kg/m3
kkal/kg C
12840.741 kkal/TC
9244.555 kkal/TC
135.692 kkal/TC
73.233 kkal/TC
11791.344 kkal/TC
......... kkal/TC
34085.565 + ...... kkal/TC
22526.135 kkal/TC
658.462 kkal/TC
..... kkal/TC
5155.597 kkal/TC
28340.194 +.......kkal/TC
poration)
Q water injection
0147) +((X+463,44)*539))-(30*X)
380.68656
2,8973 + 539X + 249794,16-30X
380.68656
6217,057
kg/h
566.0147101708
Tailing =
216.75 t/h
H2O =
Water Injection = X
149.1 t/h
4.9 t/h
10.4 t/h
164.4 t/h
Material
Cp(kcal/kg C)
X+
Material
Clinker
Gypsum
Cement
Tailing
H20(steam)
H20(liquid)
A*T^0
B*T^1
C*T^2
D*T^3
E*T^4
0.1742
1.414E-04 -1.283E-007 5.074E-011
0
0.207
1.414E-04 -1.283E-007 5.074E-011
0
0.1742
1.414E-04 -1.283E-007 5.074E-011
0
0.1742
1.414E-04 -1.283E-007 5.074E-011
0
0.4445
2.910E-05
6.887E-07 -3.726E-11 6.472E-15
1
3453660.051
0.078804989
57.01471017
SUM
X
276217.0573 566.01471
0.46344 t/h
Water Injection
380.68656 t/h
Cp
Satuan
Cp
Satuan
0.190 kkal/kg
0.211 kkal/kg
0.189 kkal/kg
0.188 kkal/kg
0.459 kkal/kg
1 kkal/kg
C
C
C
C
C
C
Data
153
15
8
164
176
340
6432
88.8
7.14
3.8
0
6.6
15.47
182.63
35.23
35.43
110
105
120
0
26.724
67.66
93
Flow Clinker
Flow Additive
Flow Gypsum
Flow Tailing
Flow Fresh Feed
Total Sum
N
X clinker
X additive
X gypsum
MC clinker
MC additive
MC gypsum
T clinker
T additive
T gypsum
T tailing
T semen
T venting air
T reference
P dynamic(mmH2O)
P static (mmH2O)
Efficiency mill drive
Moisture Content
Gypsum = flow gypsum x MC gypsum
=
1.2376
Additive = Flow additive x MC additive
=
0.99
Total =
2.2276
=
2227.6
Flow semen
= Total sum - Total MC
=
337.7724
Heat In
x N x 860 kkal/h
G
15230.1182689882
0.196
16218.6380820195
0.18790242
293.9761621998
0.212
177.7736991716
0.188
10055.2166284682
1
X
X * 1 *(30-0)
380.68656
30*X
337.7724
41975.7228408473
Heat Out
Cement heat (Qc)
Cp cement =
0.188
Qc =
19707.5791912125
Radiation/Convection heat (Qr)
Heat transfer factor (k) =
760
Diameter effective mill (D) =
5.20
Length of mill (L) =
17.60
Surface area (S) = ((D/2)+L) x D x 3,14
=
329.8256
Q = (S*k)/G
=
742.1194153223
Water Evaporation
Cp water , steam =
0.473
laten heat of evaporation =
539
Q=
(m*Cp*T)+(m*(laten heat of evapora
=
=
Venting air
Pressure dynamic(mbar) =
Pressure static (mbar) =
Koefisien Pitot Tube (k) =
Diameter duct =
337.7724
((X+ moisture content )*0,459*
((X + 2227,6)*86,3033) +((
337.7724
2.620729146
6.63517939
0.8470
1.2340
1.166
Cpventing air =
0.2300
Qv = (Va x x Cp x T)/G
=
5844.8247740148
ENERGY BALANCE
Heat Input
Grinding heat
Clinker heat
Additive heat
Gypsum heat
Cement tailing heat
Water Injection
Total
Heat Output
Cement heat
Radiation
Water evaporation
Venting air
Total
Perhitungan Water Spray
Qin = Qout
(42100,364 + Qwater injection)= (21788,320+Qevaporation)
ton/h
ton/h
ton/h
ton/h
ton/h
ton/h
Kw
%
%
%
%
%
%
C
C
C
C
C
C
C
mmH2O
mmH2O
%
Clinker =
Gypsum =
Addtitive =
Total
t/h
additive
t/h
t/h
kg/h
t/h
Temperature (C)
Temperature (C)
182.63
35.43
105
110
182.63
kkal/TC
kkal/kg C
kkal/TC
kkal/kg C
kkal/TC
kkal/kg C
kkal/TC
kkal/kg C
kkal/TC
kkal/kg C
kkal/TC
30*X
337.7724
kkal/kg C
kkal/TC
kkal/m2 h
m
m
m2
kkal/TC
kkal/kg C
kkal/kg
(m*(laten heat of evaporation))
kkal/TC
25780.454
16195.269
337.7724
moisture content )*0,459*(182,63-0))+((X + moisture content)*539)
380.68656
)*86,3033) +((X+2227,6)*539))
337.7724
mbar
mbar
m
T) x ((10336 + Ps)/10336)
kg/m3
T) x ((10336 + Pd)/10336)
kg/m3
Pd)^(1/2))
m/s
m2
m3/h
10336+Ps)/10336)
m3/h
kg/m3
kkal/kg C
15230.118 kkal/TC
16218.638 kkal/TC
293.976 kkal/TC
177.774 kkal/TC
10055.217 kkal/TC
......... kkal/TC
41975.723 + ...... kkal/TC
19707.579 kkal/TC
742.119 kkal/TC
..... kkal/TC
5844.825 kkal/TC
26294.523 +.......kkal/TC
poration)
Q water injection
6,3033) +((X+2227,6)*539))-(30X)
337.7724
49,27 + 539X + 1200676,4-30X
337.7724
92925,67
kg/h
595.3033173365
H2O =
Water Injection
Tailing =
216.75 t/h
149.1 t/h
4.9 t/h
10.9 t/h
164.9 t/h
Material
Cp(kcal/kg C)
Material
Clinker
Gypsum
Cement
Tailing
H20(steam)
H20(liquid)
A*T^0
B*T^1
C*T^2
D*T^3
E*T^4
0.1742
1.414E-04 -1.283E-007 5.074E-011
0
0.207
1.414E-04 -1.283E-007 5.074E-011
0
0.1742
1.414E-04 -1.283E-007 5.074E-011
0
0.1742
1.414E-04 -1.283E-007 5.074E-011
0
0.4445
2.910E-05
6.887E-07 -3.726E-11 6.472E-15
1
3565741.154
0.078804989
86.30331734
SUM
X
1392925.67 595.303317
0.46344 t/h
Water Injection
380.68656 t/h
Cp
Satuan
Cp
Satuan
0.196 kkal/kg
0.212 kkal/kg
0.188 kkal/kg
0.188 kkal/kg
0.473 kkal/kg
1 kkal/kg
C
C
C
C
C
C