6.7 Worked Example For CT Requirements
6.7 Worked Example For CT Requirements
P54x/EN AP/Ja4
(AP) 6-85
6.7.1
6.7.2
Current differential Both If and X/R are to be calculated for a through fault
Distance Zone1 reach point case Both If and X/R are to be calculated for a fault at
Zone1 reach point
For calculating the CT requirements, the bus bar short time symmetrical fault rating shall
be considered as the bus fault level.
When there are only indicative X/Rs available, then the circuit breakers dc breaking
capacity shall be used to arrive at the primary time constant (and hence the primary
system X/R). The derivation shall be obtained from the circuit breaker manufacturer;
practical primary time constants arrived in such a way vary between 50 ms (applicable
for 66 kV and 132 kV breakers) and 120 ms (applicable for 220 kV and 400 kV
breakers). 150 ms is a practical figure for generator circuit breakers.
System data
In the following example, the following parameters have been considered for the CT
calculations:
System voltage - 230 kV
AP
System frequency - 50 Hz
System grounding - solid
Single circuit operation between Green Valley and Blue River
CT ratio - 1200/1
Line length - 100 kms
Line positive sequence impedance Z1
= 120 ms
= 37.7
Source angle
= tan-1 (X/R)
= tan-1 (37.7)
= 88.48 deg
P54x/EN AP/Ja4
Application Notes
(AP) 6-86
6.7.5
6.7.6
ZL
ZL
6.7.7
= 50.917 / 8.988
= 5.66
6.7.8
AP
6.7.9
6.7.10
= Zs + Zzone1
= 7.208 + j 41.397 ohms
= 42.019 ohms with an angle of 80 deg
6.7.11
= 41.397 / 7.208
= 5.74
6.7.12